Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 LAdmitted-Finance NO 172 VAZHAPANTAL ROAD STREET MAMBAKKAM ARCOT TALUK VELLORE DIST 632 318 | MAMBAKKAM | ARCOT TALUK | TAMIL NADU | 632318 | L1 | Admitted-Finance | |
| 2 | L2₹5.4 L+₹13,263.56 (2.54%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹6.2 L+₹1.0 L (19.2%)Admitted-Finance NO 15 KANNAGI NAGAR KORATTUR CHENNAI 600 080 | CHENNAI | CHENNAI | TAMIL NADU | 600080 | L3 | Admitted-Finance | |
| 4 | L4₹7.0 L+₹1.8 L (34.7%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | Rejected-Technical D NO 271D3 5 ANDAL PLOT NO 30 N0 76 DHARANI SQUARE PERAMANUR VILLAGE MARAMALI NAGAR CHENGALPATTU KANCHIPURAM 603 209 | CHENGALPATTU | KANCHIPURAM | TAMIL NADU | 603209 | - | Rejected-Technical Rejected |
| Sl No | Description | Qty | Unit | JAGAN ENTERPRISES L3 | PERUMAL.S.K L1 | R MANIVANNAN L4 | MP ELECTRICAL L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Supply, fabrication, sand blasting & Zinc painting of (125 x 65 /100x50) and MS angle, MS Channels various size including the cost of all materials, transport,labour,lead, lift etc., complete as per IS Specification and as directed by the dept.engineer at site. | 0.72 | MT | 95,000 ₹68,400 | 1,20,000 ₹86,400 | 60,000 ₹43,200 Lowest | 1,00,000 ₹72,000 |
| 2.00 | Labour for erection of structure including the cost of all labour, lead, lift etc., complete as directed by the dept.engineer at site. Light section structure. (Sectional weight below 14kg/m ) | 0.72 | MT | 15,000 ₹10,800 Lowest | 20,000 ₹14,400 | 20,000 ₹14,400 | 20,000 ₹14,400 |
| 3.00 | Labour charges for dismantling of structure including the cost of all labour, lead, lift etc., complete as per IS specification and as directed by the dept.engineer at site. Heavy section structure. (Sectional weight above 14kg/m) | 4 | MT | 10,000 ₹40,000 | 8,000 ₹32,000 | 16,000 ₹64,000 | 6,900 ₹27,600 Lowest |
| 4.00 | Labour for dismantling of structure including the cost of all labour, lead, lift etc., complete as directed by the dept.engineer at site. Light section structure. (Sectional weight below 14kg/m ) | 3 | MT | 12,000 ₹36,000 | 8,000 ₹24,000 Lowest | 8,000 ₹24,000 Lowest | 9,920 ₹29,760 |
| 5.00 | Labour charges for dismantling of breaker with own crane arrangement and connecting link rod, SF6 gas filling and other consumables as directed by the dept.engineer at site. 33/11 KV VCB | 12 | Nos. | 7,000 ₹84,000 | 10,000 ₹1,20,000 | 10,000 ₹1,20,000 | 5,500 ₹66,000 Lowest |
| 6.00 | Labour for dismantling wiith own crane arrangement, including providing holes wherever required, fixing junction box and other consumable as directed by the dept.engineer at site. 33/22/11 KV CT/PT | 36 | Nos. | 1,000 ₹36,000 | 1,000 ₹36,000 | 700 ₹25,200 | 600 ₹21,600 Lowest |
| 7.00 | Labour for dismantling of AB switches, including cost of lubricant, consumables and wiring for motor operated switches, alignment, checking of operation by both manual and electrical (if necessary) as directed by the field engineer- 33 KV and 11KV without earth hand operated. | 24 | Nos. | 7,000 ₹1,68,000 | 2,000 ₹48,000 Lowest | 6,000 ₹1,44,000 | 5,000 ₹1,20,000 |
| 8.00 | Labour for dismantling of strung bus including hoisting of insulators including the cost of all labour, lead,lift etc., complete as directed by the dept. engineer at site.33 KV and 11 KV single zebra conductor (1 span 3 runs) | 2 | Nos. | 8,000 ₹16,000 | 4,000 ₹8,000 Lowest | 7,000 ₹14,000 | 5,000 ₹10,000 |
| 9.00 | Labour for dismantling of bus bar including fabrication and any modification of end clamp wherever necessary and the cost of all labour, transport, T&P, lead,lift etc., complete as directed by the dept. engineer at site. Using 75 mm IPS AL tube without making bends. | 6 | Nos. | 500 ₹3,000 Lowest | 500 ₹3,000 Lowest | 500 ₹3,000 Lowest | 500 ₹3,000 Lowest |
| 10.00 | Labour for dismantling of bus bar including fabrication and any modification of end clamp wherever necessary and the cost of all labour, transport, T&P, lead,lift etc., complete as directed by the dept. engineer at site. Using 50 mm IPS AL tube without making bends. | 30 | Nos. | 500 ₹15,000 | 500 ₹15,000 | 500 ₹15,000 | 400 ₹12,000 Lowest |
Tender Value
₹7.8 L
EMD Value
₹7,800
Closing Date
8 Sept 2026, 2:00 pmClosed
SE/GCC-I/CNI
230 KV GIS SS COMPLEX, A-10, THIRU-VI-KA INDUSTRIAL ESTATE, GUINDY, CHENNAI-32.
as per NIT
2026_EB_698597_1
OT-019/26-27 of SE/GCC-I/CNI
Open Tender
Electrical Works
Works
120 days
Arani
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹7,800
Yes
25 Sept 2026
27 Aug 2026
9 Sept 2026
27 Aug 2026
8 Sept 2026
27 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply, fabrication, sand blasting & Zinc painting of (125 x 65 /100x50) and MS angle, MS Channels various size including the cost of all materials, transport,labour,lead, lift etc., complete as per IS Specification and as directed by the dept.engineer at site. | 0.72 | MT | - | - |
| 2 | Labour for erection of structure including the cost of all labour, lead, lift etc., complete as directed by the dept.engineer at site. Light section structure. (Sectional weight below 14kg/m ) | 0.72 | MT | - | - |
| 3 | Labour charges for dismantling of structure including the cost of all labour, lead, lift etc., complete as per IS specification and as directed by the dept.engineer at site. Heavy section structure. (Sectional weight above 14kg/m) | 4 | MT | - | - |
| 4 | Labour for dismantling of structure including the cost of all labour, lead, lift etc., complete as directed by the dept.engineer at site. Light section structure. (Sectional weight below 14kg/m ) | 3 | MT | - | - |
| 5 | Labour charges for dismantling of breaker with own crane arrangement and connecting link rod, SF6 gas filling and other consumables as directed by the dept.engineer at site. 33/11 KV VCB | 12 | Nos. | - | - |
| 6 | Labour for dismantling wiith own crane arrangement, including providing holes wherever required, fixing junction box and other consumable as directed by the dept.engineer at site. 33/22/11 KV CT/PT | 36 | Nos. | - | - |
| 7 | Labour for dismantling of AB switches, including cost of lubricant, consumables and wiring for motor operated switches, alignment, checking of operation by both manual and electrical (if necessary) as directed by the field engineer- 33 KV and 11KV without earth hand operated. | 24 | Nos. | - | - |
| 8 | Labour for dismantling of strung bus including hoisting of insulators including the cost of all labour, lead,lift etc., complete as directed by the dept. engineer at site.33 KV and 11 KV single zebra conductor (1 span 3 runs) | 2 | Nos. | - | - |
| 9 | Labour for dismantling of bus bar including fabrication and any modification of end clamp wherever necessary and the cost of all labour, transport, T&P, lead,lift etc., complete as directed by the dept. engineer at site. Using 75 mm IPS AL tube without making bends. | 6 | Nos. | - | - |
| 10 | Labour for dismantling of bus bar including fabrication and any modification of end clamp wherever necessary and the cost of all labour, transport, T&P, lead,lift etc., complete as directed by the dept. engineer at site. Using 50 mm IPS AL tube without making bends. | 30 | Nos. | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
OT019.pdf
Tender Documents • 0.91 MB
BOQ_839709.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .