Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical 1ST FLOOR B 116 VIBHUTI KHAND GOMTI NAGAR LUCKNOW U P | LUCKNOW | LUCKNOW | UTTAR PRADESH | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical 1C 1D VINDHYA TELELINKS LIMITED UDYOG VIHAR REWA MADHYA PRADESH 486006 | REWA | MADHYA PRADESH | 486006 | Admitted-Fee/PreQual/Technical |
Tender Value
₹115.8 Cr
EMD Value
₹1.2 Cr
Closing Date
23 Mar 2026, 3:30 pmClosed
S.E, Const. Circle, UPJN (Urban) Gorakhpur
Office of S.E, Const. Circle, UPJN (Urban) Gorakhpur, NH-28 near Paidleganj Gorakhpur
Construction of TW, OHT, Pump house, Boundry wall, LCS, Laying and jointing of Rising main and Distribution system, etc complete as per BOQ/tender documents
2026_UPJNM_1120404_1
174/v-15/39 dated 19.02.2026
Open Tender
Civil Works - Water Works
Percentage
730 days
Gorakhpur Nagar Nigam
As per tender notice / documents
2 documents required · 2 mandatory
₹23,600
Executive Engineer CD (I) UPJN (Urban) Gorakhpur
₹1.2 Cr
Office S.E, Const. Circle, UPJN (Urban) Gorakhpur
15 Apr 2026
27 Feb 2026
23 Mar 2026
27 Feb 2026
23 Mar 2026
27 Feb 2026
10 Mar 2026
Pump House
Survey, Soil investigation ,Structural designing as per relevant seismic zone ,Supply of all materials, laours, T&P etc. and construct pump house cum chlorination room of size ( 3.60 M x 3.0 M x 3.0 M / 2.80 M x 1.50 M x 3.0 M) with stilling chamber for tubewell, including byepass chamber as per departmental type design and drawing.
District 5 - OZ-3
District 6 - OZ-1
District 6 - OZ-3
District 8 - OZ-1
District 8 - OZ-2
District 25 - OZ-1
REPAIR OF EXISTING PUMPHOUSE
Supply of all materials, laours, T&P etc. and construction work for repairing & Painting of existing pumphouse cum chlorination room upto satisfaction of engineer in charge.
District 4 - OZ-1
District 4 - OZ-2
District 4 - OZ-3
District 5 - OZ-1
District 5 - OZ-2
District 6 - OZ-1
District 6 - OZ-2
District 7 - OZ-1
District 7 - OZ-2
District 7 - OZ-3
District 7 - OZ-4
District 7 - OZ-5
District 8 - OZ-1
District 8 - OZ-2
District 8 - OZ-3
District 25 - OZ-1
Staff Quarter
Soil testing ,Structural designing as per relevant seismic zone , Provide all materials, labour T&P etc. and construct Single room staff quarter with box & kitchen as per departmental type design and drawing.
District 4 - OZ-2
District 4 - OZ-3
District 5 - OZ-2
District 5 - OZ-3
District 6 - OZ-2
District 6 - OZ-3
District 7 - OZ-3
District 7 - OZ-5
District 8 - OZ-2
District 8 - OZ-3
District 25 - OZ-1
Repair of existing Staff Quarter
Supply all materials, tool & plants etc. for repairing work of existing staff quarter including plastering/ painting work and repairing and replacement of doors/windows etc complete upto satisfaction of engineer in charge.
District 4 - OZ-1
District 5 - OZ-1
District 6 - OZ-1
District 7 - OZ-1
District 7 - OZ-2
District 7 - OZ-4
District 8 - OZ-1
Boundary wall approach road etc
Survey, Soil investigation, Structural Designing as Per Relevant Seismic Zone and Provide all materials, labour T&P etc. required for proper completion of work for construct 1.5 M height Boundary wall upto satisfaction of engineer in charge.
Supply and fixing of 3.6 m wide M.S. gate with 1.20M wide MS wicket gate including construction of pillars as per departmental type design and drawing , one coat of primer and two coat of paint, its all fixures, including all material, labour,T&P etc.required for proper completion of work upto satisfaction of engineer in charge.
Supplying and constructing Interlocking approach road by using coloured interlocking leveling and dressing of existing ground, filling of local sand in minimum 30 mm thickness,filling of voids by local sand including all materials , labour, T&P etc.complete required for proper completion of workas upto satisfaction of engineer in charge.
Provision for inside square drain including supply of all materials labour and T & P etc. complete.
Provision of lighting in campus as per direction of Engineerin-charge including all materials, labour T&P etc complete.
Provision of land escapping and arboriculture in campus as per direction of Engineerin-charge including all materials, labour T&P etc complete.
Supplying, carting and filling of good earth in campus in maximum 25 cm thick layers, its compaction by roller, watering dressing levelling to achieve minimum 95 % procter density ( to avoid settlemnt of road/ structure) Provide all materials , labour, T&P etc.required for proper completion of works in complete sence upto satisfaction of engineer in charge.(contractor will have to do original and final level survey of earth for which no extra payment will be done)
REPARING OF EXISTING WATER WORKS
Provide all materials, labour T&P etc. required for proper completion of work for repair of existing Boundary wall upto satisfaction of engineer in charge.
Supplying and constructing Interlocking approach road by using coloured interlocking leveling and dressing of existing ground, filling of local sand in minimum 30 mm thickness,filling of voids by local sand including all materials , labour, T&P etc.complete required for proper completion of work upto satisfaction of engineer in charge.
Provision for inside square drain including supply of all materials labour and T & P etc. complete.
Provision of lighting in campus as per direction of Engineerin-charge including all materials, labour T&P etc complete.
Provision of land escapping and arboriculture in campus as per direction of Engineerin-charge including all materials, labour T&P etc complete.
LOCAL CONTROL STATION ROOM
Survey, Soil investigation ,Structural designing as per relevant seismic zone, Supply of all materials, laours, T&P etc. and construction of LOCAL CONTROL STATION ROOM of size ( 8.0 M x 10.0 M) as per departmental type design and drawing.
Rising main
Supply of ISI mark DI K-7&K-9 S&S pipes (push on joints) of following class and diameters inclusive of jointing material (Rubber gasket of EPDM Quality IS 12820 / 1989) conforming to IS 8329/2000 for its latest ammendment F.O.R. desination rates per meter (exclusive of GST) in Rs. every where in UP upto stores of consignees inclusive of third party inspection chacking and forwarding charges, transit insurance charges, road transportation charges, unloading & stacking the same etc. complete.
200 mm dia DI pipe Class K-9
300 mm dia DI pipe Class K-9
Supply of D.I. S/S or flanged Specials conforming to I.S. 8329/2000 Suitable for above C.I.S/S pipe F.O.R destination including all Taxes and insurance.
Excavation in trenchess in ordinary soil (loam, clay of sand) for depth 0-1.5 mbelow ground level for laying water lines. including cutting of joints pits, trimming, dressings, leveling, refilling of trenches in 20 cm layers, watering and ramming the same including removal of surplus earth and other dismantled materials, upto a distance of 50m from the center of trenches and stacking of serviciable material also upto satisfaction of engineer in charge.(for rising main)
Carting from store upto site of work, laying in true to alignment & gradient in trenches, with its specials including supplying and fixing of C.I.D/F specials required and testing of the following size and type of pipes after laying,specials and all jointing materials etc.including F.O.R. destination, insurance and with loading, unloading and stacking etc. complete in all respect upto satisfaction of engineer in charge.
200 mm dia DI pipe Class K-9
300 mm dia DI pipe Class K-9
Supply of all materials, labour, T & P etc. required and construct thrust blocks at the bends and below the Valves.C.C. Thrust Block for 125mm to 200mm Dia. Size (0.9 X 0.9 X 0.9m.)
Distrbution system
Excavation in trenchess in ordinary soil (loam, clay of sand) for depth 0-1.5 mbelow ground level for laying water lines. including cutting of joints pits, trimming, dressings, leveling, refilling of trenches in 20 cm layers, watering and ramming the same including removal of surplus earth and other dismantled materials, upto a distance of 50m from the center of trenches and stacking of serviciable material also upto satisfaction of engineer in charge.(for distribution)
In ordinary soil (loam, clay of sand,silt)
Supply of ISI mark DI K-7 S&S pipes (push on joints) of following class and diameters inclusive of jointing material (Rubber gasket of EPDM Quality IS 12820 / 1989) conforming to IS 8329/2000 for its latest ammendment F.O.R. desination rates per meter (exclusive of GST) in Rs. every where in UP upto stores of consignees inclusive of third party inspection chacking and forwarding charges, transit insurance charges, road transportation charges, unloading & stacking the same etc. complete.
200 mm dia DI pipe Class K-7 (IS-8329/2000)
250 mm dia DI pipe Class K-7 (IS-8329/2000)
300 mm dia DI pipe Class K-7 (IS-8329/2000)
350 mm dia DI pipe Class K-7 (IS-8329/2000)
400 mm dia DI pipe Class K-7 (IS-8329/2000)
450 mm dia DI pipe Class K-7 (IS-8329/2000)
Supply of High Density Polyethelene Pipes (HDPE (PN-6)/PE-100), conforming to IS 4984 / 14151 / 12786 / 13488 in coils/ standard lengths F.O.R. desination rates per meter (exclusive of GST) in Rs. every where in UP upto stores of consignees inclusive of third party inspection charges, packing and forwarding charges, transit insurance charges, road transportation chaloading & stacking the same etc. complete.
110 mm dia HDPE PIPE PE-100,,PN-6 (IS-4984/2016)
140 mm dia HDPE PIPE PE-100,,PN-6 (IS-4984/2016)
160 mm dia HDPE PIPE PE-100,,PN-6 (IS-4984/2016)
Supply of DI Specials conforming to I.S.- 8329/2000 with solvent cement suitable for above DI pipe F.O.R destination including all Taxes and insurance.
Supply of HDPE Specials conforming to I.S.- 4984/2016 with solvent cement suitable for above HDPE pipe F.O.R destination including all Taxes and insurance.
Lowering, laying and jointing with SBR ruber gaskets D.I. K-7 of various classes with DI / MS specials of following diameter in proper position, grade and alignment including conveyance of material to site of work. It also includes cost of jointing materials and rubber rings labour, hydraulic testing etc. complete.
200 mm dia DI pipe Class K-7 (IS-8329/2000)
250 mm dia DI pipe Class K-7 (IS-8329/2000)
300 mm dia DI pipe Class K-7 (IS-8329/2000)
350 mm dia DI pipe Class K-7 (IS-8329/2000)
400 mm dia DI pipe Class K-7 (IS-8329/2000)
450 mm dia DI pipe Class K-7 (IS-8329/2000)
Lowering, laying and jointing of HDPE pipe in proper position using electrofusion specials including supply of all Electrofusion specials & hydraulic testing as per relevent IS Code complete with all accessories like Electrofusion machine, power arrangements, hydraulic testing arrangements, labours, material etc. complete.
110 mm dia HDPE PIPE PE-100,,PN-6 (IS-4984/2016)
140 mm dia HDPE PIPE PE-100,,PN-6 (IS-4984/2016)
160 mm dia HDPE PIPE PE-100,,PN-6 (IS-4984/2016)
Supply, carting upto site, loading unloading, fixing in position true to alingment including all jointing material, specials, nut-bolts etc., rubber insertion white lead,valves of following size of C.I.D./F. Sluice valves as per ISS 780 class I, working pressure 10 kg/cm2, and its accesories as per latest I.S. specification including F.O.R. destination, all taxes, labour, material T&P etc complete in all respect, insurance for proper completion of work upto safisfaction of engineer in charge.
100 mm dia Sluice valve
125 mm dia Sluice valve
150 mm dia Sluice valve
200 mm dia Sluice valve
250 mm dia Sluice valve
300 mm dia Sluice valve
350 mm dia Sluice valve
400 mm dia Sluice valve
450 mm dia Sluice valve
80 mm dia Scour valve
25 mm dia Air valve
Supply, carting from store to site, loading unloading and fixing in position including supply of jointing materials such as nuts-boalt, rubber insertion white lead,valves etc. and all specials required for proper completion of work under ground sluice valve type fire hydrant containing 80mm dia sluice valve 80 mm dia tail piece ,80 mm dia duck foot bend, 63 mm dia standard makes iron coupling with cap and its accesories as per latest I.S. specification including F.O.R. destination, all taxes and insurance etc. complete for proper completion of work upto satisfaction of engineer in charge.
Dismanting of Following type of surfaces including sorting out and stacking of serviceable materials and disposal of unserviceable materials , including all labour material T&P etc complete in all respect.( in case of theft of sericiable material it will be the responsibility of the contraactor).
B.O.E. Surface
Bituminous surface
C.C.Road
Interlocking Surface
Reinstatement of following type of road surface with old ( serviciable material) and new materials as per detailed scope of work and technical spefication including supply of all materials, labour, T&P etc. required for proper completion of the work upto satisfaction of engineer in charge. ( in case of any type of settlement upto minimum one rainy season contractor will have to reinstate it again for which no extra payment will be done).
B.O.E. Surface
Bituminous surface
C.C.Road
Interlocking Surface
Supplying and constructing following types of chambers as per approved design and drawing including all labour, material T&P etc complete in all respect upto satisfaction of engineer in charge.
Sluice valve chamber (surface box Type)
Sluice valve chamber (masonary Type)
Air valve chamber
Fire Hydrant
Provision for crossing of nalas, road, culvert and embankments (bundha) etc. including shifting of telephone cables etc.along the alignement of pipe line including supply of C.I.Tyton pipes and specials,and their laying and jointing testing etc.complete in all respect upto satisfaction of engineer in charge.( width of drain/culvert/bundha must be greater than 1 m)
Provision for road crossing 3.5-7.0 M
Provision for road crossing upto 3.5 M
Provsion for crossing of Culvert 2.0-3.5 M
Nala/ drain upto 2.0 M
Repairing of drain/ public ramp/other miscellaneous structures which are coming in alignment of pipe line and damaged during the laying of pipe line including supply of all materials, labour, T&P etc. required for proper completion of the work.
Brick masonry in cement mortar 1:4
12mm thick plaster in cement mortar 1:4
Survey, Soil investigation ,Structural designing as per relevant seismic zone ,Supply of all materials, laours, T&P etc. and construct Booster pump house of 28 Sqm as per departmental type design and drawing.
Inter connection of pipe (90-200 mm)
Replacement and separation of pipe (90-200 mm)
House Connection shifting
End cap
Providing, laying & construction of RCC work of 1:1.5:3 in thurst block/ casing of pipe line as required during the construction period for laying of pipe lines as directed by Engineer-in-charge including normal form work, compacting, finishing the formed suffaces with CM 1:3 of sufficient minimum thickness to give a smooth and even sugace wherever necessary for proper completion of the work.
RCC THRUST BLOCK FOR 80 MM TO 100 MM DIA SIZE (0.6 X 0.6 X 0.6M)
RCC THRUST BLOCK FOR 125 MM TO 200 MM DIA SIZE (0.9 X 0.9 X 0.9M)
RCC THRUST BLOCK FOR 250 MM TO 500 MM DIA SIZE (1.25 X 1.25 X 1.00M)
Providing and fixing in position steel bar reinforcement required for above item including cutting bending, hooking the bars, binding with wires or tack welding and supporting as required etc. complete (including cost of binding wire and MS Bar)
House Connection
Making house connection with 20mm(OD) HDPE main with Supply,Carting ,laying , jointing and fixing of the 15 mm (OD) G.I. pipe ,I.S.I. Mark Gunmetal Ferrul , I.S.I. Mark saddle/clamp of required size, C.I. bib kock of approved quality, J-Hook or M.S.U-clamp, 25cmX25cmX25cm C.C grouting of unsupported G.I. pipe all connection in inside the house and support on wall with suitable clamp as per directed by engineer-in charge including cost of all jointing material, specials, labour,material T&P and its testing etc. complete in all respect upto satisfaction of engineer charge.( contractor will have to submit list of house hold survey for which no extra payment will be done)
For 90mm to 110mm dia
For 125mm to 160mm dia
C.C Road
For 90mm to 110mm dia
For 125mm to 160mm dia
Bituminous
For 90mm to 110mm dia
For 125mm to 160mm dia
Interlocking
For 90mm to 110mm dia
For 125mm to 160mm dia
Earthern
For 90mm to 110mm dia
For 125mm to 160mm dia
For 350mm to 500mm dia
Over Head Tank
Total station survey/DGPS of the project area, construction of level pillars at all important locations, soil investigation, designing (As per relevant seismic zone), supplying all materials, for construction of Intz Type R.C.C. Over Head Tank having dog legged staircase of following Capacity and staging above ground level with main components, including cost of all survey, designing, geotechnical investigation, testing ( footing raft/pile will be provided based on actual bearing capacity of soil for contractor is advised to investigate the soil before tendering), with supply of design and drawings and its vetting from any national level Government engineering institute .All the water retaining components of OHT shall be casted in M-30 concrete and minimum grade of concrete of foundation and staging should be M-25 or as per latest I.S. code with approved cement, coarse sand and stone grit as per I.S. 11682 and I.S.456. Seismic effects ( seismic zone -IV) and wind load should be taken into consideration as per I.S. 1893 for earthquake resistance and I.S. 875 part-III for wind load on structure and including 1M wide RCC staircase, 1 m wide R.C.C. M30 balcony, ladder with hand rails of 20mm medium class G.I. pipes, One aluminum ladder inside the tank from top dome to bottom dome, railing with 20mm dia medium class G.I.pipe (in 3 rows) on both sides of stair case, bolcony and top dome, supported on 50x50x6mm M.S. angle section, spaced at intervals not more than 1.5m, Proper ventilator at top dome in circular shape of 1.2 m dia, Digital Water level indicator fabricated with sensor connecting to automation, Lightening conductor as per I.S.S.2309 or its latest amendments of latest electricity rules, consisting of proper elevation rod with 5 or more fork points as prescribed in ISS 2309-1969 and ISS 3013-1966, C.I. manhole of min 60x60cm size with locking arrangement, Supply, fixing, jointing of C.I.D/F Pipes of appropriate size with C.I.D/F specials conforming to IS 8329/2000 as vertical pipes for inlet, outlet, overflow and washout as per latest / relevant I.S. specifications with all jointing materials for proper completion of work, Supply and Fixing of appropriate size manually operated D/F Sluice Valve / Butter Fly Valves as per ISS 700/1969 or its latest amendments class “A” working pressure 10 Kg/cm2, Construction of bed blocks in 1:2:4 PCC with cement, coarse sand and approved stone grit , Construction of washout / overflow chamber and chambers for sluice / butter fly valves as per departmental type design and drawing, Supply of 200 mm dia PVC pipe as per I.S.-4985/2000 for disposal of water from overflow and washout chamber to suitable point outside the water works compound. Supply and fixing of 1.8 m hight M.S. Gate in staire case at 2nd fligth as per direction of engineer -in-charge. Priming and Painting of all concrete surface and steel pipe works with water based exterior paint of approved make and quality as mentioned in tender document over one priming coat on new work with two coats, to give an even shade and anticorrosive paints including preparation of surface, disposal of water from overflow and washout chamber to suitable point outside the water works compound including excavation of trenches. Laying of pipe line &supply of all materials labour T&P etc. required for proper completion of the work. AS PER DIRECTION and upto satisfaction of engineer in charge.
District 4 - OZ-2 (1150KL/22M)
District 4 - OZ-3 (1100KL/25M)
District 5 - OZ-2 (2400KL/22M)
District 5 - OZ-3 (2250KL/22M)
District 6 - OZ-2 (800KL/22M)
District 6 - OZ-3 (500KL/20M)
District 7 - OZ-3 (1200KL/20M)
District 7 - OZ-5 (2200KL/25M)
District 8 - OZ-2 (2100KL/22M)
District 8 - OZ-3 (1900KL/22M)
District 25 - OZ-1 (1200KL/24M)
Repair of existing RCC Overhead tanks
Supply all materials labour T&P etc. complete & repairing & painting of below mentioned capacity existing RCC Overhead tanks upto satisfaction of engineer in charge.
District 4 - OZ-1 (1100KL/18M)
District 5 - OZ-1 (2250KL/22M)
District 6 - OZ-1 (900KL/22M)
District 7 - OZ-1 (1000KL/18M)
District 7 - OZ-2 (1300KL/22M)
District 7 - OZ-4 (1000KL/18M)
District 8 - OZ-1 (300KL/18M)
CWR CUM PUMP HOUSE
Survey, Soil investigation,Structural designing as per relevant seismic zone, Supply of all material and construction of RCC, CWR Cum Pump House including appurtenant works such as MS ladder and manhole cover, water level indicator, GI pipe railing around top slab, appron, drain, painting on exposed surface with three coats of approved water proof cement paint, painting of vertical pipes and railing with approved synthatic enamel paint including supply of all materials, labour fixing of inlet, outlet over flow and wash out CI D/F pipe of required size, CI Specials and duck foot bend etc. As per norms complete in all respect as per direction of Engineer in-charge and approved design which will be submitted by contructer at the time of execution.
District 5 - OZ-2 (600 KL)
District 5 - OZ-3 (600 KL)
District 7 - OZ-5 (500 KL)
District 8 - OZ-2 (550 KL)
District 8 - OZ-3 (500 KL)
Ground water recharge
Survey, Soil investigation ,Structural designing as per relevant seismic zone and Supply of all materials, laours, T&P etc. Providing all material,labour T&P etc complete for construction of Ground water Recharging unit by rain water and from complete water works site in water works campus as per drawing and design etc complete in all respect upto satisfaction of engineer in charge.
District 4 - OZ-1
District 4 - OZ-2
District 4 - OZ-3
District 5 - OZ-1
District 5 - OZ-2
District 5 - OZ-3
District 6 - OZ-1
District 6 - OZ-2
District 6 - OZ-3
District 7 - OZ-1
District 7 - OZ-2
District 7 - OZ-3
District 7 - OZ-4
District 7 - OZ-5
District 8 - OZ-1
District 8 - OZ-2
District 8 - OZ-3
District 25 - OZ-1
District-4 OZ-1 (02 No Existing Tubewell)
SCADA AUTOMATION OF TUBEWELL
CE & UL Certified PLC/RTU in IP 65 enclosure suitable to Communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & fetures as specified for each tubewell/OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations as specified also enabled with UPS for power backup upto 2Hrs & automatic on/off switching arrangement.
G.S.M/G.P.R.S based wireless communication 4G Modem for RTU/PLC Capable to transfer & gather data from remote sites to control stations all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender technical specification.
Control panel with IP 54 protection, industrial grade for all equipment (Separate for control (24V) and power equipment).
CE/UL Certified Surge protector for control panel
CE/UL certified 7" HMI touch screen suitable to communicate with PLC/RTU for local display and control of process parameters.
Complete cabling for all equipments at pumphouse
CE/UL certified hydrostatic type subsoil water level treansmitter for tubewell
CE/UL Certified Pressure Transmiter .
SITC of Automatic chlorination system SCADA Compatable chlorinating system.
Installation, commissioing & testing for one tubewell
Trial Run for 3 month period for one tubewell
Instrumentaion of OHT DMA-1
CE/UL Certified Radar type level Transmitter for OHT
Flow control Valve 200 mm size
Sluice valve 200mm Size
Electromagnetic Flowmeter of 200mm Size
CE / UL certified Pressure Transmitter
Residual chlorine analyzer with following description:- i- Chlorine Measuring sensor (Chlorine analyzer) for free chlorine membrane covered sensor 0.01…2mg/l; low pH dependency. ii- Single parameter system ready to operate to measure free or total chlorine iii- Connection cable 2 m, 2-wire, 2 x stripped ends, tinned iv- Battery and other accessories for power back for continous operation.
Instrumentaion of OHT DMA-2
Flow control Valve 250 mm size
Sluice valve 250mm Size
Electromagnetic Flowmeter of 250mm Size
CE / UL certified Pressure Transmitter
Residual chlorine analyzer with following description:- i- Chlorine Measuring sensor (Chlorine analyzer) for free chlorine membrane covered sensor 0.01…2mg/l; low pH dependency. ii- Single parameter system ready to operate to measure free or total chlorine iii- Connection cable 2 m, 2-wire, 2 x stripped ends, tinned iv- Battery and other accessories for power back for continous operation.
LCS (Local Control Station)
CE/UL & BIS Certified industrial grade 75 ''LED MONITOR with latest configuration as per specification.
Desktop/PC with i7 prosessor for as per spec mentioned in technical bid document.
CE/UL Cerfified 05 KVA UPS with batteries as per spec mentioned in technical bid document.
Full development version of reqrired TAGS SCADA Software with counstomization of software for LCS as per requirement as per spec mentioned in technical bid documents.
CE/UL certified local control room PLC with redundant CPU & power supply at MCS in IP54 enclouser as spec mentioned in technical bid documents.
GSM based wireless/Broadband/Equipment communication system for PLC capable to tranfer & received data & gather data from remote sited to control station, All accessoried included signal enhancer antenna along with running expences till DLP.
CE/UL Certified Firewall for network protection.
Mobile app facility system architecture
SURGE PROTECTOR FOR ETHERNET communication protection.
CE/UL certified industrial grade Ethernet Switch
Canon/HP or eqrivalent Laser Printer with print, copy, scan & wifi facility
Security Surveillance IP camera with recorded (optional).
Installation, Commissioning & testing inclidung required funiture, A/c etc.
Trial run for 3 month period.
3 months Trial and Run
District-4 OZ-2 (02 No Existing Tubewell)
SCADA AUTOMATION OF TUBEWELL
CE & UL Certified PLC/RTU in IP 65 enclosure suitable to Communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & fetures as specified for each tubewell/OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations as specified also enabled with UPS for power backup upto 2Hrs & automatic on/off switching arrangement.
G.S.M/G.P.R.S based wireless communication 4G Modem for RTU/PLC Capable to transfer & gather data from remote sites to control stations all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender technical specification.
Control panel with IP 54 protection, industrial grade for all equipment (Separate for control (24V) and power equipment).
CE/UL Certified Surge protector for control panel
CE/UL certified 7" HMI touch screen suitable to communicate with PLC/RTU for local display and control of process parameters.
Complete cabling for all equipments at pumphouse
CE/UL certified hydrostatic type subsoil water level treansmitter for tubewell
CE/UL Certified Pressure Transmiter .
SITC of Automatic chlorination system SCADA Compatable chlorinating system.
Installation, commissioing & testing for one tubewell
Trial Run for 3 month period for one tubewell
Instrumentaion of OHT DMA-1 & DMA-2
CE/UL Certified Radar type level Transmitter for OHT
Flow control Valve 200 mm size
Sluice valve 200mm Size
Electromagnetic Flowmeter of 200mm Size
CE / UL certified Pressure Transmitter
Residual chlorine analyzer with following description:- i- Chlorine Measuring sensor (Chlorine analyzer) for free chlorine membrane covered sensor 0.01…2mg/l; low pH dependency. ii- Single parameter system ready to operate to measure free or total chlorine iii- Connection cable 2 m, 2-wire, 2 x stripped ends, tinned iv- Battery and other accessories for power back for continous operation.
3 months Trial and Run
District-4 OZ-3 (02 No Existing Tubewell)
SCADA AUTOMATION OF TUBEWELL
CE & UL Certified PLC/RTU in IP 65 enclosure suitable to Communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & fetures as specified for each tubewell/OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations as specified also enabled with UPS for power backup upto 2Hrs & automatic on/off switching arrangement.
G.S.M/G.P.R.S based wireless communication 4G Modem for RTU/PLC Capable to transfer & gather data from remote sites to control stations all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender technical specification.
CE/UL Certified Surge protector for control panel
CE/UL certified 7" HMI touch screen suitable to communicate with PLC/RTU for local display and control of process parameters.
Complete cabling for all equipments at pumphouse
Control panel with IP 54 protection, industrial grade for all equipment (Separate for control (24V) and power equipment).
CE/UL certified hydrostatic type subsoil water level treansmitter for tubewell
CE/UL Certified Pressure Transmiter .
SITC of Automatic chlorination system SCADA Compatable chlorinating system.
Installation, commissioing & testing for one tubewell
Trial Run for 3 month period for one tubewell
Instrumentaion of OHT DMA-1
CE/UL Certified Radar type level Transmitter for OHT
Flow control valve 300mm size
Motor operated actuator with sluice valve 300 mm size
Electromagnetic Flowmeter of 200mm Size
CE / UL certified Pressure Transmitter
Residual chlorine analyzer with following description:- i- Chlorine Measuring sensor (Chlorine analyzer) for free chlorine membrane covered sensor 0.01…2mg/l; low pH dependency. ii- Single parameter system ready to operate to measure free or total chlorine iii- Connection cable 2 m, 2-wire, 2 x stripped ends, tinned iv- Battery and other accessories for power back for continous operation.
Instrumentaion of OHT DMA-2
Flow control Valve 200 mm size
Motor operated actuator with sluice valve 300 mm size
Electromagnetic Flowmeter of 250mm Size
CE / UL certified Pressure Transmitter
Residual chlorine analyzer with following description:- i- Chlorine Measuring sensor (Chlorine analyzer) for free chlorine membrane covered sensor 0.01…2mg/l; low pH dependency. ii- Single parameter system ready to operate to measure free or total chlorine iii- Connection cable 2 m, 2-wire, 2 x stripped ends, tinned iv- Battery and other accessories for power back for continous operation.
3 months Trial and Run
District-5 OZ-1 (03 No Existing Tubewell)
SCADA AUTOMATION OF TUBEWELL
CE & UL Certified PLC/RTU in IP 65 enclosure suitable to Communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & fetures as specified for each tubewell/OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations as specified also enabled with UPS for power backup upto 2Hrs & automatic on/off switching arrangement.
G.S.M/G.P.R.S based wireless communication 4G Modem for RTU/PLC Capable to transfer & gather data from remote sites to control stations all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender technical specification.
CE/UL Certified Surge protector for control panel
CE/UL certified 7" HMI touch screen suitable to communicate with PLC/RTU for local display and control of process parameters.
Complete cabling for all equipments at pumphouse
Control panel with IP 54 protection, industrial grade for all equipment (Separate for control (24V) and power equipment).
CE/UL certified hydrostatic type subsoil water level treansmitter for tubewell
CE/UL Certified Pressure Transmiter .
SITC of Automatic chlorination system SCADA Compatable chlorinating system.
Installation, commissioing & testing for one tubewell
Trial Run for 3 month period for one tubewell
Instrumentaion of OHT DMA-1, DMA-2 & DMA-3
CE/UL Certified Radar type level Transmitter for OHT
Flow control valve 300mm size
Motor operated actuator with sluice valve 300 mm size
Electromagnetic Flowmeter of 200mm Size
CE / UL certified Pressure Transmitter
Residual chlorine analyzer with following description:- i- Chlorine Measuring sensor (Chlorine analyzer) for free chlorine membrane covered sensor 0.01…2mg/l; low pH dependency. ii- Single parameter system ready to operate to measure free or total chlorine iii- Connection cable 2 m, 2-wire, 2 x stripped ends, tinned iv- Battery and other accessories for power back for continous operation.
3 months Trial and Run
District-5 OZ-2 (02 no New + 02 No Existing Tubewell)
CONSTRUCTION OF TUBEWELL
Transportation of Rig m/c and its T&P including Erection and Dismantling of Rig m/c.
Transportation, Erection & Dismantling of 250 PSI Air Compressor.
By O.P. Unit
Transportation, Erection & Dismantling of 1 Cusec O.P. Unit and Yield Test.
Logging of bore hole by departmental/approved electric logger.
Drilling of 600 mm dia bore from G.L. to 60 M BGL
500 mm dia Drilling from 61 to 100 M BGL
500 mm dia Drilling from 101 to 200 M BGL
TUBEWELL ASSEMBLY
M.S. tubewell assembly with all required parts like plain pipe, slotted pipe (as required upto 50% of plain pipes) rings, well cap, bail plug, clamp, reducer, central guide, support structure etc. as required & as per typed design complete in all respect. (Note-Axial Length of Reducer without Ring shall be measured with Casing Pipe.)
300 mm dia
200mm dia
LOWERING OF ASSEMBLY
Lowering of Tube Well assembly duly welded including welding electrode and shrouding of pea Gravel complete in all respect. (Note-Axial Length of Reducer without Ring shall be measured with Casing Pipe.)
300 mm dia size Assembly from 0 to 54 M BGL
200 mm dia size Assembly from 55 to 100 M BGL
200 mm dia size Assembly from 101 to 180 M BGL
PEA-GRAVEL
Supply of 1.6 - 4.8 mm size Lal Kuwan Quarry Pea-Gravel Duly Washed, Screened and properly Stacked at Site.
DEVELOPMENT OF TUBEWELL
Development of T.W. by 250 PSI Air Compressor with all required material, labour, T&P etc.
Development of T.W. by 3 Cusec O.P. Unit with all required material, labour, T&P etc.
chemical and bacteriological test
SCADA AUTOMATION OF Existing TUBEWELL
CE & UL Certified PLC/RTU in IP 65 enclosure suitable to Communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & fetures as specified for each tubewell/OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations as specified also enabled with UPS for power backup upto 2Hrs & automatic on/off switching arrangement.
G.S.M/G.P.R.S based wireless communication 4G Modem for RTU/PLC Capable to transfer & gather data from remote sites to control stations all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender technical specification.
CE/UL Certified Surge protector for control panel
CE/UL certified 7" HMI touch screen suitable to communicate with PLC/RTU for local display and control of process parameters.
Complete cabling for all equipments at pumphouse
Control panel with IP 54 protection, industrial grade for all equipment (Separate for control (24V) and power equipment).
CE/UL certified hydrostatic type subsoil water level treansmitter for tubewell
CE/UL Certified Pressure Transmiter .
SITC of Automatic chlorination system SCADA Compatable chlorinating system.
Installation, commissioing & testing for one tubewell
Trial Run for 3 month period for one tubewell
Pumping plant and Other instrumentation work For New Tubewell
SITC of 1200 LPM, 36 m head 20 H.P. submersible pump set with 24 meter 150mm dia column pipe assembly, NRV, CI D/F Bend 90°, CI A/F Tee, D/F pipe (1.5m long 2 Nos and 1.0m long 1 No), Earthing, Painting Toolset, Power wiring of pump house internal and external, Chainpully block, and all Pumping plant accessories with nut bolts and rubber packing etc. Rates of items required for SCADA Automation of pumping plant are not included in these rates.
SITC of Automatic chlorination system SCADA Compatable chlorinating system.
Misc item such as protection ring, MCCB, Transformer oil, electric resistance, rubber sheet, 25 sqmm ormad cable. Etc.
150mm Dia 3M long heavy duty column pipe same as above (Extra/Spare)
Supply & Erection of Servo Stabilizer of 30 KVA
CE / UL certified Intelligent smart energy meter
Motor Operated Actuator with Sluice Valve (150mm)
CE / UL certified Electromagnetic flowmeter of size:150mm
Soft Starter with Rs485 port-400 Class.
Auto phase reversal unit with inbuilt time delay & enclousre (confirm to IEC: 60947-1 & IEC: 60947-b-1)
CE / UL certified Hydrostatatic type sub soil water level transmitter
CE / UL certified Pressure Transmitter
SCADA AUTOMATION of New Tubewell
CE & UL Certified PLC/RTU in IP 65 enclosure suitable to Communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & fetures as specified for each tubewell/OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations as specified also enabled with UPS for power backup upto 2Hrs & automatic on/off switching arrangement.
G.S.M/G.P.R.S based wireless communication 4G Modem for RTU/PLC Capable to transfer & gather data from remote sites to control stations all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender technical specification.
CE/UL Certified Surge protector for control panel
CE/UL certified 7" HMI touch screen suitable to communicate with PLC/RTU for local display and control of process parameters.
Complete cabling for all equipments at pumphouse
Control panel with IP 54 protection, industrial grade for all equipment (Separate for control (24V) and power equipment).
Installation, commissioing & testing for one tubewell
Trial Run for 3 month period for one tubewell
Instrumentaion of OHT DMA-1,2,3 & 4
CE/UL Certified Radar type level Transmitter for OHT
Flow control Valve 250 mm size
Sluice valve 250mm Size
Electromagnetic Flowmeter of 250mm Size
CE / UL certified Pressure Transmitter
Residual chlorine analyzer with following description:- i- Chlorine Measuring sensor (Chlorine analyzer) for free chlorine membrane covered sensor 0.01…2mg/l; low pH dependency. ii- Single parameter system ready to operate to measure free or total chlorine iii- Connection cable 2 m, 2-wire, 2 x stripped ends, tinned iv- Battery and other accessories for power back for continous operation.
3 months Trial and Run
District-5 OZ-3 (05 No New Tubewell)
CONSTRUCTION OF TUBEWELL
Transportation of Rig m/c and its T&P including Erection and Dismantling of Rig m/c.
Transportation, Erection & Dismantling of 250 PSI Air Compressor.
By O.P. Unit
Transportation, Erection & Dismantling of 1 Cusec O.P. Unit and Yield Test.
Logging of bore hole by departmental/approved electric logger.
Drilling of 600 mm dia bore from G.L. to 60 M BGL
500 mm dia Drilling from 61 to 100 M BGL
500 mm dia Drilling from 101 to 200 M BGL
TUBEWELL ASSEMBLY
M.S. tubewell assembly with all required parts like plain pipe, slotted pipe (as required upto 50% of plain pipes) rings, well cap, bail plug, clamp, reducer, central guide, support structure etc. as required & as per typed design complete in all respect. (Note-Axial Length of Reducer without Ring shall be measured with Casing Pipe.)
300 mm dia
200mm dia
LOWERING OF ASSEMBLY
Lowering of Tube Well assembly duly welded including welding electrode and shrouding of pea Gravel complete in all respect. (Note-Axial Length of Reducer without Ring shall be measured with Casing Pipe.)
300 mm dia size Assembly from 0 to 54 M BGL
200 mm dia size Assembly from 55 to 100 M BGL
200 mm dia size Assembly from 101 to 180 M BGL
PEA-GRAVEL
Supply of 1.6 - 4.8 mm size Lal Kuwan Quarry Pea-Gravel Duly Washed, Screened and properly Stacked at Site.
DEVELOPMENT OF TUBEWELL
Development of T.W. by 250 PSI Air Compressor with all required material, labour, T&P etc.
Development of T.W. by 3 Cusec O.P. Unit with all required material, labour, T&P etc.
chemical and bacteriological test
Pumping plant and Other instrumentation work
SITC of 1200 LPM, 36 m head 20 H.P. submersible pump set with 24 meter 150mm dia column pipe assembly, NRV, CI D/F Bend 90°, CI A/F Tee, D/F pipe (1.5m long 2 Nos and 1.0m long 1 No), Earthing, Painting Toolset, Power wiring of pump house internal and external, Chainpully block, and all Pumping plant accessories with nut bolts and rubber packing etc. Rates of items required for SCADA Automation of pumping plant are not included in these rates.
SITC of Automatic chlorination system SCADA Compatable chlorinating system.
Misc item such as protection ring, MCCB, Transformer oil, electric resistance, rubber sheet, 25 sqmm ormad cable. Etc.
150mm Dia 3M long heavy duty column pipe same as above (Extra/Spare)
Supply & Erection of Servo Stabilizer of 30 KVA
CE / UL certified Intelligent smart energy meter
Motor Operated Actuator with Sluice Valve (150mm)
CE / UL certified Electromagnetic flowmeter of size:150mm
Soft Starter with Rs485 port-400 Class.
Auto phase reversal unit with inbuilt time delay & enclousre (confirm to IEC: 60947-1 & IEC: 60947-b-1)
CE / UL certified Hydrostatatic type sub soil water level transmitter
CE / UL certified Pressure Transmitter
SCADA AUTOMATION of New Tubewell
CE & UL Certified PLC/RTU in IP 65 enclosure suitable to Communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & fetures as specified for each tubewell/OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations as specified also enabled with UPS for power backup upto 2Hrs & automatic on/off switching arrangement.
G.S.M/G.P.R.S based wireless communication 4G Modem for RTU/PLC Capable to transfer & gather data from remote sites to control stations all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender technical specification.
CE/UL Certified Surge protector for control panel
CE/UL certified 7" HMI touch screen suitable to communicate with PLC/RTU for local display and control of process parameters.
Complete cabling for all equipments at pumphouse
Control panel with IP 54 protection, industrial grade for all equipment (Separate for control (24V) and power equipment).
Installation, commissioing & testing for one tubewell
Trial Run for 3 month period for one tubewell
Instrumentaion of OHT DMA-1,2 & 3
CE/UL Certified Radar type level Transmitter for OHT
Flow control Valve 350 mm size
Sluice valve 350mm Size
Electromagnetic Flowmeter of 350mm Size
CE / UL certified Pressure Transmitter
Residual chlorine analyzer with following description:- i- Chlorine Measuring sensor (Chlorine analyzer) for free chlorine membrane covered sensor 0.01…2mg/l; low pH dependency. ii- Single parameter system ready to operate to measure free or total chlorine iii- Connection cable 2 m, 2-wire, 2 x stripped ends, tinned iv- Battery and other accessories for power back for continous operation.
3 months Trial and Run
District-5 OZ-2 CWR
V.T. Pump- Motor Set
2400 LPM 43M head 40 HP Clear Water 1450 RPM, surface discharge, self water lubricated, Bottom Suction with 3 M long column Assembly ( Column Pipe shaft & Rubber spider) Discharge head, Top shaft, rachet to prevent reverse rotation, suitable to couple with 3 phase 4 Pole, Vertical hollow shaft 1450 RPM squirrel cage 400 V ± 10% 50 Hz, AC, Motor etc.
Starter
Provision of Digital Soft Starter to operate Upto 40 HP motor at 0.4 KV + 10% 3 phase, 50 Hz. A.C. and to control the above motors. It shall comprise of all protection devices as per latest I.S.S. specifications.
L.T. Switchgear Panel Board
Provision and laying of PVC armoured Power cables of required sizes with earthing material.for internal wiring i.e Panel to Starters and from Starters to Motors
Delivery pipes and specials as per details given below: 200 mm size individual delivery and 300 mm size common delivery with jointing material, valves, Tee, bends etc. i- 200 mm dia Detachable Joint-3 Nos ii-200 mm dia Bend- 3 Nos iii-200 X 300 mm Tee- 3 Nos iv-300 mm Reflux Valve-1 Nos. v-200 mm Reflux Valve-3 Nos. vi-300 mm dia Duckfoot Bend-1 Nos. vii-300 mm dia Common Header-15 M viii-300 mm dia Blind Flange-1 No
Provision of MS Girder for pump base etc.
Chukkered Plate and Grills to cover the Gaps between Girder and Adjacent Pumps
Internal electrification of Pump House (CWR), Pannel room and campus with Light & Fan wiring and & other Necessary works.
H.O.T. crane of 3 Tones capacity , Lift 4.5 Mtr
Testing of pumps & other equipment at work site
Painting of equipment with two coats.
CE / UL certified Intelligent smart energy meter
Motor Operated sluice valve with Actuator for Pumps(200mm)
Motor Operated sluice valve with Actuator for Common Header (300mm)
Electromagnetic flowmeter of size: 300mm for common header
Auto phase reversal unit with inbuilt time delay & enclosure conforming to IEC: 60947-1 & IEC:60947-b-1) (160 Amps)
CE / UL certified Radar type Level Transmitter for CWR
CE / UL certified Smart Pressure Transmitter
CE / UL certified Surge protector for control panel
CE / UL certified 7" HMI touchscreen suitable to communicate with PLC/RTU, for local display & control of process parameters
Complete Cabling for CWR including all power & control cable of all equipments at CWR and OHT
Control panel with IP 54 protection, industrial grade fro all equipments (separate for control (24V) and power equipments.
Installation, commissioning & testing
11/0.40 KV 160 KVA Electric Sub Station
160 KVA Sub Station at CWR
Automation of CWR
CE & UL Certified PLC/RTU with redudant CPU and Power supply in IP 54 enclosure suitable to Communicate with GSM based modem unit with redudant CPU & Power supply with analog & digital parameter & fetures as specified for each ZPS/OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations as specified in tender technical specification.
G.S.M/G.P.R.S based wireless communication 4G Modem for RTU/PLC Capable to transfer & gather data from remote sites to control stations all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender technical specification.
3 months Trial and Run
District-5 OZ-3 CWR
V.T. Pump- Motor Set
3000 LPM 43M head 50 HP Clear Water 1450 RPM, surface discharge, self water lubricated, Bottom Suction with 3 M long column Assembly ( Column Pipe shaft & Rubber spider) Discharge head, Top shaft, rachet to prevent reverse rotation, suitable to couple with 3 phase 4 Pole, Vertical hollow shaft 1450 RPM squirrel cage 400 V ± 10% 50 Hz, AC, Motor etc.
Starter
Provision of Digital Soft Starter to operate Upto 40 HP motor at 0.4 KV + 10% 3 phase, 50 Hz. A.C. and to control the above motors. It shall comprise of all protection devices as per latest I.S.S. specifications.
Provision and laying of PVC armoured Power cables of required sizes with earthing material.for internal wiring i.e Panel to Starters and from Starters to Motors
Delivery pipes and specials as per details given below: 200 mm size individual delivery and 300 mm size common delivery with jointing material, valves, Tee, bends etc. i- 200 mm dia Detachable Joint-3 Nos ii-200 mm dia Bend- 3 Nos iii-200 X 300 mm Tee- 3 iv- 300 mm Reflux Valve-1 Nos. v-200 mm Reflux Valve-3 Nos. vi-300 mm dia Duckfoot Bend-1 Nos. vii-300 mm dia Common Header-15 M viii-300 mm dia Blind Flange-1 No
Provision of MS Girder for pump base etc.
Chukkered Plate and Grills to cover the Gaps between Girder and Adjacent Pumps
Internal electrification of Pump House (CWR), Pannel room and campus with Light & Fan wiring and & other Necessary works.
H.O.T. crane of 3 Tones capacity , Lift 4.5 Mtr
Testing of pumps & other equipment at work site
Painting of equipment with two coats.
CE / UL certified Intelligent smart energy meter
Motor Operated sluice valve with Actuator for Pumps(250mm)
Motor Operated sluice valve with Actuator for Common Header (350mm)
Electromagnetic flowmeter of size: 350mm for common header
Auto phase reversal unit with inbuilt time delay & enclosure conforming to IEC: 60947-1 & IEC:60947-b-1) (160 Amps)
CE / UL certified Radar type Level Transmitter for CWR
CE / UL certified Smart Pressure Transmitter
CE / UL certified Surge protector for control panel
CE / UL certified 7" HMI touchscreen suitable to communicate with PLC/RTU, for local display & control of process parameters
Complete Cabling for CWR including all power & control cable of all equipments at CWR and OHT
Control panel with IP 54 protection, industrial grade fro all equipments (separate for control (24V) and power equipments.
Installation, commissioning & testing
11/0.40 KV 200 KVA Electric Sub Station
200 KVA Sub Station at CWR
Automation of CWR
CE & UL Certified PLC/RTU with redudant CPU and Power supply in IP 54 enclosure suitable to Communicate with GSM based modem unit with redudant CPU & Power supply with analog & digital parameter & fetures as specified for each ZPS/OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations as specified in tender technical specification.
G.S.M/G.P.R.S based wireless communication 4G Modem for RTU/PLC Capable to transfer & gather data from remote sites to control stations all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender technical specification.
3 months Trial and Run
District-6 OZ-1 (01 no New + 01 No Existing Tubewell)
CONSTRUCTION OF TUBEWELL
Transportation of Rig m/c and its T&P including Erection and Dismantling of Rig m/c.
Transportation, Erection & Dismantling of 250 PSI Air Compressor.
By O.P. Unit
Transportation, Erection & Dismantling of 1 Cusec O.P. Unit and Yield Test.
Logging of bore hole by departmental/approved electric logger.
Drilling of 600 mm dia bore from G.L. to 60 M BGL
500 mm dia Drilling from 61 to 100 M BGL
500 mm dia Drilling from 101 to 200 M BGL
TUBEWELL ASSEMBLY
M.S. tubewell assembly with all required parts like plain pipe, slotted pipe (as required upto 50% of plain pipes) rings, well cap, bail plug, clamp, reducer, central guide, support structure etc. as required & as per typed design complete in all respect. (Note-Axial Length of Reducer without Ring shall be measured with Casing Pipe.)
300 mm dia
200mm dia
LOWERING OF ASSEMBLY
Lowering of Tube Well assembly duly welded including welding electrode and shrouding of pea Gravel complete in all respect. (Note-Axial Length of Reducer without Ring shall be measured with Casing Pipe.)
300 mm dia size Assembly from 0 to 54 M BGL
200 mm dia size Assembly from 55 to 100 M BGL
200 mm dia size Assembly from 101 to 180 M BGL
PEA-GRAVEL
Supply of 1.6 - 4.8 mm size Lal Kuwan Quarry Pea-Gravel Duly Washed, Screened and properly Stacked at Site.
DEVELOPMENT OF TUBEWELL
Development of T.W. by 250 PSI Air Compressor with all required material, labour, T&P etc.
Development of T.W. by 3 Cusec O.P. Unit with all required material, labour, T&P etc.
chemical and bacteriological test
SCADA AUTOMATION OF Existing TUBEWELL
CE & UL Certified PLC/RTU in IP 65 enclosure suitable to Communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & fetures as specified for each tubewell/OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations as specified also enabled with UPS for power backup upto 2Hrs & automatic on/off switching arrangement.
G.S.M/G.P.R.S based wireless communication 4G Modem for RTU/PLC Capable to transfer & gather data from remote sites to control stations all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender technical specification.
CE/UL Certified Surge protector for control panel
CE/UL certified 7" HMI touch screen suitable to communicate with PLC/RTU for local display and control of process parameters.
Complete cabling for all equipments at pumphouse
Control panel with IP 54 protection, industrial grade for all equipment (Separate for control (24V) and power equipment).
CE/UL certified hydrostatic type subsoil water level treansmitter for tubewell
CE/UL Certified Pressure Transmiter .
SITC of Automatic chlorination system SCADA Compatable chlorinating system.
Installation, commissioing & testing for one tubewell
Trial Run for 3 month period for one tubewell
Pumping plant and Other instrumentation work For New Tubewell
SITC of 1200 LPM, 59 m head 30 H.P. submersible pump set with 24 meter 150mm dia column pipe assembly, NRV, CI D/F Bend 90°, CI A/F Tee, D/F pipe (1.5m long 2 Nos and 1.0m long 1 No), Earthing, Painting Toolset, Power wiring of pump house internal and external, Chainpully block, and all Pumping plant accessories with nut bolts and rubber packing etc. Rates of items required for SCADA Automation of pumping plant are not included in these rates.
SITC of Automatic chlorination system SCADA Compatable chlorinating system.
Misc item such as protection ring, MCCB, Transformer oil, electric resistance, rubber sheet, 25 sqmm ormad cable. Etc.
150mm Dia 3M long heavy duty column pipe same as above (Extra/Spare)
Supply & Erection of Servo Stabilizer of 50 KVA
CE / UL certified Intelligent smart energy meter
Motor Operated Actuator with Sluice Valve (150mm)
CE / UL certified Electromagnetic flowmeter of size:150mm
Soft Starter with Rs485 port-400 Class.
Auto phase reversal unit with inbuilt time delay & enclousre (confirm to IEC: 60947-1 & IEC: 60947-b-1)
CE / UL certified Hydrostatatic type sub soil water level transmitter
CE / UL certified Pressure Transmitter
SCADA AUTOMATION of New Tubewell
CE & UL Certified PLC/RTU in IP 65 enclosure suitable to Communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & fetures as specified for each tubewell/OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations as specified also enabled with UPS for power backup upto 2Hrs & automatic on/off switching arrangement.
G.S.M/G.P.R.S based wireless communication 4G Modem for RTU/PLC Capable to transfer & gather data from remote sites to control stations all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender technical specification.
CE/UL Certified Surge protector for control panel
CE/UL certified 7" HMI touch screen suitable to communicate with PLC/RTU for local display and control of process parameters.
Complete cabling for all equipments at pumphouse
Control panel with IP 54 protection, industrial grade for all equipment (Separate for control (24V) and power equipment).
Installation, commissioing & testing for one tubewell
Trial Run for 3 month period for one tubewell
Instrumentaion of OHT DMA-1 & 2
CE/UL Certified Radar type level Transmitter for OHT
Flow control Valve 250 mm size
Sluice valve 250mm Size
Electromagnetic Flowmeter of 250mm Size
CE / UL certified Pressure Transmitter
Residual chlorine analyzer with following description:- i- Chlorine Measuring sensor (Chlorine analyzer) for free chlorine membrane covered sensor 0.01…2mg/l; low pH dependency. ii- Single parameter system ready to operate to measure free or total chlorine iii- Connection cable 2 m, 2-wire, 2 x stripped ends, tinned iv- Battery and other accessories for power back for continous operation.
3 months Trial and Run
District-6 OZ-2 (02 No Existing Tubewell)
SCADA AUTOMATION OF TUBEWELL
CE & UL Certified PLC/RTU in IP 65 enclosure suitable to Communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & fetures as specified for each tubewell/OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations as specified also enabled with UPS for power backup upto 2Hrs & automatic on/off switching arrangement.
G.S.M/G.P.R.S based wireless communication 4G Modem for RTU/PLC Capable to transfer & gather data from remote sites to control stations all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender technical specification.
CE/UL Certified Surge protector for control panel
CE/UL certified 7" HMI touch screen suitable to communicate with PLC/RTU for local display and control of process parameters.
Complete cabling for all equipments at pumphouse
Control panel with IP 54 protection, industrial grade for all equipment (Separate for control (24V) and power equipment).
CE/UL certified hydrostatic type subsoil water level treansmitter for tubewell
CE/UL Certified Pressure Transmiter .
SITC of Automatic chlorination system SCADA Compatable chlorinating system.
Installation, commissioing & testing for one tubewell
Trial Run for 3 month period for one tubewell
Instrumentaion of OHT DMA-1 & DMA-2
CE/UL Certified Radar type level Transmitter for OHT
Flow control valve 200mm size
Motor operated actuator with sluice valve 200 mm size
Electromagnetic Flowmeter of 200mm Size
CE / UL certified Pressure Transmitter
Residual chlorine analyzer with following description:- i- Chlorine Measuring sensor (Chlorine analyzer) for free chlorine membrane covered sensor 0.01…2mg/l; low pH dependency. ii- Single parameter system ready to operate to measure free or total chlorine iii- Connection cable 2 m, 2-wire, 2 x stripped ends, tinned iv- Battery and other accessories for power back for continous operation.
3 months Trial and Run
District-6 OZ-3 (02 No New Tubewell)
CONSTRUCTION OF TUBEWELL
Transportation of Rig m/c and its T&P including Erection and Dismantling of Rig m/c.
Transportation, Erection & Dismantling of 250 PSI Air Compressor.
By O.P. Unit
Transportation, Erection & Dismantling of 1 Cusec O.P. Unit and Yield Test.
Logging of bore hole by departmental/approved electric logger.
Drilling of 600 mm dia bore from G.L. to 60 M BGL
450 mm dia Drilling from 61 to 100 M BGL
450 mm dia Drilling from 101 to 200 M BGL
TUBEWELL ASSEMBLY
M.S. tubewell assembly with all required parts like plain pipe, slotted pipe (as required upto 50% of plain pipes) rings, well cap, bail plug, clamp, reducer, central guide, support structure etc. as required & as per typed design complete in all respect. (Note-Axial Length of Reducer without Ring shall be measured with Casing Pipe.)
300 mm dia
150mm dia
LOWERING OF ASSEMBLY
Lowering of Tube Well assembly duly welded including welding electrode and shrouding of pea Gravel complete in all respect. (Note-Axial Length of Reducer without Ring shall be measured with Casing Pipe.)
300 mm dia size Assembly from 0 to 54 M BGL
150 mm dia size Assembly from 55 to 100 M BGL
150 mm dia size Assembly from 101 to 180 M BGL
PEA-GRAVEL
Supply of 1.6 - 4.8 mm size Lal Kuwan Quarry Pea-Gravel Duly Washed, Screened and properly Stacked at Site.
DEVELOPMENT OF TUBEWELL
Development of T.W. by 250 PSI Air Compressor with all required material, labour, T&P etc.
Development of T.W. by 3 Cusec O.P. Unit with all required material, labour, T&P etc.
chemical and bacteriological test
Pumping plant and Other instrumentation work
SITC of 800 LPM, 67 m head 20 H.P. submersible pump set with 24 meter 100mm dia column pipe assembly, NRV, CI D/F Bend 90°, CI A/F Tee, D/F pipe (1.5m long 2 Nos and 1.0m long 1 No), Earthing, Painting Toolset, Power wiring of pump house internal and external, Chainpully block, and all Pumping plant accessories with nut bolts and rubber packing etc. Rates of items required for SCADA Automation of pumping plant are not included in these rates.
SITC of Automatic chlorination system SCADA Compatable chlorinating system.
Misc item such as protection ring, MCCB, Transformer oil, electric resistance, rubber sheet, 25 sqmm ormad cable. Etc.
100mm Dia 3M long heavy duty column pipe same as above (Extra/Spare)
Supply & Erection of Servo Stabilizer of 30 KVA
CE / UL certified Intelligent smart energy meter
Motor Operated Actuator with Sluice Valve (100mm)
CE / UL certified Electromagnetic flowmeter of size:100mm
Soft Starter with Rs485 port-400 Class.
Auto phase reversal unit with inbuilt time delay & enclousre (confirm to IEC: 60947-1 & IEC: 60947-b-1)
CE / UL certified Hydrostatatic type sub soil water level transmitter
CE / UL certified Pressure Transmitter
SCADA AUTOMATION of New Tubewell
CE & UL Certified PLC/RTU in IP 65 enclosure suitable to Communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & fetures as specified for each tubewell/OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations as specified also enabled with UPS for power backup upto 2Hrs & automatic on/off switching arrangement.
G.S.M/G.P.R.S based wireless communication 4G Modem for RTU/PLC Capable to transfer & gather data from remote sites to control stations all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender technical specification.
CE/UL Certified Surge protector for control panel
CE/UL certified 7" HMI touch screen suitable to communicate with PLC/RTU for local display and control of process parameters.
Complete cabling for all equipments at pumphouse
Control panel with IP 54 protection, industrial grade for all equipment (Separate for control (24V) and power equipment).
Installation, commissioing & testing for one tubewell
Trial Run for 3 month period for one tubewell
Instrumentaion of OHT DMA-1
CE/UL Certified Radar type level Transmitter for OHT
Flow control Valve 300 mm size
Sluice valve 300mm Size
Electromagnetic Flowmeter of 300mm Size
CE / UL certified Pressure Transmitter
Residual chlorine analyzer with following description:- i- Chlorine Measuring sensor (Chlorine analyzer) for free chlorine membrane covered sensor 0.01…2mg/l; low pH dependency. ii- Single parameter system ready to operate to measure free or total chlorine iii- Connection cable 2 m, 2-wire, 2 x stripped ends, tinned iv- Battery and other accessories for power back for continous operation.
3 months Trial and Run
District-7 OZ-1 (02 No Existing Tubewell)
SCADA AUTOMATION OF TUBEWELL
CE & UL Certified PLC/RTU in IP 65 enclosure suitable to Communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & fetures as specified for each tubewell/OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations as specified also enabled with UPS for power backup upto 2Hrs & automatic on/off switching arrangement.
G.S.M/G.P.R.S based wireless communication 4G Modem for RTU/PLC Capable to transfer & gather data from remote sites to control stations all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender technical specification.
CE/UL Certified Surge protector for control panel
CE/UL certified 7" HMI touch screen suitable to communicate with PLC/RTU for local display and control of process parameters.
Complete cabling for all equipments at pumphouse
Control panel with IP 54 protection, industrial grade for all equipment (Separate for control (24V) and power equipment).
CE/UL certified hydrostatic type subsoil water level treansmitter for tubewell
CE/UL Certified Pressure Transmiter .
SITC of Automatic chlorination system SCADA Compatable chlorinating system.
Installation, commissioing & testing for one tubewell
Trial Run for 3 month period for one tubewell
Instrumentaion of OHT DMA-1
CE/UL Certified Radar type level Transmitter for OHT
Flow control valve 300mm size
Sluice valve 300mm Size for main feeder
Sluice valve 300mm Size
Electromagnetic Flowmeter of 300mm Size
CE / UL certified Pressure Transmitter
Residual chlorine analyzer with following description:- i- Chlorine Measuring sensor (Chlorine analyzer) for free chlorine membrane covered sensor 0.01…2mg/l; low pH dependency. ii- Single parameter system ready to operate to measure free or total chlorine iii- Connection cable 2 m, 2-wire, 2 x stripped ends, tinned iv- Battery and other accessories for power back for continous operation.
Instrumentaion of OHT DMA-2
Flow control valve 200mm size
Sluice valve 200mm Size
Electromagnetic Flowmeter of 200mm Size
CE / UL certified Pressure Transmitter
Residual chlorine analyzer with following description:- i- Chlorine Measuring sensor (Chlorine analyzer) for free chlorine membrane covered sensor 0.01…2mg/l; low pH dependency. ii- Single parameter system ready to operate to measure free or total chlorine iii- Connection cable 2 m, 2-wire, 2 x stripped ends, tinned iv- Battery and other accessories for power back for continous operation.
Booster Pump
Provision of suitable capacity booster pumping system for differential head of (08 to 10mtr). Note:- 4No.(3W+1S) pumps will be provided . Each pump will be coupled with motor (IE3) along with VFD for each pump.
Accumulator tank/system. For Booster pump
3 months Trial and Run
District-7 OZ-2 (03 No Existing Tubewell)
SCADA AUTOMATION OF TUBEWELL
CE & UL Certified PLC/RTU in IP 65 enclosure suitable to Communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & fetures as specified for each tubewell/OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations as specified also enabled with UPS for power backup upto 2Hrs & automatic on/off switching arrangement.
G.S.M/G.P.R.S based wireless communication 4G Modem for RTU/PLC Capable to transfer & gather data from remote sites to control stations all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender technical specification.
CE/UL Certified Surge protector for control panel
CE/UL certified 7" HMI touch screen suitable to communicate with PLC/RTU for local display and control of process parameters.
Complete cabling for all equipments at pumphouse
Control panel with IP 54 protection, industrial grade for all equipment (Separate for control (24V) and power equipment).
CE/UL certified hydrostatic type subsoil water level treansmitter for tubewell
CE/UL Certified Pressure Transmiter .
SITC of Automatic chlorination system SCADA Compatable chlorinating system.
Installation, commissioing & testing for one tubewell
Trial Run for 3 month period for one tubewell
Instrumentaion of OHT DMA-1
CE/UL Certified Radar type level Transmitter for OHT
Flow control valve 250mm size
sluice valve 250 mm size
Electromagnetic Flowmeter of 250mm Size
CE / UL certified Pressure Transmitter
Residual chlorine analyzer with following description:- i- Chlorine Measuring sensor (Chlorine analyzer) for free chlorine membrane covered sensor 0.01…2mg/l; low pH dependency. ii- Single parameter system ready to operate to measure free or total chlorine iii- Connection cable 2 m, 2-wire, 2 x stripped ends, tinned iv- Battery and other accessories for power back for continous operation.
Instrumentaion of OHT DMA-2
Flow control valve 300mm size
sluice valve 300 mm size
Electromagnetic Flowmeter of 300mm Size
CE / UL certified Pressure Transmitter
Residual chlorine analyzer with following description:- i- Chlorine Measuring sensor (Chlorine analyzer) for free chlorine membrane covered sensor 0.01…2mg/l; low pH dependency. ii- Single parameter system ready to operate to measure free or total chlorine iii- Connection cable 2 m, 2-wire, 2 x stripped ends, tinned iv- Battery and other accessories for power back for continous operation.
3 months Trial and Run
District-7 OZ-3 (03 No Existing Tubewell)
SCADA AUTOMATION OF TUBEWELL
CE & UL Certified PLC/RTU in IP 65 enclosure suitable to Communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & fetures as specified for each tubewell/OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations as specified also enabled with UPS for power backup upto 2Hrs & automatic on/off switching arrangement.
G.S.M/G.P.R.S based wireless communication 4G Modem for RTU/PLC Capable to transfer & gather data from remote sites to control stations all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender technical specification.
CE/UL Certified Surge protector for control panel
CE/UL certified 7" HMI touch screen suitable to communicate with PLC/RTU for local display and control of process parameters.
Complete cabling for all equipments at pumphouse
Control panel with IP 54 protection, industrial grade for all equipment (Separate for control (24V) and power equipment).
CE/UL certified hydrostatic type subsoil water level treansmitter for tubewell
CE/UL Certified Pressure Transmiter .
SITC of Automatic chlorination system SCADA Compatable chlorinating system.
Installation, commissioing & testing for one tubewell
Trial Run for 3 month period for one tubewell
Instrumentaion of OHT DMA-1 & DMA-2
CE/UL Certified Radar type level Transmitter for OHT
Flow control valve 250mm size
sluice valve 250 mm size
Electromagnetic Flowmeter of 250mm Size
CE / UL certified Pressure Transmitter
Residual chlorine analyzer with following description:- i- Chlorine Measuring sensor (Chlorine analyzer) for free chlorine membrane covered sensor 0.01…2mg/l; low pH dependency. ii- Single parameter system ready to operate to measure free or total chlorine iii- Connection cable 2 m, 2-wire, 2 x stripped ends, tinned iv- Battery and other accessories for power back for continous operation.
3 months Trial and Run
District-7 OZ-4 (02 No Existing Tubewell)
SCADA AUTOMATION OF TUBEWELL
CE & UL Certified PLC/RTU in IP 65 enclosure suitable to Communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & fetures as specified for each tubewell/OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations as specified also enabled with UPS for power backup upto 2Hrs & automatic on/off switching arrangement.
G.S.M/G.P.R.S based wireless communication 4G Modem for RTU/PLC Capable to transfer & gather data from remote sites to control stations all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender technical specification.
CE/UL Certified Surge protector for control panel
CE/UL certified 7" HMI touch screen suitable to communicate with PLC/RTU for local display and control of process parameters.
Complete cabling for all equipments at pumphouse
Control panel with IP 54 protection, industrial grade for all equipment (Separate for control (24V) and power equipment).
CE/UL certified hydrostatic type subsoil water level treansmitter for tubewell
CE/UL Certified Pressure Transmiter .
SITC of Automatic chlorination system SCADA Compatable chlorinating system.
Installation, commissioing & testing for one tubewell
Trial Run for 3 month period for one tubewell
Instrumentaion of OHT DMA-1
CE/UL Certified Radar type level Transmitter for OHT
Flow control valve 200mm size
Sluice valve 200mm Size
Electromagnetic Flowmeter of 200mm Size
CE / UL certified Pressure Transmitter
Residual chlorine analyzer with following description:- i- Chlorine Measuring sensor (Chlorine analyzer) for free chlorine membrane covered sensor 0.01…2mg/l; low pH dependency. ii- Single parameter system ready to operate to measure free or total chlorine iii- Connection cable 2 m, 2-wire, 2 x stripped ends, tinned iv- Battery and other accessories for power back for continous operation.
Booster Pump
Provision of suitable capacity booster pumping system for differential head of (08 to 10mtr). Note:- 4No.(3W+1S) pumps will be provided . Each pump will be coupled with motor (IE3) along with VFD for each pump.
Accumulator tank/system. For Booster pump
3 months Trial and Run
District-7 OZ-5 (04 No Existing Tubewell)
SCADA AUTOMATION OF TUBEWELL
CE & UL Certified PLC/RTU in IP 65 enclosure suitable to Communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & fetures as specified for each tubewell/OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations as specified also enabled with UPS for power backup upto 2Hrs & automatic on/off switching arrangement.
G.S.M/G.P.R.S based wireless communication 4G Modem for RTU/PLC Capable to transfer & gather data from remote sites to control stations all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender technical specification.
CE/UL Certified Surge protector for control panel
CE/UL certified 7" HMI touch screen suitable to communicate with PLC/RTU for local display and control of process parameters.
Complete cabling for all equipments at pumphouse
Control panel with IP 54 protection, industrial grade for all equipment (Separate for control (24V) and power equipment).
CE/UL certified hydrostatic type subsoil water level treansmitter for tubewell
CE/UL Certified Pressure Transmiter .
SITC of Automatic chlorination system SCADA Compatable chlorinating system.
Installation, commissioing & testing for one tubewell
Trial Run for 3 month period for one tubewell
Instrumentaion of OHT DMA-1 & 2
CE/UL Certified Radar type level Transmitter for OHT
Sluice valve 300mm Size
Flow control valve 300mm size
Electromagnetic Flowmeter of 300mm Size
CE / UL certified Pressure Transmitter
Residual chlorine analyzer with following description:- i- Chlorine Measuring sensor (Chlorine analyzer) for free chlorine membrane covered sensor 0.01…2mg/l; low pH dependency. ii- Single parameter system ready to operate to measure free or total chlorine iii- Connection cable 2 m, 2-wire, 2 x stripped ends, tinned iv- Battery and other accessories for power back for continous operation.
Instrumentaion of OHT DMA-3
Sluice valve 200mm Size
Flow control valve 200mm size
Electromagnetic Flowmeter of 200mm Size
CE / UL certified Pressure Transmitter
Residual chlorine analyzer with following description:- i- Chlorine Measuring sensor (Chlorine analyzer) for free chlorine membrane covered sensor 0.01…2mg/l; low pH dependency. ii- Single parameter system ready to operate to measure free or total chlorine iii- Connection cable 2 m, 2-wire, 2 x stripped ends, tinned iv- Battery and other accessories for power back for continous operation.
3 months Trial and Run
District-7 OZ-5 CWR
V.T. Pump- Motor Set
2400 LPM 43M head 40 HP Clear Water 1450 RPM, surface discharge, self water lubricated, Bottom Suction with 3 M long column Assembly ( Column Pipe shaft & Rubber spider) Discharge head, Top shaft, rachet to prevent reverse rotation, suitable to couple with 3 phase 4 Pole, Vertical hollow shaft 1450 RPM squirrel cage 400 V ± 10% 50 Hz, AC, Motor etc.
Starter
Provision of Digital Soft Starter to operate Upto 40 HP motor at 0.4 KV + 10% 3 phase, 50 Hz. A.C. and to control the above motors. It shall comprise of all protection devices as per latest I.S.S. specifications.
Provision and laying of PVC armoured Power cables of required sizes with earthing material.for internal wiring i.e Panel to Starters and from Starters to Motors
Delivery pipes and specials as per details given below: 200 mm size individual delivery and 300 mm size common delivery with jointing material, valves, Tee, bends etc. i- 200 mm dia Detachable Joint-3 Nos ii-200 mm dia Bend- 3 Nos iii-200 X 300 mm Tee- 3 iv-300 mm Reflux Valve-1 Nos. v-200 mm Reflux Valve-3 Nos. vi-300 mm dia Duckfoot Bend-1 Nos. vii-300 mm dia Common Header-15 M 300 mm dia Blind Flange-1 No
Provision of MS Girder for pump base etc.
Chukkered Plate and Grills to cover the Gaps between Girder and Adjacent Pumps
Internal electrification of Pump House (CWR), Pannel room and campus with Light & Fan wiring and & other Necessary works.
H.O.T. crane of 3 Tones capacity , Lift 4.5 Mtr
Testing of pumps & other equipment at work site
Painting of equipment with two coats.
CE / UL certified Intelligent smart energy meter
Motor Operated sluice valve with Actuator for Pumps(200mm)
Motor Operated sluice valve with Actuator for Common Header (300mm)
Electromagnetic flowmeter of size: 300mm for common header
Auto phase reversal unit with inbuilt time delay & enclosure conforming to IEC: 60947-1 & IEC:60947-b-1) (160 Amps)
CE / UL certified Radar type Level Transmitter for CWR
CE / UL certified Smart Pressure Transmitter
CE / UL certified Surge protector for control panel
CE / UL certified 7" HMI touchscreen suitable to communicate with PLC/RTU, for local display & control of process parameters
Complete Cabling for CWR including all power & control cable of all equipments at CWR and OHT
Control panel with IP 54 protection, industrial grade fro all equipments (separate for control (24V) and power equipments.
Installation, commissioning & testing
11/0.40 KV 160 KVA Electric Sub Station
160 KVA Sub Station at CWR
Automation of CWR
CE & UL Certified PLC/RTU with redudant CPU and Power supply in IP 54 enclosure suitable to Communicate with GSM based modem unit with redudant CPU & Power supply with analog & digital parameter & fetures as specified for each ZPS/OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations as specified in tender technical specification.
G.S.M/G.P.R.S based wireless communication 4G Modem for RTU/PLC Capable to transfer & gather data from remote sites to control stations all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender technical specification.
3 months Trial and Run
District-8 OZ-1 (01 no New + 01 No Existing Tubewell)
CONSTRUCTION OF TUBEWELL
Transportation of Rig m/c and its T&P including Erection and Dismantling of Rig m/c.
Transportation, Erection & Dismantling of 250 PSI Air Compressor.
By O.P. Unit
Transportation, Erection & Dismantling of 1 Cusec O.P. Unit and Yield Test.
Logging of bore hole by departmental/approved electric logger.
Drilling of 500 mm dia bore from G.L. to 60 M BGL
450 mm dia Drilling from 61 to 100 M BGL
450 mm dia Drilling from 101 to 200 M BGL
TUBEWELL ASSEMBLY
M.S. tubewell assembly with all required parts like plain pipe, slotted pipe (as required upto 50% of plain pipes) rings, well cap, bail plug, clamp, reducer, central guide, support structure etc. as required & as per typed design complete in all respect. (Note-Axial Length of Reducer without Ring shall be measured with Casing Pipe.)
200 mm dia
150mm dia
LOWERING OF ASSEMBLY
Lowering of Tube Well assembly duly welded including welding electrode and shrouding of pea Gravel complete in all respect. (Note-Axial Length of Reducer without Ring shall be measured with Casing Pipe.)
200 mm dia size Assembly from 0 to 54 M BGL
150 mm dia size Assembly from 55 to 100 M BGL
150 mm dia size Assembly from 101 to 180 M BGL
PEA-GRAVEL
Supply of 1.6 - 4.8 mm size Lal Kuwan Quarry Pea-Gravel Duly Washed, Screened and properly Stacked at Site.
DEVELOPMENT OF TUBEWELL
Development of T.W. by 250 PSI Air Compressor with all required material, labour, T&P etc.
Development of T.W. by 3 Cusec O.P. Unit with all required material, labour, T&P etc.
chemical and bacteriological test
SCADA AUTOMATION OF Existing TUBEWELL
CE & UL Certified PLC/RTU in IP 65 enclosure suitable to Communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & fetures as specified for each tubewell/OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations as specified also enabled with UPS for power backup upto 2Hrs & automatic on/off switching arrangement.
G.S.M/G.P.R.S based wireless communication 4G Modem for RTU/PLC Capable to transfer & gather data from remote sites to control stations all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender technical specification.
CE/UL Certified Surge protector for control panel
CE/UL certified 7" HMI touch screen suitable to communicate with PLC/RTU for local display and control of process parameters.
Complete cabling for all equipments at pumphouse
Control panel with IP 54 protection, industrial grade for all equipment (Separate for control (24V) and power equipment).
CE/UL certified hydrostatic type subsoil water level treansmitter for tubewell
CE/UL Certified Pressure Transmiter .
SITC of Automatic chlorination system SCADA Compatable chlorinating system.
Installation, commissioing & testing for one tubewell
Trial Run for 3 month period for one tubewell
Pumping plant and Other instrumentation work for New and OLD Tubewell
SITC of 600 LPM, 54 m head 12.50 H.P. submersible pump set with 24 meter 80mm dia column pipe assembly, NRV, CI D/F Bend 90°, CI A/F Tee, D/F pipe (1.5m long 2 Nos and 1.0m long 1 No), Earthing, Painting Toolset, Power wiring of pump house internal and external, Chainpully block, and all Pumping plant accessories with nut bolts and rubber packing etc. Rates of items required for SCADA Automation of pumping plant are not included in these rates.
SITC of Automatic chlorination system SCADA Compatable chlorinating system.
Misc item such as protection ring, MCCB, Transformer oil, electric resistance, rubber sheet, 25 sqmm ormad cable. Etc.
80mm Dia 3M long heavy duty column pipe same as above (Extra/Spare)
Supply & Erection of Servo Stabilizer of 25 KVA
CE / UL certified Intelligent smart energy meter
Motor Operated Actuator with Sluice Valve (upto 150mm)
CE / UL certified Electromagnetic flowmeter of size:upto 150mm
Soft Starter with Rs485 port-400 Class.
Auto phase reversal unit with inbuilt time delay & enclousre (confirm to IEC: 60947-1 & IEC: 60947-b-1)
CE / UL certified Hydrostatatic type sub soil water level transmitter
CE / UL certified Pressure Transmitter
SCADA AUTOMATION of New Tubewell
CE & UL Certified PLC/RTU in IP 65 enclosure suitable to Communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & fetures as specified for each tubewell/OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations as specified also enabled with UPS for power backup upto 2Hrs & automatic on/off switching arrangement.
G.S.M/G.P.R.S based wireless communication 4G Modem for RTU/PLC Capable to transfer & gather data from remote sites to control stations all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender technical specification.
CE/UL Certified Surge protector for control panel
CE/UL certified 7" HMI touch screen suitable to communicate with PLC/RTU for local display and control of process parameters.
Complete cabling for all equipments at pumphouse
Control panel with IP 54 protection, industrial grade for all equipment (Separate for control (24V) and power equipment).
Installation, commissioing & testing for one tubewell
Trial Run for 3 month period for one tubewell
Instrumentaion of OHT DMA-1
CE/UL Certified Radar type level Transmitter for OHT
Flow control Valve 200 mm size
Sluice valve 200mm Size
Electromagnetic Flowmeter of 200mm Size
CE / UL certified Pressure Transmitter
Residual chlorine analyzer with following description:- i- Chlorine Measuring sensor (Chlorine analyzer) for free chlorine membrane covered sensor 0.01…2mg/l; low pH dependency. ii- Single parameter system ready to operate to measure free or total chlorine iii- Connection cable 2 m, 2-wire, 2 x stripped ends, tinned iv- Battery and other accessories for power back for continous operation.
3 months Trial and Run
District-8 OZ-2 (01 no New + 04 No Existing Tubewell)
CONSTRUCTION OF TUBEWELL
Transportation of Rig m/c and its T&P including Erection and Dismantling of Rig m/c.
Transportation, Erection & Dismantling of 250 PSI Air Compressor.
By O.P. Unit
Transportation, Erection & Dismantling of 1 Cusec O.P. Unit and Yield Test.
Logging of bore hole by departmental/approved electric logger.
Drilling of 600 mm dia bore from G.L. to 60 M BGL
500 mm dia Drilling from 61 to 100 M BGL
500 mm dia Drilling from 101 to 200 M BGL
TUBEWELL ASSEMBLY
M.S. tubewell assembly with all required parts like plain pipe, slotted pipe (as required upto 50% of plain pipes) rings, well cap, bail plug, clamp, reducer, central guide, support structure etc. as required & as per typed design complete in all respect. (Note-Axial Length of Reducer without Ring shall be measured with Casing Pipe.)
300 mm dia
200mm dia
LOWERING OF ASSEMBLY
Lowering of Tube Well assembly duly welded including welding electrode and shrouding of pea Gravel complete in all respect. (Note-Axial Length of Reducer without Ring shall be measured with Casing Pipe.)
300 mm dia size Assembly from 0 to 54 M BGL
200 mm dia size Assembly from 55 to 100 M BGL
200 mm dia size Assembly from 101 to 180 M BGL
PEA-GRAVEL
Supply of 1.6 - 4.8 mm size Lal Kuwan Quarry Pea-Gravel Duly Washed, Screened and properly Stacked at Site.
DEVELOPMENT OF TUBEWELL
Development of T.W. by 250 PSI Air Compressor with all required material, labour, T&P etc.
Development of T.W. by 3 Cusec O.P. Unit with all required material, labour, T&P etc.
chemical and bacteriological test
SCADA AUTOMATION OF Existing TUBEWELL
CE & UL Certified PLC/RTU in IP 65 enclosure suitable to Communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & fetures as specified for each tubewell/OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations as specified also enabled with UPS for power backup upto 2Hrs & automatic on/off switching arrangement.
G.S.M/G.P.R.S based wireless communication 4G Modem for RTU/PLC Capable to transfer & gather data from remote sites to control stations all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender technical specification.
CE/UL Certified Surge protector for control panel
CE/UL certified 7" HMI touch screen suitable to communicate with PLC/RTU for local display and control of process parameters.
Complete cabling for all equipments at pumphouse
Control panel with IP 54 protection, industrial grade for all equipment (Separate for control (24V) and power equipment).
CE/UL certified hydrostatic type subsoil water level treansmitter for tubewell
CE/UL Certified Pressure Transmiter .
SITC of Automatic chlorination system SCADA Compatable chlorinating system.
Installation, commissioing & testing for one tubewell
Trial Run for 3 month period for one tubewell
Pumping plant and Other instrumentation work for 01 No New + 03 Nos Existing TW)
SITC of 1200 LPM, 37 m head 20 H.P. submersible pump set with 24 meter 150mm dia column pipe assembly, NRV, CI D/F Bend 90°, CI A/F Tee, D/F pipe (1.5m long 2 Nos and 1.0m long 1 No), Earthing, Painting Toolset, Power wiring of pump house internal and external, Chainpully block, and all Pumping plant accessories with nut bolts and rubber packing etc. Rates of items required for SCADA Automation of pumping plant are not included in these rates.
SITC of Automatic chlorination system SCADA Compatable chlorinating system.
Misc item such as protection ring, MCCB, Transformer oil, electric resistance, rubber sheet, 25 sqmm ormad cable. Etc.
150mm Dia 3M long heavy duty column pipe same as above (Extra/Spare)
Supply & Erection of Servo Stabilizer of 30 KVA
CE / UL certified Intelligent smart energy meter
Motor Operated Actuator with Sluice Valve ( 150mm)
CE / UL certified Electromagnetic flowmeter of size: 150mm
Soft Starter with Rs485 port-400 Class.
Auto phase reversal unit with inbuilt time delay & enclousre (confirm to IEC: 60947-1 & IEC: 60947-b-1)
CE / UL certified Hydrostatatic type sub soil water level transmitter
CE / UL certified Pressure Transmitter
SCADA AUTOMATION of New Tubewell
CE & UL Certified PLC/RTU in IP 65 enclosure suitable to Communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & fetures as specified for each tubewell/OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations as specified also enabled with UPS for power backup upto 2Hrs & automatic on/off switching arrangement.
G.S.M/G.P.R.S based wireless communication 4G Modem for RTU/PLC Capable to transfer & gather data from remote sites to control stations all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender technical specification.
CE/UL Certified Surge protector for control panel
CE/UL certified 7" HMI touch screen suitable to communicate with PLC/RTU for local display and control of process parameters.
Complete cabling for all equipments at pumphouse
Control panel with IP 54 protection, industrial grade for all equipment (Separate for control (24V) and power equipment).
Installation, commissioing & testing for one tubewell
Trial Run for 3 month period for one tubewell
Instrumentaion of OHT DMA-1, 2 & 3
CE/UL Certified Radar type level Transmitter for OHT
Sluice valve 300mm Size
Flow control Valve 300 mm size
Electromagnetic Flowmeter of 300mm Size
CE / UL certified Pressure Transmitter
Residual chlorine analyzer with following description:- i- Chlorine Measuring sensor (Chlorine analyzer) for free chlorine membrane covered sensor 0.01…2mg/l; low pH dependency. ii- Single parameter system ready to operate to measure free or total chlorine iii- Connection cable 2 m, 2-wire, 2 x stripped ends, tinned iv- Battery and other accessories for power back for continous operation.
3 months Trial and Run
District-8 OZ-3 ( 04 No Existing Tubewell)
SCADA AUTOMATION OF Existing TUBEWELL
CE & UL Certified PLC/RTU in IP 65 enclosure suitable to Communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & fetures as specified for each tubewell/OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations as specified also enabled with UPS for power backup upto 2Hrs & automatic on/off switching arrangement.
G.S.M/G.P.R.S based wireless communication 4G Modem for RTU/PLC Capable to transfer & gather data from remote sites to control stations all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender technical specification.
CE/UL Certified Surge protector for control panel
CE/UL certified 7" HMI touch screen suitable to communicate with PLC/RTU for local display and control of process parameters.
Complete cabling for all equipments at pumphouse
Control panel with IP 54 protection, industrial grade for all equipment (Separate for control (24V) and power equipment).
CE/UL certified hydrostatic type subsoil water level treansmitter for tubewell
CE/UL Certified Pressure Transmiter .
SITC of Automatic chlorination system SCADA Compatable chlorinating system.
Installation, commissioing & testing for one tubewell
Trial Run for 3 month period for one tubewell
Instrumentaion of OHT DMA-1 & 2
CE/UL Certified Radar type level Transmitter for OHT
Sluice valve 300mm Size
Flow control Valve 300 mm size
Electromagnetic Flowmeter of 300mm Size
CE / UL certified Pressure Transmitter
Residual chlorine analyzer with following description:- i- Chlorine Measuring sensor (Chlorine analyzer) for free chlorine membrane covered sensor 0.01…2mg/l; low pH dependency. ii- Single parameter system ready to operate to measure free or total chlorine iii- Connection cable 2 m, 2-wire, 2 x stripped ends, tinned iv- Battery and other accessories for power back for continous operation.
Instrumentaion of OHT DMA-3
Sluice valve 200mm Size
Flow control Valve 200 mm size
Electromagnetic Flowmeter of 200mm Size
CE / UL certified Pressure Transmitter
Residual chlorine analyzer with following description:- i- Chlorine Measuring sensor (Chlorine analyzer) for free chlorine membrane covered sensor 0.01…2mg/l; low pH dependency. ii- Single parameter system ready to operate to measure free or total chlorine iii- Connection cable 2 m, 2-wire, 2 x stripped ends, tinned iv- Battery and other accessories for power back for continous operation.
3 months Trial and Run
District-8 OZ-2 CWR
V.T. Pump- Motor Set
3000 LPM 43M head 50 HP Clear Water 1450 RPM, surface discharge, self water lubricated, Bottom Suction with 3 M long column Assembly ( Column Pipe shaft & Rubber spider) Discharge head, Top shaft, rachet to prevent reverse rotation, suitable to couple with 3 phase 4 Pole, Vertical hollow shaft 1450 RPM squirrel cage 400 V ± 10% 50 Hz, AC, Motor etc.
Starter
Provision of Digital Soft Starter to operate Upto 40 HP motor at 0.4 KV + 10% 3 phase, 50 Hz. A.C. and to control the above motors. It shall comprise of all protection devices as per latest I.S.S. specifications.
Provision and laying of PVC armoured Power cables of required sizes with earthing material.for internal wiring i.e Panel to Starters and from Starters to Motors
Delivery pipes and specials as per details given below: 200 mm size individual delivery and 300 mm size common delivery with jointing material, valves, Tee, bends etc. i- 200 mm dia Detachable Joint-3 Nos ii-200 mm dia Bend- 3 Nos iii-200 X 300 mm Tee- 3 iv-300 mm Reflux Valve-1 Nos. v-200 mm Reflux Valve-3 Nos. vi-300 mm dia Duckfoot Bend-1 Nos. vii-300 mm dia Common Header-15 M 300 mm dia Blind Flange-1 No
Provision of MS Girder for pump base etc.
Chukkered Plate and Grills to cover the Gaps between Girder and Adjacent Pumps
Internal electrification of Pump House (CWR), Pannel room and campus with Light & Fan wiring and & other Necessary works.
H.O.T. crane of 3 Tones capacity , Lift 4.5 Mtr
Testing of pumps & other equipment at work site
Painting of equipment with two coats.
CE / UL certified Intelligent smart energy meter
Motor Operated sluice valve with Actuator for Pumps(250mm)
Motor Operated sluice valve with Actuator for Common Header (350mm)
Electromagnetic flowmeter of size: 350mm for common header
Auto phase reversal unit with inbuilt time delay & enclosure conforming to IEC: 60947-1 & IEC:60947-b-1) (160 Amps)
CE / UL certified Radar type Level Transmitter for CWR
CE / UL certified Smart Pressure Transmitter
CE / UL certified Surge protector for control panel
CE / UL certified 7" HMI touchscreen suitable to communicate with PLC/RTU, for local display & control of process parameters
Complete Cabling for CWR including all power & control cable of all equipments at CWR and OHT
Control panel with IP 54 protection, industrial grade fro all equipments (separate for control (24V) and power equipments.
Installation, commissioning & testing
11/0.40 KV 200 KVA Electric Sub Station
200 KVA Sub Station at CWR
Automation of CWR
CE & UL Certified PLC/RTU with redudant CPU and Power supply in IP 54 enclosure suitable to Communicate with GSM based modem unit with redudant CPU & Power supply with analog & digital parameter & fetures as specified for each ZPS/OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations as specified in tender technical specification.
G.S.M/G.P.R.S based wireless communication 4G Modem for RTU/PLC Capable to transfer & gather data from remote sites to control stations all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender technical specification.
3 months Trial and Run
District-8 OZ-3 CWR
V.T. Pump- Motor Set
2400 LPM 43M head 40 HP Clear Water 1450 RPM, surface discharge, self water lubricated, Bottom Suction with 3 M long column Assembly ( Column Pipe shaft & Rubber spider) Discharge head, Top shaft, rachet to prevent reverse rotation, suitable to couple with 3 phase 4 Pole, Vertical hollow shaft 1450 RPM squirrel cage 400 V ± 10% 50 Hz, AC, Motor etc.
Starter
Provision of Digital Soft Starter to operate Upto 40 HP motor at 0.4 KV + 10% 3 phase, 50 Hz. A.C. and to control the above motors. It shall comprise of all protection devices as per latest I.S.S. specifications.
Provision and laying of PVC armoured Power cables of required sizes with earthing material.for internal wiring i.e Panel to Starters and from Starters to Motors
Delivery pipes and specials as per details given below: 200 mm size individual delivery and 300 mm size common delivery with jointing material, valves, Tee, bends etc. i- 200 mm dia Detachable Joint-3 Nos ii-200 mm dia Bend- 3 Nos iii-200 X 300 mm Tee- 3 iv-300 mm Reflux Valve-1 Nos. v-200 mm Reflux Valve-3 Nos. vi-300 mm dia Duckfoot Bend-1 Nos. vii-300 mm dia Common Header-15 M 300 mm dia Blind Flange-1 No
Provision of MS Girder for pump base etc.
Chukkered Plate and Grills to cover the Gaps between Girder and Adjacent Pumps
Internal electrification of Pump House (CWR), Pannel room and campus with Light & Fan wiring and & other Necessary works.
H.O.T. crane of 3 Tones capacity , Lift 4.5 Mtr
Testing of pumps & other equipment at work site
Painting of equipment with two coats.
CE / UL certified Intelligent smart energy meter
Motor Operated sluice valve with Actuator for Pumps(200mm)
Motor Operated sluice valve with Actuator for Common Header (300mm)
Electromagnetic flowmeter of size: 300mm for common header
Auto phase reversal unit with inbuilt time delay & enclosure conforming to IEC: 60947-1 & IEC:60947-b-1) (160 Amps)
CE / UL certified Radar type Level Transmitter for CWR
CE / UL certified Smart Pressure Transmitter
CE / UL certified Surge protector for control panel
CE / UL certified 7" HMI touchscreen suitable to communicate with PLC/RTU, for local display & control of process parameters
Complete Cabling for CWR including all power & control cable of all equipments at CWR and OHT
Control panel with IP 54 protection, industrial grade fro all equipments (separate for control (24V) and power equipments.
Installation, commissioning & testing
11/0.40 KV 160 KVA Electric Sub Station
160 KVA Sub Station at CWR
Automation of CWR
CE & UL Certified PLC/RTU with redudant CPU and Power supply in IP 54 enclosure suitable to Communicate with GSM based modem unit with redudant CPU & Power supply with analog & digital parameter & fetures as specified for each ZPS/OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations as specified in tender technical specification.
G.S.M/G.P.R.S based wireless communication 4G Modem for RTU/PLC Capable to transfer & gather data from remote sites to control stations all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender technical specification.
3 months Trial and Run
District-25 OZ-1
CONSTRUCTION OF TUBEWELL
Transportation of Rig m/c and its T&P including Erection and Dismantling of Rig m/c.
Transportation, Erection & Dismantling of 250 PSI Air Compressor.
By O.P. Unit
Transportation, Erection & Dismantling of 1 Cusec O.P. Unit and Yield Test.
Logging of bore hole by departmental/approved electric logger.
Drilling of 600 mm dia bore from G.L. to 60 M BGL
500 mm dia Drilling from 61 to 100 M BGL
500 mm dia Drilling from 101 to 200 M BGL
TUBEWELL ASSEMBLY
M.S. tubewell assembly with all required parts like plain pipe, slotted pipe (as required upto 50% of plain pipes) rings, well cap, bail plug, clamp, reducer, central guide, support structure etc. as required & as per typed design complete in all respect. (Note-Axial Length of Reducer without Ring shall be measured with Casing Pipe.)
300 mm dia
200mm dia
LOWERING OF ASSEMBLY
Lowering of Tube Well assembly duly welded including welding electrode and shrouding of pea Gravel complete in all respect. (Note-Axial Length of Reducer without Ring shall be measured with Casing Pipe.)
300 mm dia size Assembly from 0 to 54 M BGL
200 mm dia size Assembly from 55 to 100 M BGL
200 mm dia size Assembly from 101 to 180 M BGL
PEA-GRAVEL
Supply of 1.6 - 4.8 mm size Lal Kuwan Quarry Pea-Gravel Duly Washed, Screened and properly Stacked at Site.
DEVELOPMENT OF TUBEWELL
Development of T.W. by 250 PSI Air Compressor with all required material, labour, T&P etc.
Development of T.W. by 3 Cusec O.P. Unit with all required material, labour, T&P etc.
chemical and bacteriological test
SCADA AUTOMATION OF Existing TUBEWELL
CE & UL Certified PLC/RTU in IP 65 enclosure suitable to Communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & fetures as specified for each tubewell/OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations as specified also enabled with UPS for power backup upto 2Hrs & automatic on/off switching arrangement.
G.S.M/G.P.R.S based wireless communication 4G Modem for RTU/PLC Capable to transfer & gather data from remote sites to control stations all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender technical specification.
CE/UL Certified Surge protector for control panel
CE/UL certified 7" HMI touch screen suitable to communicate with PLC/RTU for local display and control of process parameters.
Complete cabling for all equipments at pumphouse
Control panel with IP 54 protection, industrial grade for all equipment (Separate for control (24V) and power equipment).
CE/UL certified hydrostatic type subsoil water level treansmitter for tubewell
CE/UL Certified Pressure Transmiter .
SITC of Automatic chlorination system SCADA Compatable chlorinating system.
Installation, commissioing & testing for one tubewell
Trial Run for 3 month period for one tubewell
Pumping plant and Other instrumentation work
SITC of 1200 LPM, 63 m head 30 H.P. submersible pump set with 24 meter 150mm dia column pipe assembly, NRV, CI D/F Bend 90°, CI A/F Tee, D/F pipe (1.5m long 2 Nos and 1.0m long 1 No), Earthing, Painting Toolset, Power wiring of pump house internal and external, Chainpully block, and all Pumping plant accessories with nut bolts and rubber packing etc. Rates of items required for SCADA Automation of pumping plant are not included in these rates.
SITC of Automatic chlorination system SCADA Compatable chlorinating system.
Misc item such as protection ring, MCCB, Transformer oil, electric resistance, rubber sheet, 25 sqmm ormad cable. Etc.
150mm Dia 3M long heavy duty column pipe same as above (Extra/Spare)
Supply & Erection of Servo Stabilizer of 50 KVA
CE / UL certified Intelligent smart energy meter
Motor Operated Actuator with Sluice Valve (150mm)
CE / UL certified Electromagnetic flowmeter of size:150mm
Soft Starter with Rs485 port-400 Class.
Auto phase reversal unit with inbuilt time delay & enclousre (confirm to IEC: 60947-1 & IEC: 60947-b-1)
CE / UL certified Hydrostatatic type sub soil water level transmitter
CE / UL certified Pressure Transmitter
SCADA AUTOMATION of New Tubewell
CE & UL Certified PLC/RTU in IP 65 enclosure suitable to Communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & fetures as specified for each tubewell/OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations as specified also enabled with UPS for power backup upto 2Hrs & automatic on/off switching arrangement.
G.S.M/G.P.R.S based wireless communication 4G Modem for RTU/PLC Capable to transfer & gather data from remote sites to control stations all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender technical specification.
CE/UL Certified Surge protector for control panel
CE/UL certified 7" HMI touch screen suitable to communicate with PLC/RTU for local display and control of process parameters.
Complete cabling for all equipments at pumphouse
Control panel with IP 54 protection, industrial grade for all equipment (Separate for control (24V) and power equipment).
Installation, commissioing & testing for one tubewell
Trial Run for 3 month period for one tubewell
Instrumentaion of OHT DMA-1,2,3 & 4
CE/UL Certified Radar type level Transmitter for OHT
Flow control Valve 200 mm size
Sluice valve 200mm Size
Electromagnetic Flowmeter of 200mm Size
CE / UL certified Pressure Transmitter
Residual chlorine analyzer with following description:- i- Chlorine Measuring sensor (Chlorine analyzer) for free chlorine membrane covered sensor 0.01…2mg/l; low pH dependency. ii- Single parameter system ready to operate to measure free or total chlorine iii- Connection cable 2 m, 2-wire, 2 x stripped ends, tinned iv- Battery and other accessories for power back for continous operation.
3 months Trial and Run
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.39 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BidDocumentGorakhpurNNcompressed.pdf
Tender Documents • 22.42 MB
BOQ_2084146.xls
BOQ • 0.98 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .