Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
3 Aug 2026, 4:00 pm
Pro
Guptganga Ishber Nishat
Fencing at various catchment units of Watershed Management Division JKLCMA
2026_HAUDD_315642_1
NIT No.01 of 2026-27 watershed
Open Tender
Civil Works
Percentage
60 days
Srinagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
as per NIT executive engineer lake div 2
₹80,000
Yes
11 Jul 2026
11 Jul 2026
4 Aug 2026
13 Jul 2026
3 Aug 2026
13 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc(not exceeding 1.5 m in width ) and for shafts, wells, cesspits and the like not exceeding 10 Sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed ( 1 meter from cutting edge) in all kinds of soils:- | 0.8 | Cum | - | - |
| 2 | Laying of stone Stone soling in Horizontal on level available at site within an average lead of 100 meters as Manual Carriage:- | 1 | cum | 1 | ₹1 |
| 3Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: | |||||
| 3.01 | 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) | 0.8 | Cum | 1 | ₹0.8 |
| 4FORM WORK:- Centering and shuttering including strutting, propping etc. and removal of form for: | |||||
| 4.01 | Foundations, footings, bases of columns etc. for mass concrete | - | Sq.M | - | - |
| 5 | Supplying/Laying at site Angle iron post & strut of required size including bottom
to be split and bent at right angle in opposite direction for 10 cm length
and drilling holes upto 10 mm dia. etc. complete. | - | Kg | 1 | - |
| 6 | Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post andccorner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum),
between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per meter cost of total length of barbed wire used With G.I. barbed wire:- | 1 | RM | - | - |
| 7Applying priming coat With ready mixed red oxide Zinc Chromate primer of approved brand and manufacture on steel galvanized iron/steel works:- | |||||
| 8Painting with acid proof paint of approved brand and manufacture of required colour to give an even shade (Two or more coats on new Steel work):- | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.04 MB
BOQ_1024610.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].