Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC | ₹1.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.2 Cr+₹1.0 L (0.84%)Rejected-AOC | ₹1.2 Cr+₹1.0 L (0.84%) | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | PERIYASAMY P CONTRACTOR L1 | M MUTHUKANNAN L2 |
|---|---|---|---|---|---|
| 1.00Ration Shop | |||||
| 1.01 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 675 | cum | 137 ₹92,475 Lowest | 140 ₹94,500 |
| 1.02 | Removal of Excavated Excess Earth away from the site to 3K.M including loading and transportation charges etc, complete as per standard specification. For 1M3 | 675 | cum | 80 ₹54,000 Lowest | 85 ₹57,375 |
| 1.03 | CEMENT CONCRETE - M7.5 (1:4:8) (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 75 | cum | 5,562 ₹4,17,150 Lowest | 5,570 ₹4,17,750 |
| 1.04 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, Sill slabs etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid with silver oak joists of size 10cm x 5cm & 7.5cm x 5cm as support runner , vertical stiffener, side support and Top Horizontal stiffener spaced at about 60cm to 90cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid).Base Slab | 37,170 | kg | 92.95 ₹34,54,951.5 Lowest | 95 ₹35,31,150 |
| 1.05 | Vibrated Reinforced Cement Concrete M20 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for MAT CONCRETE | 225 | cum | 8,918 ₹20,06,550 Lowest | 8,925 ₹20,08,125 |
| 1.06 | Vibrated Reinforced Cement Concrete M20 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for SIDE WALL | 306 | cum | 13,070 ₹39,99,420 Lowest | 13,075 ₹40,00,950 |
| 1.07 | Providing and fixing Bitumen Pad for Expansion joint in between pavement slabs to 12mm thick and fixed as shown in the drawing including cost and conveyence of expansion joints including shalimar pad and joint sealent etc, complete as per standard specification | 15 | sqm | 479 ₹7,185 Lowest | 485 ₹7,275 |
| 1.08 | Provision for GST 18% | 1 | No | 18,05,711.67 ₹18,05,711.67 Lowest | 18,21,082.5 ₹18,21,082.5 |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
24 Feb 2026, 3:00 pmClosed
Commissioner Oddanchatram Municipality
Odadnchatram Municipality
Construction of Strom water Channel and Culvert from Dharapuram NH to ChinnaKulam waterbody Ward no 4 in Oddanchatram Municipality
2026_MAWS_657912_1
315/2023/E1
Open Tender
Civil Works
Works
180 days
Oddanchatram Municipality
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1.2 L
Oddanchatram Municipal Office
12 Mar 2026
14 Feb 2026
24 Feb 2026
14 Feb 2026
24 Feb 2026
18 Feb 2026
17 Feb 2026
Ration Shop
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum
Removal of Excavated Excess Earth away from the site to 3K.M including loading and transportation charges etc, complete as per standard specification. For 1M3
CEMENT CONCRETE - M7.5 (1:4:8) (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, Sill slabs etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid with silver oak joists of size 10cm x 5cm & 7.5cm x 5cm as support runner , vertical stiffener, side support and Top Horizontal stiffener spaced at about 60cm to 90cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid).Base Slab
Vibrated Reinforced Cement Concrete M20 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for MAT CONCRETE
Vibrated Reinforced Cement Concrete M20 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for SIDE WALL
Providing and fixing Bitumen Pad for Expansion joint in between pavement slabs to 12mm thick and fixed as shown in the drawing including cost and conveyence of expansion joints including shalimar pad and joint sealent etc, complete as per standard specification
Provision for GST 18%
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
Tendernotice_2.pdf
PDF • 0.79 MB
BOQ_789220.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .