| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.6 LAccepted-AOC | L1 | Accepted-AOC ok | |
| 2 | L2₹31.8 L+₹1.2 L (3.83%)Rejected-AOC | L2 | Rejected-AOC Reject |
| Sl No | Description | Qty | Unit | B SUGUNA L2 | M/S. BKS INFRAS L1 |
|---|---|---|---|---|---|
| 1.001.CConstruction of drainage at Indira Gandhi nagar in Nadukuthagai Panchayat. | |||||
| 2.00 | Earth work excavasion in all soil includind all cost and conveancy charges | 366.5 | cum | 350 ₹1,28,275 | 263 ₹96,390 Lowest |
| 3.00 | Supplying and fixing of M sand including all cost of matrial and conveyance to site and labour charges for laying, watering and compacting etc. complete | 47 | cum | 2,150 ₹1,01,050 | 2,068 ₹97,196 Lowest |
| 4.00 | Cement Concrete 1:4:8 using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete | 58.48 | cum | 6,000 ₹3,50,880 | 5,809 ₹3,39,710 Lowest |
| 5.00 | Cement Concrete 1:2:4 using 20mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete | 11.48 | cum | 7,118 ₹81,715 Lowest | 7,118 ₹81,715 Lowest |
| 6.00 | Cement Concrete 1:3:6 using 20mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete | 120.66 | cum | 7,000 ₹8,44,620 | 6,566 ₹7,92,254 Lowest |
| 7.00 | Cost towards supply centering with planks including all cost and conveyance charges | 1,024 | sqm | 547 ₹5,60,128 Lowest | 547 ₹5,60,128 Lowest |
| 8.00 | Plastering in cement morter 1:4 20mm thick including cost and conveyance of all materials site and all labour charges etc. complete | 255 | sqm | 585.77 ₹1,49,371 Lowest | 585.77 ₹1,49,371 Lowest |
| 9.00 | Cost towards supply centering with planks including all cost and conveyance charges | 94.58 | sqm | 547.5 ₹51,783 Lowest | 547.5 ₹51,783 Lowest |
| 10.00 | Supply & fabrication of steel including cost and conveyance extra complete | 1.03 | MT | 91,969.9 ₹94,729 Lowest | 91,969.9 ₹94,729 Lowest |
Tender Value
₹31 L
EMD Value
₹31,000
Closing Date
13 Jan 2026, 3:00 pmClosed
Block development Office BP
Poonamallee union
Construction of Drainage at Indira Gandhi nagar in Nadukuthagai Panchayat
2026_RDTN_639070_1
surplus fund 25-26 pme-08
Open Tender
Civil Works
Works
Poonamallee
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹31,000
Block development Office BP
1 Feb 2026
5 Jan 2026
13 Jan 2026
5 Jan 2026
13 Jan 2026
5 Jan 2026
5 Jan 2026
1.CConstruction of drainage at Indira Gandhi nagar in Nadukuthagai Panchayat.
Earth work excavasion in all soil includind all cost and conveancy charges
Supplying and fixing of M sand including all cost of matrial and conveyance to site and labour charges for laying, watering and compacting etc. complete
Cement Concrete 1:4:8 using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete
Cement Concrete 1:2:4 using 20mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete
Cement Concrete 1:3:6 using 20mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete
Cost towards supply centering with planks including all cost and conveyance charges
Plastering in cement morter 1:4 20mm thick including cost and conveyance of all materials site and all labour charges etc. complete
Cost towards supply centering with planks including all cost and conveyance charges
Supply & fabrication of steel including cost and conveyance extra complete
RCC 1:1.5:3 mix 20mm metal including cost and conveyance etc. completed
Culvert 1no Sub estimate
Earth work excavasion in all soil includind all cost and conveancy charges
Supplying and fixing of M sand including all cost of matrial and conveyance to site and labour charges for laying, watering and compacting etc. complete
Cement Concrete 1:4:8 using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete
Cement Concrete 1:3:6 using 20mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete
Cost towards supply centering with planks including all cost and conveyance charges
Supply & fabrication of steel including cost and conveyance extra complete
RCC 1:1.5:3 mix 20mm metal including cost and conveyance etc. completed
Culvert 2no Sub estimate
Earth work excavasion in all soil includind all cost and conveancy charges
Supplying and fixing of M sand including all cost of matrial and conveyance to site and labour charges for laying, watering and compacting etc. complete
Cement Concrete 1:4:8 using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete
Cement Concrete 1:3:6 using 20mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete
Cost towards supply centering with planks including all cost and conveyance charges
Supply & fabrication of steel including cost and conveyance extra complete
RCC 1:1.5:3 mix 20mm metal including cost and conveyance etc. completed
Culvert main Sub estimate
Earth work excavasion in all soil includind all cost and conveancy charges
Supplying and fixing of M sand including all cost of matrial and conveyance to site and labour charges for laying, watering and compacting etc. complete
Cement Concrete 1:4:8 using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete
Cement Concrete 1:3:6 using 20mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete
Cost towards supply centering with planks including all cost and conveyance charges
Supply & fabrication of steel including cost and conveyance extra complete
RCC 1:1.5:3 mix 20mm metal including cost and conveyance etc. completed
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_764934.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
Tende.pdf
Tender Documents • 0.94 MB
BOQ_764934.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .