Loading…
Loading…
Tender ID
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹8.7 LAccepted-AOC ADD 627 BAKSHI KHURD DARAGANJ TEHSIL SADAR PRAYAGRAJ | PRAYAGRAJ | PRAYAGRAJ | UTTAR PRADESH | L-1 | Accepted-AOC 872521.223 | |
| 2 | L-2₹8.9 L+₹21,609.59 (2.48%)Rejected-Finance KANPUR | GORAKHPUR | UTTAR PRADESH | 273413 | L-2 | Rejected-Finance L-2 | |
| 3 | L-3₹9.0 L+₹27,125.01 (3.11%)Rejected-Finance 12 30 126 A CHAMANLAL KI KUAN | L-3 | Rejected-Finance L-3 | |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance ARAJI NO 920 PLANT NO 5 PANKI ROAD KALYANPUR | KANPUR | KANPUR | UTTAR PRADESH | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹9.8 L
EMD Value
₹97,790
Closing Date
5 May 2026, 3:00 pmClosed
ce knn
ce knn moti jheel
Construction of approach road by CC for entry into various parts of the sports ground under Zone-6 Ward-40 Vishnupuri
2026_NNKAN_1145293_1
900/AA-6/2025-26
Open Tender
Civil Works
Percentage
45 days
kanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹97,790
22 Oct 2026
5 May 2026
5 May 2026
5 May 2026
5 May 2026
5 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantaling of old brick work in cement and c send mortor including stocking of materials as directed by Engineer-in-charge with in a distance of 60 mt. (200 feet) etc all comple | 16.87 | sqm | 580 | ₹9,784.6 |
| 2 | Earth work in surface excavation not exceeding 30cm in depth but exceeding 1.5m in with as well as 10 sqm on plan including getting out and disposal of excavated carth upto 50 m and lift 1.5 m,as directed by the Engineer i/c :2.1.1 all kinds of soil. O to .30m. | 75.46 | cum | 170 | ₹12,828.2 |
| 3 | Earth work in excavation by mechanical means hydraulic excavator in trenches for foundation pipe cable etc in ordinary soil (Loan clay or sand)including lift up to 1.5 m. lead up to 50m and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer i/c within a lead of 50m. | 29.04 | cum | 215 | ₹6,243.6 |
| 4 | Laying of base concrete 1:6:12 with cement C.Sand & 40mm Brick ballast including mat.Lab.T&P,etc all complete.) Providing and laying in cement concrete in 1:6:12 (1 cement: 6 fine sand: 12 graded brick aggregate 40 mm. nominal size) and curing complete, including cost of formwork in foundation and floors. | 3.62 | cum | 4,380 | ₹15,855.6 |
| 5 | Class-150 brick work in 1:4 cement & coarse sand mortar in foundation and plinth including supply of all materials, labour and tools and plants etc. required for proper completion of the work, etc all complete. | 5.58 | cum | 6,600 | ₹36,828 |
| 6 | R.C.C works with1:1.5:3 cement approved coarse sand and 2 cm (3/4") gauge approved stone ballast in the proportion 1:1.5:3 (1 cement:6 aggregate) in lintels of doors and windows excluding supply of reinforcement and its bending the same with 24 BWG binding wire and necessary centring and shuttering etc. and also including supply of all materials labours and tools and plants etc. required for proper completion of work. stone ballast but for slab including shuttering mat. Lab etc. All complete | 10.42 | cum | 8,600 | ₹89,612 |
| 7 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not include in overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authrized overlapping shall be measured up to floor two level(over all Rate) 12 mm to 32 mm. tor etc.all complete. | 9.82 | qtl | 7,200 | ₹70,704 |
| 8 | Centering and shuttering including strutting propping etc removal of from work for (upto 5th floor foundation footing base | 110.96 | sqm | 212 | ₹23,523.52 |
| 9 | construction of gsb granular sub base by providing well graded material spreding in uniform layers with mortar grader on prepared surface complete as per mort&h etc all complete | 50.3 | cum | 3,671 | ₹1,84,651.3 |
| 10 | providing laying in position ready mix coccrten (M-25) garde cement concrete for reinforced cement work ushinf cement contant disgin mix and manufact to side of work | 37.73 | cum | 8,020 | ₹3,02,594.6 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 14.60 MB
BOQ_2140676.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .