Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.5 L
EMD Value
₹7,410
Closing Date
24 Apr 2026, 6:00 pmClosed
OFFICE OF THE EXECUTIVE ENGINEER REW ANANTNAG
OFFICE OF THE EXECUTIVE ENGINEER REW ANANTNAG
C/O DRAIN FROM ALI MOHD KHANDAY TO HO FAYAZ AHMAD RATHER NEAR GRAVEYARD BLOCK SHAHABAD
2026_RDPR_308119_7
ENIT03of2026-27
Open Tender
Civil Works
Percentage
30 days
ANANTNAG
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
OFFICE OF THE EXECUTIVE ENGINEER REW ANANTNAG
₹7,410
25 Apr 2026
18 Apr 2026
25 Apr 2026
18 Apr 2026
24 Apr 2026
18 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | site clearance by way of engagement of labours,cutting of bushes, etc | - | no | - | - |
| 0.0 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 1 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | - | Cum | - | - |
| 0.0 | P/L of stone soling in bed tightly hand packed inld. Carriage | - | Cum | 1 | - |
| 0.0 | P/L in position C.C of specified grade excluding the cost of centring and shuttering 1: 3: 6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size). | - | Cum | 1 | - |
| 0.0 | P/L OF PLUMS | - | Cum | 1 | - |
| 0.0 | P/F Centring and shuttering including strutting, propping etc. and removal of formwork complete job(using ordinary timber planks of wood) | - | Sqm | - | - |
| 0.0 | p/l plastering cement motar 1:6 | - | sqm | - | - |
| 0.0 | carriage of material by MT sand& aggregates)by mt 15km | 1 | Cum | - | - |
| 0.0 | stone solling by mt 5 km | - | Cum | 1 | - |
| 0.0 | Provision for signboard & photographs | - | L/S | - | - |
stage.html
html • 0.04 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
BOQ_998885.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .