| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.5 LAdmitted-Finance 174 BAKSARA L M C SARANI JAMRULTALA HOWRAH WEST BENGAL 711110 | HOWRAH | WEST BENGAL | 711110 | +0.00% | ₹2.5 L | L1 | Admitted-Finance |
| 2 | L2₹2.6 L+₹4,817.65 (1.90%)Admitted-Finance 2 523 GS COLONY GS COLONY WARD NO 13 NADIA WEST BENGAL 741250 | NADIA | WEST BENGAL | 741250 | +1.90% | ₹2.6 L+₹4,817.65 (1.90%) | L2 | Admitted-Finance |
| 3 | L3₹2.6 L+₹8,240.72 (3.25%)Admitted-Finance 2 PRIYA NATH GHOSH RD SANTOSHPUR CAL 75 | KOLKATA | WEST BENGAL | 700075 | +3.25% | ₹2.6 L+₹8,240.72 (3.25%) | L3 | Admitted-Finance |
Tender Value
₹2.5 L
EMD Value
₹5,100
Closing Date
12 Sept 2026, 1:00 pmClosed
OFFICE OF EE(CIVIL)
THE KOLKATA MUNICIPAL CORPORATION 97 AND 98 GARFA MAIN ROAD
MAINTENANCE OF BITUMINOUS ROAD NEAR PREM. NO- 818,196 ETC. MADURDAH IN WARD NO-108.
2026_KMC_1040091_1
KMC/EE(C)/BR-XII/108/26-27
Open Tender
CIVIL WORKS
Percentage
75 days
BOROUGH XII
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹5,100
17 Sept 2026
1 Sept 2026
14 Sept 2026
1 Sept 2026
12 Sept 2026
1 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour for picking up existing metalled road surface to a specified average depth, including screening and stacking the pavement materials. (b) For average depth above 40 mm but not exceeding 75 mm by manual means. (ii) Brick / Jhama metal surface. ( Ref :PWD (Rds & Brdgs)-2018, It. No. 18.01 Page No.331) | - | SQM | - | - |
| 2 | Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary. (a) Depth up to 150 mm. ( Ref :PWD (Rds & Brdgs)-2018, It. No. 3.16 Page No.240) | - | SQM | - | - |
| 3 | SECTION(B) - SANITARY AND DRAINAGE WORKS.(B)-(II) SOIL PIPE AND FITTINGS.(a) Original Works.(16.)Supplying, fitting and fixing with cement jointing (3:1) salt glazed stoneware pipe including excavation of earth upto 1.50 metre depth in all sorts of soil both mixed or unmixed and refilling (but excluding concreting at bottom and sides).(iii) 150 mm | - | MTR | - | - |
| 4 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. ( Ref :PWD (Bldg.)-2017, It. No. 1, Page No.14 & 3rd Corrigenda Addenda dtd-04.06.18,P-1) | - | SQM | - | - |
| 5 | Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation. (b) 1:4:8 proportion ( Ref :PWD (Bldg.)-2017, It. No. 1, Page No.23 & 3rd Corrigenda Addenda dtd-04.06.18, P-9 & 10) | - | M3 | - | - |
| 6 | Constructing catch pit to a depth of 1.0m (Insid(e) with 250mm th. 1st class Brick Work (1:4) in all sides over a layer of jhama brick soling & 100mm th. jhama cement concrete (1:4:8) including necessary earth work, providing approved type C.I. Syphone (150mm dia) with topping RCPC gully grid (5MT load bearing capacity) constructing invert with brick -on-edge, including 20mm th. inside cement plaster (1:4) finished with neat cement punning, at the top 100mm th. R.C.C. slab (1:1.5:3) with stone chips including necessary reinforcement, shuttering as per standard drawing and as directed by E-I-C complete in all respect and removal of surplus earth with all costs of labour and materials. Inside measurement of catch pit, 600mm X 525mm | - | EA | - | - |
| 7 | Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (ii) For Construction of Sub Base by consolidating Brick Bats / Laterite (90 mm to 45 mm) ( Ref :PWD (Rds & Brdgs)-2018, It. No. 4.10 (ii) Page No.247 & page-222 sl. No-5 (f)) | - | M3 | - | - |
| 8 | Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) For Construction of Sub Base by consolidating Jhama metal / Laterite (63 mm to 45 mm) (Moorum replaced with course sand) ( Ref :PWD (Rds & Brdgs)-2018, It. No. 4.10(i) Page No.247 & page-222 sl. No- 1 & 5 (e)) | 0.4 | M3 | 1 | ₹0.4 |
| 9 | Raising cover and frame of Special Inspection Pit with CBW (1:4), 250 mm thick up to 100mm high with 20mm thick sand and cement plaster (1:4) including finishing with neat cement after cutting the asphaltum pavement taking out and re-fixing the existing cover and frame with cement concrete (1:1.5:3) with stone chips all round the frame surface including removal of surplus spoils. ( Ref :Rate based on PWD Current SOR, PWD(R&B) 2018, p-233 (it -2.05), p-332(it-18.06), p-222 sl-5(a), p-332 (it -18.05)), pg-227, I-1.03, pg-230,Table-I , Table III-2 pg-226, PWD(B) 2017 , p-189 (it -1) and 3rd corria. & Adda., p-49&50, Date 04.06.2018, p-192 (it -15), p-26 (it -10(i)), consumption chart pg-B-60, sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 , p-191 (i -6) and 3rd Corr. & Adda, page-52, p-303, p-269 (it -1) and 1st Corria & Adda, Page-4, Date 08.01.2018, page-12 (item -13)) | - | EA | - | - |
| 10 | Raising cover and frame of Catch Pit with CBW (1:4), 250 mm thick up to 100mm high with 20mm thick sand and cement plaster (1:4) including finishing with neat cement after cutting the asphaltum pavement taking out and re-fixing the existing cover and frame with cement concrete (1:1.5:3) with stone chips all round the frame surface including removal of surplus spoils. ( Ref :Rate based on PWD Current SOR, PWD(R&B) 2018, p-233 (it -2.05), p-332(it-18.06), p-222 sl-5(a), p-332 (it -18.05)), pg-227, I-1.03, pg-230,Table-I , Table III-2 pg-226, PWD(B) 2017 , p-189 (it -1) and 3rd corria. & Adda., p-49&50, Date 04.06.2018, p-192 (it -15), p-26 (it -10(i)), consumption chart pg-B-60, sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 , p-191 (i -6) and 3rd Corr. & Adda, page-52, p-303, p-269 (it -1) and 1st Corria & Adda, Page-4, Date 08.01.2018, page-12 (item -13)) | - | EA | 1 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.45 MB
FORM-108_04.pdf
Tender Documents • 0.58 MB
BOQ_2554193.xls
BOQ • 0.29 MB
PREQUE.pdf
Additional Documents • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .