Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.5 LAccepted-AOC | 1 | Accepted-AOC Below Estimate | |
| 2 | 2₹2.5 L+₹337 (0.14%)Rejected-AOC | 2 | Rejected-AOC Above Estimate |
| Sl No | Description | Qty | Unit | K RAMACHANDRAN L2 | JR CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. complying with std. specifications.SS 20 B | 9 | m3 | 3,150 ₹3,150 | 3,105 ₹3,105 Lowest |
| 2.00 | Centering charges for PCC work including cost and labour charges etc., complete as per standard specification. | 40.5 | m2 | 31,185 ₹31,185 | 31,104 ₹31,104 Lowest |
| 3.00 | PCC 1:3:6 mix using 40mm metal including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing laying and curing etc., complete complying with standard specification. | 18.5 | m3 | 1,61,135 ₹1,61,135 | 1,61,098 ₹1,61,098 Lowest |
| 4.00 | Plain Cement Concrete 1:2:4 Mix (one part cement, two part sand and four part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications. | 2 | m3 | 18,730 ₹18,730 | 18,726 ₹18,726 Lowest |
| 5.00 | Plastering in 1:5 mix to 12mm thick including cost and conveyance of all materials to work site and labour charges for mixing, laying, consolidating and curing etc., complete complying with standard specification.TNDSS No: 56, 57 | 85 | m2 | 33,575 ₹33,575 | 33,405 ₹33,405 Lowest |
Tender Value
₹3 L
EMD Value
₹3,000
Closing Date
16 Dec 2025, 3:00 pmClosed
EXECUTIVE OFFICER
HULICAL TOWN PANCHAYAT
Construction of Drain at 9th ward melbharathinagar Anandharaj house to Main Road (GF 25-26)
2025_DTP_632159_1
65/2025-2
Open Tender
Civil Works
Works
180 days
HULICAL TOWN PANCHAYAT
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3,000
8 Mar 2026
15 Dec 2025
16 Dec 2025
15 Dec 2025
16 Dec 2025
15 Dec 2025
15 Dec 2025 - 16 Dec 2025
Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. complying with std. specifications.SS 20 B
Centering charges for PCC work including cost and labour charges etc., complete as per standard specification.
PCC 1:3:6 mix using 40mm metal including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing laying and curing etc., complete complying with standard specification.
Plain Cement Concrete 1:2:4 Mix (one part cement, two part sand and four part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications.
Plastering in 1:5 mix to 12mm thick including cost and conveyance of all materials to work site and labour charges for mixing, laying, consolidating and curing etc., complete complying with standard specification.TNDSS No: 56, 57
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
BOQ_756326.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .