Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAccepted-AOC O 101 PHASE 2 PALLAVPURAM MEERUT | MEERUT | MEERUT | UTTAR PRADESH | ₹1.9 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.9 CrRejected-Finance A 51 SHALIMAR GARDEN EX 2 SAHIBABAD DISTRICT GHAZIABAD UTTAR PRADESH | SAHIBABAD | GHAZIABAD | UTTAR PRADESH | ₹1.9 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹2.0 CrRejected-Finance | ₹2.0 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹2.2 CrRejected-Finance SATHINI IGLAS ALIGARH | ALIGARH | ₹2.2 Cr | L4 | Rejected-Finance L4 |
| 5 | Rejected-Technical | - | - | Rejected-Technical Non-Responsive |
| Sl No | Description | Qty | Unit | M/S RAVINDRA CHAUDHARY L1 | ARTIST BRO L2 | M/s Pathak and Company L4 | SUNRISE BUILDERS AND DEVELOPERS L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Cleaning thick bushes and thorny jungle without uprooting. | 16,200 | Sqm | 3.1 ₹50,220 | 10 ₹1.6 L | 7.35 ₹1.2 L | 4.5 ₹72,900 |
| 2.00 | Earth work in foundation in ordinary soil (loam clay or sand) including lift upto 1.5 m and lead upto 30 m i/c all labour material and T&P required for proper completion of work. | 771.83 | Cum | 70.42 ₹54,354.58 | 100 ₹77,183 | 78.2 ₹60,357.11 | 70 ₹54,028.10 |
| 3.00 | Providing and laying Cement concrete (1:4:8) in base with cement , coarse sand , and 20mm to 40mm stone ballast including cost of all material, labour and T&P etc.complete. | 121.29 | Cum | 3,317.67 ₹4.0 L | 5,000 ₹6.1 L | 3,210.75 ₹3.9 L | 3,650 ₹4.4 L |
| 4.00 | Ordinary centering and shuttering for CC work excluding cost of all material & incduding labour and T&Petc.complete. | 4,094 | Sqm | 404.96 ₹16.6 L | 300 ₹12.3 L | 391 ₹16.0 L | 420 ₹17.2 L |
| 5.00 | Centering & shuttering for R.C.C. work including cost of centering & shuttering up to 3.0 m. height. | 88 | Sqm | 566.95 ₹49,891.25 | 550 ₹48,400 | 571.2 ₹50,265.60 | 615 ₹54,120 |
| 6.00 | Providing and laying steel reinforcement (T.M.T. bars) i/c cutting, binding, bending, and binding wire i/c all labour material T&P required for proper completion of work. | 0.75 | MT | 47,584.1 ₹35,688.08 | 75,000 ₹56,250 | 52,615.68 ₹39,461.76 | 60,000 ₹45,000 |
| 7.00 | Providing and laying C.C. (1:1.5:3) including cost of all material, labour and T&P etc.complete. | 379.62 | Cum | 4,052.76 ₹15.4 L | 5,200 ₹19.7 L | 4,080 ₹15.5 L | 4,400 ₹16.7 L |
| 8.00 | Providing and laying R.C.C. (1:1.5:3) including cost of all material, labour and T&P etc.complete. | 11.99 | Cum | 4,507 ₹54,038.93 | 5,500 ₹65,945 | 4,481.4 ₹53,731.99 | 4,900 ₹58,751 |
| 9.00 | Finishing walls with Acrylic Smooth exterior paint of required shade of New work i/c all labour material and T&P required for proper completion of work. (Height of wall H= 6 feet say 1.83 m) | 29,646 | Sqm | 82.17 ₹24.4 L | 100 ₹29.6 L | 95.2 ₹28.2 L | 90 ₹26.7 L |
| 10.00 | Providing & Fixing of precast prestressed 6 feet height Boundary wall complete i/c all labour material and T&P required for proper completion of work. | 8,100 | RM | 1,496.6 ₹1.2 Cr | 1,400 ₹1.1 Cr | 1,802 ₹1.5 Cr | 1,622 ₹1.3 Cr |
Tender Value
₹3.2 Cr
EMD Value
₹6.3 L
Closing Date
23 Feb 2026, 1:00 pmClosed
Superintending Engineer
3rd Circle Irrigation Works, 139 Mall Road Pratappura, Agra
Construction of boundary wall for Safety of Department land of Located in Haryana State.
2026_UPIDC_1115268_1
15/SE/2025-26
Open Tender
Civil Works
180 days
Haryana State
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,130
₹6.3 L
Office of The SE 3rd Circle Irrigation Works, Agra
18 Mar 2026
16 Feb 2026
23 Feb 2026
16 Feb 2026
23 Feb 2026
16 Feb 2026
19 Feb 2026
Cleaning thick bushes and thorny jungle without uprooting.
Earth work in foundation in ordinary soil (loam clay or sand) including lift upto 1.5 m and lead upto 30 m i/c all labour material and T&P required for proper completion of work.
Providing and laying Cement concrete (1:4:8) in base with cement , coarse sand , and 20mm to 40mm stone ballast including cost of all material, labour and T&P etc.complete.
Ordinary centering and shuttering for CC work excluding cost of all material & incduding labour and T&Petc.complete.
Centering & shuttering for R.C.C. work including cost of centering & shuttering up to 3.0 m. height.
Providing and laying steel reinforcement (T.M.T. bars) i/c cutting, binding, bending, and binding wire i/c all labour material T&P required for proper completion of work.
Providing and laying C.C. (1:1.5:3) including cost of all material, labour and T&P etc.complete.
Providing and laying R.C.C. (1:1.5:3) including cost of all material, labour and T&P etc.complete.
Finishing walls with Acrylic Smooth exterior paint of required shade of New work i/c all labour material and T&P required for proper completion of work. (Height of wall H= 6 feet say 1.83 m)
Providing & Fixing of precast prestressed 6 feet height Boundary wall complete i/c all labour material and T&P required for proper completion of work.
Steel work welded in builtup sections /framed work ,including cutting ,housting ,fixing in position i/c all labour material and T&P required for proper completion of work.
Painting (Two) coat on New steel surface over priming coat on steel and other metal surfaces required for proper completion of work.
Providing and Fixing Sign board
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.34 MB
BOQ_2069074.xls
BOQ • 5.85 MB
TenderDocument15.pdf
Tender Documents • 1.60 MB
Download all tender documents and submit your bid