| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹29,218.50Accepted-Finance | ₹29,218.50 | 1 | Accepted-Finance L1 |
| 2 | 2₹29,855.70+₹637.20 (2.18%)Accepted-Finance | ₹29,855.70+₹637.20 (2.18%) | 2 | Accepted-Finance L2 |
| 3 | 3₹1.2 L+₹93,555.50 (320.2%)Accepted-Finance | ₹1.2 L+₹93,555.50 (320.2%) | 3 | Accepted-Finance L3 |
| 4 | 4₹2.0 L+₹1.7 L (583.3%)Accepted-Finance SHAKTI NAGAR KISHTWAR KISHTWAR JAMMU KASHMIR 182204 | KISHTWAR | JAMMU AND KASHMIR | 182204 | ₹2.0 L+₹1.7 L (583.3%) | 4 | Accepted-Finance L4 |
| 5 | 5₹4.1 L+₹3.8 L (1299.7%)Accepted-Finance | ₹4.1 L+₹3.8 L (1299.7%) | 5 | Accepted-Finance L5 |
Tender Value
Refer Docs
EMD Value
₹1.6 L
Closing Date
16 Apr 2021, 4:00 pmClosed
EX ENGINEER ED KISHTWAR
EX ENGINEER ED KISHTWAR
pl refer tender document
2021_PDD_121763_1
ENIT NO. 31 OF 2021
Open Tender
Electrical Works
Item Rate
365 days
DODA / KISHTWAR
pl refer SBD
3 documents required · 3 mandatory
₹1,000
EX ENGINEER ED KISHTWAR
₹1.6 L
Yes
2 May 2021
5 Apr 2021
17 Apr 2021
5 Apr 2021
16 Apr 2021
5 Apr 2021
5 Apr 2021 - 16 Apr 2021
Amount
Unloading of ST pole13 Mtr long
Average carriage of ST Pole13 Mtr long upto 100 Mtr
Average carriage of ST Pole 13 Mtr long upto 100 - 200 Mtr
Erection of ST Pole 13 Mtr long
Unloading of ST Pole11 Mtr long
Average carriage of ST pole 11 Mtr long upto 100 Mtr
Average carriage of ST pole11 Mtr long upto 100 - 200 Mtr
Erection of ST 11 Mtr Pole
Unloading of ST pole 9 Mtr long
Average carriage of ST pole 9 Mtr long upto 100 Mtr
Average carriage of ST Pole 9 Mtr long upto 100 - 200 Mtr
Erection of ST 9 Mtr Pole
Unloading of ST Pole 8 Mtr long
Average carriage of ST pole 8 Mtr long upto 100 Mtr
Average carriage of ST pole 8 Mtr long upto 100 - 200 Mtr
Erection of ST 8 Mtr Pole
Cement Bottoming in 1:2:4 ratio of ST Poles of all sizes (Material for Cement Bottoming is to be provided by Department)
Cement Bottoming in 1:2:4 ratio of ST Poles of all sizes (Material for Cement Bottoming is to be provided by contractor)
Branch Cutting of HT/LT lines
Unloading of Line Materials such as ACSR conductor,nut and bolts,C.I/M,S chennels, HT/LT cables ,link/DO/GO/HG sets etc…etc
Average carriage of Line Material upto 100 Mtr
Average carriage of Line material upto 100 - 200 Mtr
Fixing of C.I/M S Channels 8/ 9 /10 feet long with nut and bolts
Fixing of C.I/M S Channels 4/5/6/7 feet long along with Braces and nut and bolts
Fixing of C.I/M S Angle Iron 8/9/10 feet long with nut and bolts
Fixing of C.I/M S Angle Iron 3/4/5 feet long with nut and bolts
Installation of Link/DO/HG/Knife/LA Set
Insatalltion of GO Set
Fixing/Installation of 11 KV Pin Insulators with Pins
Fixing/Installation of 11 KV Disc Insulators with fittings
Unloading of CT/PT Unit
Average carriage of CT/PT Unit upto 100 Mtr
Average carriage of CT/PT upto 100 - 200 Mtr
Erection of CT/PT Unit along with Trivector Meter
Erection of CTPT Unit
loading of 25/63/100KVA Transformer (New/Repair)
Unloading of 25/63/100KVA Transformer (New/Repair)
Average carriage of 25/63/100 KVA upto 100 Mtr
Average carriage of 25/63/100 KVA 100 - 200 Mtr
Mounting of 25/63/100 KVA Transformer
Loading of 250/400/500/630 KVA Transformer
Unloading of 250/400/500/630 KVA Transformer
Average carriage of 250/400/500/630 KVA upto 100 Mtr
Average carriage of 250/400/500/630 KVA 100 - 200 Mtr
Mounting of 250/400/500/630 KVA Transformer
Fixing of 11 KV Jumpers
Painting of Substation Structure with allied iron accessories
Fixing of LT Circuit Component of Substation (LT cables,Thimbles,Busbar,Shackle insulators) with Fuse Set / MCCB with Box
Earthing of Substation complete (Poles,Transformer,CT/PT,LA)
Testing and commissioning of CT/PT Unit
Testing and commissioning of Substation
Laying of ACSR Conductor on Ground 20/30 mmsq
Laying of ACSR Conductor on Ground 50/100 mmsq
Stringing of ACSR Conductor 20/30mmsq/Squirell /Weasel
Stringing of ACSR Conductor 50/100 mmsq/Rabbit/Dog
Erection of Guys in HT/LT Line
Fixing of U-Clamps and Shackle Insulators with nut and bolts
Fixing of Suspension/Anchoring Clamps
Laying of HT AB/XLPE Cable 25/35/50 mmsq
Laying of HT AB/XLPE Cable 70/95/120 mmsq
Laying of HT AB/XLPE Cable 150/185mmsq
Laying of HT AB/XLPE Cable 240/300 mmsq
Laying of LT AB/XLPE Cable 25/35/50 mmsq
Laying of LT AB/XLPE Cable 70/95/120 mmsq
Laying of LT AB/XLPE Cable 150/185mmsq
Laying of LT AB/XLPE Cable 240/300 mmsq
Dismantling of old HT AB/XLPE Cable 25/35/50 mmsq
Dismantling of old HT AB/XLPE Cable 70/95/120 mmsq
Dismantling and carriage to stores HT AB/XLPE Cable 150/185mmsq
Dismantling of old HT AB/XLPE Cable 240/300 mmsq
Dismantling of old LT AB/XLPE Cable 25/35/50 mmsq
Dismantling of old LT AB/XLPE Cable 70/95/120 mmsq
Dismantling of old LT AB/XLPE Cable 150/185mmsq
Dismantling of old LT AB/XLPE Cable 240/300 mmsq
Fixing of Heat Shrinkable Outdoor Kit for AB/XLPE cables of HT/LT Lines
Fixing of Mid Span Straight Jointer Kit for AB/XLPE cables of HT/LT Lines
Dismantling of old LT AB/XLPE Cable 240/300 mmsq
Testing and commissioning of AB/XLPE cables of HT/LT Lines
Inspection of AB/XLPE cables of HT/LT Lines
Dismantling of Old Squirell ACSR Conductor
Dismantling of Old Weasel ACSR Conductor
Dismantling of Old Rabbit ACSR Conductor
Dismantling of Old Dog ACSR Conductor
Dismantling of Pin/ Disc/Shackle Insulators
Dismantling of old M S Channels 8/9/10 feet long
Dismantling of old MS Channels 4/5/6/7 feet long along with Braces
Dismantling of old M S Angle Iron 8/9/10 feet long
Dismantling of old MS Angle Iron 4/5/6 /7 feet long
Dismantling of old Link/DO/HG/Knife/LA Set
Dismantling of old GO Set
Dismantling of old 11KV Jumper
Dismantling of damaged LT Circuit Component of Substation (LT cables,Thimbles,Busbar,Shackle insulators) with Fuse Set / MCCB with Box
Un-mounting of 25/63/100 KVA Transformer
Un-mounting of 250/400/500/630 KVA Transformer
Dismantling of existing PCC Pole 9 Mtr Long
Dismantling of existing PCC Pole 8 Mtr Long
Dismantling of existing ST Pole 13 Mtr Long
Dismantling of existing ST Pole 11 Mtr Long
Dismantling of existing ST Pole 9 Mtr Long
Dismantling of existing ST Pole 8 Mtr Long
Construction of Cemented Platform (8x8x6 feet) for 630/400 KVA Substation along with Mesh Fencing of 6 feet height( If Material to be provided by department for this item)
Construction of Cemented Platform (8x8x6 feet) for 630/400 KVA Substation along with Mesh Fencing of 6 feet height( If Material to be provided by Contractor for this item)
Carriage of T and P items
Watch and Ward of Material
Fixing of Single/Three Phase Meters along with Service Line
Erection of DB/Meter Box on PCC/ST Poles
Write back of Dismantled Material such as ACSR conductor , C.I/M,S chennels, HT/LT cables ,link/DO/GO/HG sets etc…etc to Divisional Store Zelna Kishtwar
Re- Erection of Uprooted ST poles Poles 8/9/11/13 mtrs long
Tightening of loose conductor sq/weasel/Dog
Route clearance for making path
Survey of Route Alignment for new lines (HT/LT)
Guard Netting in HT lines
Iron work such as fabrication of steel work
Drilling of Holes
Erection/installation of MCCB Complete job
M/S CLEAR LINE ENGINEERS CONTRACTOR
N.K SHARMA
DEV ENGINEERS
M/S RATHER CONSTRUCTIONS AND TRADERS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .