Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC | ₹1.3 Cr | L1 | Accepted-AOC work order |
| 2 | L2₹1.4 Cr+₹2.6 L (1.92%)Rejected-Finance | ₹1.4 Cr+₹2.6 L (1.92%) | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | VIHAAN CONSTRUCTIONS L2 | S.RAVI CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00Name of the work : 1. Strengthening the Road from RDC Kannivadi Road to Melapatti KM 0/0 2/480 (R-41) Estimate Amounts :14260000/- | |||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 2,288.52 | Sqm | 9 ₹20,596.68 | 6 ₹13,731.12 Lowest |
| 3.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 1,525.68 | cum | 160 ₹2,44,108.8 | 140 ₹2,13,595.2 Lowest |
| 4.00 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m | 3,090.87 | Sqm | 29 ₹89,635.23 | 23 ₹71,090.01 Lowest |
| 5.00 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | 718.09 | cum | 355 ₹2,54,921.95 | 341 ₹2,44,868.69 Lowest |
| 6.00Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5 | |||||
| 7.00 | KM 0/0 - 1/0 | 466.69 | cum | 2,500 ₹11,66,725 | 2,476 ₹11,55,524.44 Lowest |
| 8.00 | KM 1/0 - 2/0 | 467.39 | cum | 2,500 ₹11,68,475 | 2,476 ₹11,57,257.64 Lowest |
| 9.00 | KM 2/0 - 2/480 | 225 | cum | 2,500 ₹5,62,500 | 2,476 ₹5,57,100 Lowest |
| 10.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 9,272.62 | Sqm | 90 ₹8,34,535.8 | 85.5 ₹7,92,809.01 Lowest |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
25 Sept 2025, 3:00 pmClosed
The Project Director,DRDA,Dindigul
The Project Director,DRDA,Dindigul
Capital Grant Fund Savings and Interest Scheme 2025- 2026 in Reddiyarchatram block 1 no of Dindigul District TN05-73
2025_RDTN_601624_1
DIPR NO.4925-Tender-2025
Open Tender
Civil Works
Item Wise
180 days
DRDA
Capital Grant Fund Savings and Interest Scheme 2025- 2026 in Reddiyarchatram block
1 no of Dindigul District TN05-73
3 documents required · 3 mandatory
₹0
₹1.4 L
DRDA,DINDIGUL
14 Nov 2025
9 Sept 2025
25 Sept 2025
9 Sept 2025
25 Sept 2025
9 Sept 2025
19 Sept 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .