Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹40.1 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹40.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹40.1 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹40.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L1₹40.1 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹40.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L1₹40.1 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹40.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L1₹40.1 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹40.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹40.1 L
EMD Value
₹40,106
Closing Date
24 Aug 2026, 5:00 pmClosed
SERWD Kamakhyanagar
SERWD Kamakhyanagar
Construction of Academic Building at Kamakhyanagar college for the year 2025-26
2026_CERWI_139020_1
KNR-14/2026-27
Open Tender
Civil Works - Buildings
Percentage
180 days
Kamakhyanagar
2 documents required · 2 mandatory
₹6,000
₹40,106
Yes
25 Aug 2026
17 Aug 2026
25 Aug 2026
17 Aug 2026
24 Aug 2026
17 Aug 2026
17 Aug 2026 - 22 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Brick work with Flyash bricks 25cm x 12cm x 8cm size having crushing strength not less than 75Kg/cm2 with dimensional tolerance ±8 percent in cement mortar (1:6) in Superstructure including cost, conveyance and royality and as per the direction of the Engineer-in-charge. | 72.08 | cum | 6,001.89 | ₹4,32,616.23 |
| 2 | Cement Concrete (1:2:4) using 12mm size B.H.G.C.B. chips including cost, conveyance and royality and as per the direction of the Engineer-in-charge. | 0.28 | cum | 8,666.44 | ₹2,426.6 |
| 3 | R.C.C-M-25 using 20mm and down graded chips laying & lowering concrete watering curing etc complete including cost of Steel Centering and Shuttering including cost, conveyance and royality and as per the direction of the Engineer-in-charge.(a)Lintel | 4.1 | cum | 13,642.63 | ₹55,934.78 |
| 4 | (b)Column superstructure | 7.53 | cum | 17,879.48 | ₹1,34,632.48 |
| 5 | (C)Roof Beam | 15.47 | cum | 17,879.48 | ₹2,76,595.56 |
| 6 | (d) R.C.C. Chajja | 21 | sqm | 1,429.32 | ₹30,015.72 |
| 7 | (e) R.C.C. Roof slab | 62.26 | cum | 13,268.09 | ₹8,26,071.28 |
| 8 | Supplying ,fitting and placing uncoated HYSD bar reinforcement including cost, conveyance and royality and as per the direction of the Engineer-in-charge. | 82.71 | qtl | 10,035.51 | ₹8,30,037.03 |
| 9 | Providing,Fitting & Fixing of Vertified Tiles in Floors over 25mm thick cement plaster in Cement Mortar (1:1) including cost of Tiles, Labour, T&P all comp.(a) Vertified | 408.79 | sqm | 1,599.95 | ₹6,54,043.56 |
| 10 | (b)Dadoo | 29.63 | sqm | 1,355.23 | ₹40,155.46 |
stage.html
html • 0.08 MB
finance_606461.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.49 MB
Tendernotice_2.pdf
PDF • 3.77 MB
BOQ_606461.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .