Loading…
Loading…
Tender Value
₹1.7 L
EMD Value
₹3,400
Closing Date
13 Jul 2026, 12:00 pm5d left
Arvind
DIV 2 Panchkula
Balance civil work of chamber constructed at new T/well along Ghaggar Sector 27, Panchkula complete in all respect and all other works contingent thereto (A/mtc of PH services in Sector 23 to 28, 31 and 32 and Sector 1 to 6 , MDC, Panchkula)
2026_HBC_533791_1
20264C0C0DF8 1891 4519 9C87 B5673B099062270HSV
Open Tender
Civil Works
60 days
Panchkula
2 documents required · 2 mandatory
₹250
₹3,400
Yes
6 Jul 2026
6 Jul 2026
13 Jul 2026
6 Jul 2026
13 Jul 2026
6 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. | 22.09 | cum | 1,863 | ₹41,153.67 |
| 2 | [10.2]Supplying and filling in plinth with sand (conforming to zone-IV, IS 1542) under floors, including watering, ramming, consolidating and dressing complete. | 23.67 | cum | 826 | ₹19,551.42 |
| 3 | [11.60]Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. | 136 | Sqm | 59 | ₹8,024 |
| 4 | [11.66.2]Distempering with 1st quality acrylic distemper, having VOC (Volatile Organic Compound ) content less than 50 grams/ litre, of approved brand and manufacture, including applying additional coats wherever required, to achieve even shade and colour. 2. Two coats | 64.68 | Sqm | 28 | ₹1,811.04 |
| 5 | [11.67.1]Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface : 1. Water thinnable cement primer | 136 | Sqm | 22 | ₹2,992 |
| 6 | [11.68.1]Applying priming coat: 1. With ready mixed pink or Grey primer of approved brand and manufacture on wood work (hard and soft wood) | 15 | Sqm | 22 | ₹330 |
| 7 | [11.82.1]Painting the wooden / metal surface with synthetic enamel paint of approved brand and manufacture to give an even shade : 1. Two or more coats on new work | 16.55 | Sqm | 49 | ₹810.95 |
| 8 | [11.95.1]Finishing walls with Acrylic Smooth exterior paint of required shade : 1. New work (Two or more coat applied @ 1.67 litre/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) | 71.31 | Sqm | 88 | ₹6,275.28 |
| 9 | [4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. | 10.47 | cum | 83 | ₹869.01 |
| 10 | [6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 14.81 | cum | 3,476 | ₹51,479.56 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_612865.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid