Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹38.1 L
EMD Value
₹39,000
Closing Date
3 Aug 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Block Development office VP Kattakolathur
The Block Development office VP Kattakolathur
Providing Cement Concrete Road and RCC Slab Culvert to Pazhandiamman Koil Street in Anjur Panchayat at Kattankolathur Panchayat Union in Chengalpattu District
2022_RDTN_242498_1
1135/2022/A2 dt 15/7/22
Open Tender
Civil Works - Roads
Item Rate
180 days
Anjur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹39,000
Yes
4 Aug 2022
19 Jul 2022
4 Aug 2022
19 Jul 2022
3 Aug 2022
19 Jul 2022
90 days
Amount
Collection and supply of quarry rubbish from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Centering with shuttering for all cc works using Ms sheet with cost and conveyance incluidng all other labour charges etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum.
Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum.
Supply and fixing of Bituminous pad with cost and conveyance incluidng all other labour charges etc complete
Earth work excavation in hard soil etc complete
Filling with sand with cost and conveyance including all other labour charges etc complete
CC 1:4:8 mix using 40mm ISS HBG Metal with cost and conveyance including all other labour charges etc complete
Supply and fabrication of steel including cost and conveyance of all materials etc.,
Supply and Erecting Centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surface in all floors with all cross bracings using mild steel sheets of size 90x60cm & 10 gauge stiffened, welded with steel angle. Upto GL
Above GL
CC 1:3:6 mix using 40mm ISS HBG Metal with cost and conveyance including all other labour charges etc complete
RCC 1:1.5:3 mix using 20mm ISS HBG Metal with cost and conveyance including all other labour charges etc complete
Earthwork excavation for foundation in all soils and sub soils except hard rock requiring blasting inlcuidng all other labour charges etc complete
Supplying and filling in for foundation and basement with river sand in layers 15cm thick inlcuding watering ramming consolidation etc complete
CC 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
Towards the labour charges for centring th CC works and RCC works including all labour charges etc.complete.Upto GL
Above GL
Cement concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance and all labour charges etc.comlete
Supplying and fabrication of steel including cost and conveyance and all labour charges etc.complete.,
R.Cement concrete 1:1.5:3 mix using 20mm HBG metal including cost and conveyance and all labour charges etc.comlete
Cement concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance and all labour charges etc.comlete
Providing and fixing 12mm bituminous felt for extension joint between dirt wall and deck slab etc complete
Providing and fixing tar paper for bearing between bed block and deck slab etc complete
Providing weep holes in brick masonry/ stone masonry, plain/ reinforced concrete abutment, wing wall , return wall with 110mm dia pvc pipe extending thourgh width of the structure with slope 1(v):20( H) towards drawing face complete as per drawing and technical specifications clause 614,709,1204.37
Gravel filling between bodywall including cost and conveyance of gravel, labour for filling watering and compaction etc complete complying with standard specification and as directed by the departmental officers
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
R.RAMESH
stage.html
html • 0.02 MB
finance_286693.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .