| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.3 LAccepted-AOC BLDG NO XI 74 NEAR VALLARAM KULLANGARA TEMPLE KUNHIMANGALAM KOVVAPPURAM PO KANNUR DIST KERALA 670309 | KANNUR | KERALA | 670309 | L1 | Accepted-AOC LOWEST TENDERER | |
| 2 | L2₹7.6 L+₹25,464 (3.49%)Rejected-Finance | L2 | Rejected-Finance Other than lowest tenderer | |
| 3 | L3₹8.2 L+₹91,564 (12.5%)Rejected-Finance 50A 7B 5C UMARPUR NIWA DHOOMANGANJ PRAYAGRAJ UP | PRAYAGRAJ | UTTAR PRADESH | 211011 | L3 | Rejected-Finance Other than lowest tenderer | |
| 4 | L4₹9.6 L+₹2.3 L (31.5%)Rejected-Finance | L4 | Rejected-Finance Other than lowest tenderer |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
12 Dec 2022, 6:00 pmClosed
Lt Col Aditya Gorhe
GE Utility Bathinda Mil stn
REPAIR / MAINTENANCE OF EXISTING PIPE LINE (DI/CI/GI/PVC) AT MARRIED ACCOMMODATION OF SOUTH CAMPUS UNDER GE (U) BATHINDA.
2022_MES_562751_1
8680/2022-23/E8
Open Tender
Pipes and Pipe related activities
Item Rate
210 days
Garrison Engineer Utility Bathinda
Class E cat a ii
9 documents required · 9 mandatory
₹500
Garrison Engineer Utility Bathinda
₹20,000
Yes
19 Dec 2022
12 Nov 2022
14 Dec 2022
12 Nov 2022
12 Dec 2022
26 Nov 2022
Amount
Excavation in trenches, not exceeding 1.5 metre wide and not exceeding 1.5 metre in depth for pipe line etc. not exceeding 10 sqm area on plan and not exceeding 1.5 metre in depth and getting out in soft / loose soil complete all as specified.
Returning filling in including spreading, levelling, watering and well ramming in layers not exc 25 cm thick complete all as specified.
Removing excavated soil to a distance not exc 50 mtr and depositing where directed at a level not exc 1.5 mtr above the starting point complete all as specified.
Taking out from trenchs / from under roads existing old unservicable rusted / corroded GI pipe 100 mm bore and connections including all fittings complete all as specified and as directed.
All as per serial item No. 04 above but for GI pipe of 80 mm bore.
All as per serial item No. 04 above but for GI pipe of 50 mm bore.
All as per serial item No. 04 above but for GI pipe of 25 mm bore.
All as per serial item No. 04 above but for GI pipe of 20 mm bore.
Supplying, Laying, jointing and testing of Steel water tubing 100 mm bore ISI marked medium grade galvanised including tube fittings Viz Tees, Socket bends elbows, union nipple etc screwed and socketed joint laid in trenches/under road complete all as specified and directed.
All as per serial item No. 10 above but for GI pipe of 80 mm bore.
All as per serial item No. 10 above but for GI pipe of 50 mm bore.
All as per serial item No. 10 above but for GI pipe of 25 mm bore.
All as per serial item No. 10 above but for GI pipe of 20 mm bore.
Laying, jointing, commissioning & testing only in trenches old servicable GI pipe 100 mm bore after cleaning , removing rusted particle & mud particles of inside surfaces and outside surfaces of wall of pipe etc including supply and fixing new tube fittings Viz Tees, Socket bends elbows, union nipple etc screwed and socketed joint complete all as specified and directed.
All as per serial item No. 16 above but for GI pipe of 80 mm bore.
All as per serial item No. 16 above but for GI pipe of 50 mm bore.
All as per serial item No. 16 above but for GI pipe of 25 mm bore.
All as per serial item No. 16 above but for GI pipe of 20 mm bore.
Taking down from walls / ceilings/ laid in floors existing old unservicable rusted / corroded GI pipe 25 mm bore and connections including all fittings complete all as specified and directed.
All as per serial item No. 22 above but for GI pipe of 20 mm bore.
All as per serial item No. 22 above but for GI pipe of 15 mm bore. Note for serial item No. 22 to 24 The quoted rate against these items are deemed to be included for sorting out and stacking serviceable GI pipes for relaying / reuse under respective item from the unserviceable pipes.
Supplying, Laying, jointing and testing of Steel water tubing 25 mm bore medium grade, galvanised, ISI Marked including tube fittings Viz Tees, Socket bends elbows, union nipple etc screwed and socketed joint fixed to walls, ceiling or under floors etc complete all as specified and directed.
All as per serial item No. 25 above but for GI pipe of 20 mm bore.
All as per serial item No. 25 above but for GI pipe of 15 mm bore. Note for serial item No. 25 to 27 The cost of new GI fittings are included in these items and nothing extra shall be paid on this account.
Laying or Fixing, jointing and testing of old servicable GI pipe 25 mm bore after cleaning , removing rusted particle & mud particles of inside surfaces and outside surfaces of wall of pipe etc including Supply and fixing new tube fittings Viz Tees, Socket bends elbows, union nipple etc screwed and socketed joint fixed to walls, ceiling or under floors etc complete all as specified and directed.
All as per serial item No. 28 above but for GI pipe of 20 mm bore.
All as per serial item No. 28 above but for GI pipe of 15 mm bore. Note for serial item No. 28 to 30 (i).The cost of cleaning , removing rusted particle & mud particles of inside surfaces and outside surfaces of wall of pipe inclueded in this item and nothing extra shall be paid on this account. (ii) The cost of new tube fittings are included in this item and nothing extra shall be paid on this account. (iii). Old pipe fitting shall not be used in this item.
Supply and fixing in repair Gun metal globe or gate valve for 50 mm bore iron pipe , with iron wheel head, screwed both ends conforming to IS 778 - 1984 complete all as specified and directed.
Supply and fixing in repair Gun metal globe or gate valve for 25 mm bore iron pipe , with iron wheel head, screwed both ends conforming to IS 778 - 1984 complete all as specified and directed.
Supply and fixing in repair Gun metal globe or gate valve for 20 mm bore iron pipe , with iron wheel head, screwed both ends conforming to IS 778 - 1984 complete all as specified and directed.
Supply and fixing in repair Gun metal globe or gate valve for 15 mm bore iron pipe , with iron wheel head, screwed both ends conforming to IS 778 - 1984 complete all as specified and directed.
Supply and fixing in repair 80 mm dia flanged sluice valve , ISI marked PN 1.0 confirming to IS-14846-2000, both end flanged ,drilled , steel spindle and iron wheel handle , CI gate with MS ring including jointing material such as nuts, bolts, washers and rubber sheet complete all directed.
Supply and fixing in repair 100 mm dia flanged sluice valve , ISI marked PN 1.0 confirming to IS-14846-2000, both end flanged ,drilled , steel spindle and iron wheel handle , CI gate with MS ring including jointing material such as nuts, bolts, washers and rubber sheet complete all directed.
Supply and fixing in repair 150 mm dia flanged sluice valve , ISI marked PN 1.0 confirming to IS-14846-2000, both end flanged ,drilled , steel spindle and iron wheel handle , CI gate with MS ring including jointing material such as nuts, bolts, washers and rubber sheet complete all directed.
Supply and fixing in repair 200 mm dia flanged sluice valve , ISI marked PN 1.0 confirming to IS-14846-2000, both end flanged ,drilled , steel spindle and iron wheel handle , CI gate with MS ring including jointing material such as nuts, bolts, washers and rubber sheet complete all directed.
Supply and fixing stain less steel spindle of sluice valve 250 mm dia including nuts, bolts, washers and rubber sheet after taking out the unserviceable spindle by opening the top of sluice valve complete all as specified and directed.
Supply and fixing stain less steel spindle of sluice valve 200 mm dia including nuts, bolts, washers and rubber sheet after taking out the unserviceable spindle by opening the top of sluice valve complete all as specified and directed.
Supply and fixing stain less steel spindle of sluice valve 150 mm dia including nuts, bolts, washers and rubber sheet after taking out the unserviceable spindle by opening the top of sluice valve complete all as specified and directed.
Supply and fixing stain less steel spindle of sluice valve 100 mm dia including nuts, bolts, washers and rubber sheet after taking out the unserviceable spindle by opening the top of sluice valve complete all as specified and directed.
Supply and fixing stain less steel spindle of sluice valve 80 mm dia including nuts, bolts, washers and rubber sheet after taking out the unserviceable spindle by opening the top of sluice valve complete all as specified and directed.
M&L for run lead joint for 500 mm bore CI pipe including spun yarn complete all as specified and as directed.
M&L for run lead joint for 350 mm bore CI pipe including spun yarn complete all as specified and as directed.
M&L for run lead joint for 300 mm bore CI pipe including spun yarn complete all as specified and as directed.
M&L for run lead joint for 250 mm bore CI pipe including spun yarn complete all as specified and as directed.
M&L for run lead joint for 200 mm bore CI pipe including spun yarn complete all as specified and as directed.
M&L for run lead joint for 150 mm bore CI pipe including spun yarn complete all as specified and as directed.
M&L for run lead joint for 100 mm bore CI pipe including spun yarn complete all as specified and directed.
M&L for run lead joint for 80 mm bore CI pipe including spun yarn complete all as specified and directed.
Material and labour for detecting and repairing the water leakage in already laid CI / DI pipe line 500 mm bore including necessary excavation and earth work , bailing out stagnated /muddy water complete all as directed.
All as per serial item No. 52 above but for 300/350 mm bore CI/DI pipe line.
All as per serial item No. 52 above but for 250 mm bore CI/DI pipe line.
All as per serial item No. 52 above but for 200 mm bore CI/DI pipe line.
All as per serial item No. 52 above but for 150 mm bore CI/DI pipe line.
All as per serial item No. 52 above but for 100 mm bore CI/DI pipe line.
Material and labour for repair the leakage of GI pipe line of 100 mm dia by replacing the necessary new fittings such as elbows ,nipples union,reducers etc, GI pipe medium grade upto 1.00 mtr long as per site requirement if required, including earth work such as excavation , returning and removal and bailing out of stagnated / muddy water till restore the water supply complete all as directed.
All as per serial item No. 59 above but for 80 mm bore GI pipe line.
All as per serial item No. 59 above but for 40 mm/50 mm bore GI pipe line.
All as per serial item No. 59 above but for 25 / 32 mm bore GI pipe line.
All as per serial item No. 59 above but for 15/20 mm bore GI pipe line. Note for serial item No. 59 to 63 (i) The cost of excavation & earth work and new fittings such as elbows ,nipples union,reducers etc, and GI pipe medium grade upto 1.00 mtr long of required size are included in this item and nothing extra shall be paid on this account. (ii). Old pipe fittings shall not be used in this item.
Material and labour for detecting and repairing water leakage from the exising PVC pipe line of 110 mm bore including supply and fixing new PVC fittings of require size along with necessary new CI/ DI Joint, including necessay excavation earth work and bailing out stagnated / muddy water etc complete all as directed.
All as per serial item No. 64 above but for PVC pipe line 90/75 mm bore.
All as per serial item No. 64 above but for PVC pipe line 50/63 mm bore.
All as per serial item No. 64 above but for PVC pipe line 20/25 mm bore. Note for serial item No. 64 to 67 (i) Contractor shall depute Labour / Pipe Fitter and other require equipments such as JCB / Tractor and Fuel etc. to attend the leakage / complaint on daily basis as per complaints are traced out . (ii) Complete site for attending the leakage shall not be handed over to contractor at a time. Site of leakage only be handed over to the contractor on site requirement basis. (iii) Contractor / Supervisor shall collect complaint of leakage from concerned JE as daily basis and shall complete the complaint on the same day. (iv) If leakage again found during the currency period of contract at the repaired location, contractor shall repair again without any extra cost in terms of condition 46 of IAFW-2249 of General condtion of contracts. (v) Contractor shall provide equipments like JCB / tractor etc. and fuel at his own cost and arrangement for rectifying the complaint as per site requirement and nothing extra shall be paid on this account. (vi) The cost of Excavation & earth work is included in this item nothing extra shall be paid on this account. (vii)The cost of new PVC fittings along with necessary new CI/ DI Joint of required size are included in this item and nothing extra shall be paid on this account.(viii) Old pipe fittings shall not used in this item.
MODERN ENTERPRISES
SS CONSTRUCTION
M/s Kataria Construction Company
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .