| 1.00Construction of School Toilet @ Itchikottai PUES in Madhagam Panchayat | |||||
| 2.00 | Earth work excavation and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 4.95 | Cum | 250 ₹1,237.5 | 246.5 ₹1,220.18 Lowest |
| 3.00 | Collection and supply of M.Sand and filling conveyance to the siteand all labour charges for filling as per standard speecifications | 0.6 | Cum | 1,350 ₹810 | 1,346 ₹807.6 Lowest |
| 4.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 0.77 | Cum | 5,105 ₹3,930.85 | 5,101.4 ₹3,928.08 Lowest |
| 5.00 | Brick work in cement mortar 1:5 mix using country bricks 83/4"x43/8"x23/4"and conveyance of all materials to site and all labour charges etc complete | 5.94 | Cum | 5,820 ₹34,570.8 | 5,818.9 ₹34,564.27 Lowest |
| 6.00 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for RCC column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc., complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete | 2.47 | Sqm | 1,050 ₹2,593.5 | 1,033 ₹2,551.51 Lowest |
| 7.00 | Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works | 11.18 | Kg | 92 ₹1,028.56 | 90 ₹1,006.2 Lowest |
| 8.00 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete | 0.2 | Cum | 8,550 ₹1,710 | 8,546.1 ₹1,709.22 Lowest |
| 9.00 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc | 47.66 | Sqm | 255 ₹12,153.3 | 251.5 ₹11,986.49 Lowest |
| 10.00 | Supplying and Fixing of creamic Tiles including cost and conveyance of all materials to site and all labour charges etc., complete | 9.47 | Sqm | 1,025 ₹9,706.75 | 1,023.5 ₹9,692.55 Lowest |
Tender Value
₹1.3 L
EMD Value
₹1,310
Closing Date
30 Jun 2026, 3:00 pmClosed
Bdo,Arimalam
Pt.Union Office Arimalam
Construction of School Toilet at Itchikottai PUES in Madhagam Panchayat
2026_RDTN_681453_1
1248/2025/A7/Work--1
Open Tender
Civil Works
Item Rate
Arimalam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹1,310
Yes
27 Jul 2026
17 Jun 2026
30 Jun 2026
17 Jun 2026
30 Jun 2026
17 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of School Toilet @ Itchikottai PUES in Madhagam Panchayat | - | - | - | - |
| 2 | Earth work excavation and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 4.95 | Cum | - | - |
| 3 | Collection and supply of M.Sand and filling conveyance to the siteand all labour charges for filling as per standard speecifications | 0.6 | Cum | - | - |
| 4 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 0.77 | Cum | - | - |
| 5 | Brick work in cement mortar 1:5 mix using country bricks 83/4"x43/8"x23/4"and conveyance of all materials to site and all labour charges etc complete | 5.94 | Cum | - | - |
| 6 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for RCC column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc., complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete | 2.47 | Sqm | - | - |
| 7 | Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works | 11.18 | Kg | - | - |
| 8 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete | 0.2 | Cum | - | - |
| 9 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc | 47.66 | Sqm | - | - |
| 10 | Supplying and Fixing of creamic Tiles including cost and conveyance of all materials to site and all labour charges etc., complete | 9.47 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
BOQ_818957.xls
BOQ • 0.51 MB
Arm_doc.pdf
Tender Documents • 0.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .