Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.2 LAccepted-Finance | L1 | Accepted-Finance ADMITTED |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
29 Jun 2026, 2:00 pmClosed
VIKAS ADHIKARI PANCHAYAT SAMITI BIKANER
VIKAS ADHIKARI PANCHAYAT SAMITI BIKANER
GRAMIN TURIST HETU GRAM RAISAR ME WATER STATION WITH REST AREA AND TOILET NIRMAN KARY
2026_PRD_568266_4
PSB_2026-27_632-35
Open Tender
Civil Works
Percentage
90 days
RAISAR
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
VIKAS ADHIKARI PANCHAYAT SAMITI BIKANER, MDRISL
₹40,000
Yes
1 Jul 2026
15 Jun 2026
30 Jun 2026
15 Jun 2026
29 Jun 2026
15 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in foundationexcavation up to 1.5m, ramming bottom, dressing sides, back filling and disposal of surplus soil with in a lead of 50m. | 28.98 | cum | 178.46 | ₹5,172.09 |
| 2 | Cement concrete in foundation and plinth with stone ballast size 40mm including curing and compaction etc in 1:4:8 mix | 4.83 | cum | 3,675.96 | ₹17,755.99 |
| 3 | Brick work in foundation and plinth using bricks of class in CM 1:6 | 32.14 | cum | 4,691.58 | ₹1,50,808.7 |
| 4 | DPC with RCC IN 1:1.5:3 MIX | 2.53 | cum | 5,354.51 | ₹13,544.45 |
| 5 | Brick work in super structue using bricks of class designation in CM 1:6 | 39.83 | cum | 4,940.19 | ₹1,96,790.1 |
| 6 | Reinforced cement concrete work including curing compection ,finishing with rendering in cement sand morter 1:3 and making good and joints excluding cost of centering,shuttring and reinforcement in 1:1.5:3 | 1.95 | cum | 5,570.29 | ₹10,867.37 |
| 7 | Providing and Fabricating reinforcement for RCC work including cutting,bending, placing in position and binding .. plinth beam & lintel beam | 392.04 | kg | 97.94 | ₹38,396.7 |
| 8 | Centering and Shuttring with plywood or steel sheets including strutting , propping, bracing both ways with wooden members and removal of from work | 27.96 | sqm | 319.04 | ₹8,921.25 |
| 9 | STONE CHAJJA WITH dab stone | 7.08 | Sqm | 1,214.22 | ₹8,596.68 |
| 10 | S & F steel girder including cutting, hoisting and fixing in positin up to 4.50m height | 466.92 | kg | 92.52 | ₹43,199.62 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
BOQ_1010917.xls
BOQ • 0.40 MB
psbraisar04.pdf
Tender Documents • 12.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .