| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.0 CrAdmitted-Finance | -4.58% | ₹1.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 Cr+₹28.4 L (27.0%)Admitted-Finance | +21.21% | ₹1.3 Cr+₹28.4 L (27.0%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical DISQUALIFIED |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical DISQUALIFIED |
| 5 | Rejected-Technical B 1250 GALI NO 3 NEAR TINU PUBLIC SCHOOL SANGAM VIHAR SOUTH DELHI NEW DELHI 110080 | SOUTH DELHI | DELHI | 110080 | - | - | - | Rejected-Technical DISQUALIFIED |
Tender Value
₹1.1 Cr
EMD Value
₹2.2 L
Closing Date
21 May 2026, 3:00 pmClosed
EE DPD-1 DDA OFFICE CENTRAL NURSERY SEC-5 DWARKA
EE DPD-1 DDA OFFICE CENTRAL NURSERY SEC-5 DWARKA
Rejuvenation (1st Stage) of 2 nos of water bodies having Kh No 83 and 82 of Urbanized village Bakkarwala under jurisdiction of DPD-1, Dwarka Zone
2026_DDA_908820_1
03/EE/DPD-I/DDA/2026-27
Open Tender
Civil Works
Works
90 days
EE DPD-1 DDA OFFICE CENTRAL NURSERY SEC-5 DWARKA
Please refer Tender documents.
11 documents required · 11 mandatory
₹0
₹2.2 L
6 Jun 2026
15 May 2026
22 May 2026
15 May 2026
21 May 2026
15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Deployment of Poclain having boom length 17m to 32m including operation on hourly basis for excavation from the bed of the drain including in or under water or liquid mud including surfacing, levelling, dressing of the excavated surface and disposal of excavated material on outer periphery of banks or as per direction of Engineer-in-charge complete. The rates are inclusive of initial and final shifting of machine, shifting during work at site, cost or diesel, operator, all machine parts oil, lube etc. all complete. | 1,160 | per hr | 2,787.6 | ₹32,33,616 |
| 2 | Temporary installation of diesel pump(s) set(s) having cumulative capacity of 64KL/H as per requirement and as per direction of Engineer-in-charge for dewatering of water body complete in all respect with cost of services of operating staff, Cost of lubricating oil, diesel, other consumables for running the machinery and disposal of water up to surface drain. | 413 | per hr | 2,262.5 | ₹9,34,412.5 |
| 3 | Brick work with common burnt clay F.P.S. (non-modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) | 40 | cum | 7,370.65 | ₹2,94,826 |
| 4 | 12 mm cement plaster of mix: 1:4 (1 cement: 4 coarse sand) | 173 | Sqm | 357.35 | ₹61,821.55 |
| 5 | 15 mm cement plaster on rough side of single or half brick wall of mix: 1:4 (1 cement: 4 coarse sand) | 173 | Sqm | 411.75 | ₹71,232.75 |
| 6 | Finishing walls with water proofing cement paint of required shade: New work (Two or more coats applied @ 3.84 kg/10 sqm). | 347 | Sqm | 116.9 | ₹40,564.3 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 2 | cum | 9,045.75 | ₹18,091.5 |
| 8 | Deploying the hydraulic excavator /JCB for collecting the malba, waste material of all kinds including malba, building rubbish silt,etc and levelling the ground including the cost of services of operating staff, Cost of lubricating oil, diesel , other consumables for running the machinery etc. complete in all respect as per direction of Engineer-in-charge. | 160 | hrs | 1,382.15 | ₹2,21,144 |
| 9 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materialsby mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | 24,359 | Cum | 263.95 | ₹64,29,558.05 |
| 10 | Amount after GST factor @0.973 = 11000026.00 Note:
1.The contractor shall deploy sufficient nos. of machineryi.e JCB , Poclain , Pump etc along with sufficient manpower for timely execution of workas per direction of Engineer-in Charge. Any deficiency in deployment affecting progress of work shall be viewed seriously | - | RS | 3,05,242 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.97 MB
nit03.pdf
Tender Documents • 1.43 MB
BOQ_955192.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .