Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 LAccepted-AOC 16 SOUTH PURBACHAL HOSPITAL ROAD HALTU SAPUIPARA KOLKATA WEST BENGAL 700078 | KOLKATA | WEST BENGAL | 700078 | L1 | Accepted-AOC TC Recommendation | |
| 2 | L2₹3.8 L+₹8,944.40 (2.42%)Rejected-Finance KUMARDIHI PANDEESHWAR BARDDHAMAN BARDDHAMAN 713363 WEST BENGAL INDIA | BARDDHAMAN | BARDDHAMAN | WEST BENGAL | 713363 | L2 | Rejected-Finance TC Recommendation |
Tender Value
₹3.7 L
EMD Value
₹4,700
Closing Date
22 Oct 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
General Manager
Office of The General Manager Bankola Area, PIN-713363
Installation of 2 nos of new guide rope of 32 mm of lengh 120 mtr in place of old guide rope at 4 no pit south side in kumardihi A Colliery under Bankola Area.
2024_ECL_318897_1
ECL/GM/BA/E TENDER/24-25/EnM/192 Dt 08.10.2024
Open Tender
Electrical and Maintenance Works
Item Rate
25 days
Kumardihi A Colliery
Please refer to NIT document
4 documents required · 4 mandatory
₹4,700
11 Jan 2025
8 Oct 2024
23 Oct 2024
8 Oct 2024
22 Oct 2024
8 Oct 2024
8 Oct 2024 - 12 Oct 2024
Amount
Item Description/ Heading
Collection of 2 nos of guide rope from area store loading on truck and unloading at colliery store
Collection of Winch, Flexible Rope, and Installation of Winch at earth by soil cutting and placing and fixing and laying of new Guide rope at surface
dismentaling of WOODs at pit bottom for sump cleaning and then sump cleaning and water dewatering continiously through out the work
Dismentaling of bolt at head gear top, dismentaling of Old Guide Rope and Lowering the same in UG and placing for guide rope
New Guide Rope lowering and placing at shah and then clamping of rope at pit bottom and fixing at head gear top
1- bolt fitting at bottom and clamping with guide rope, tensioning at head gear bolt. And refitting the cage. Refitting of wooden plank and adjustment with cage.
Total impact of GST for the purpose of CTC
GOUTAM MUKHERJEE
techsummary_330549.pdf
PDF • 2.16 MB
finsummary_330549.pdf
PDF • 2.16 MB
WOENM192.pdf
PDF • 1.96 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .