Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 LAccepted-AOC C 691 PATEL NAGAR RAJENDRA NAGAR BAREILLY | L1 | Accepted-AOC L1 | |
| 2 | L2₹8.6 L+₹8,573.76 (1.01%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹9.7 L+₹1.2 L (14.3%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | m/s mohd.sajid thekedar L3 | M/S TANISHAQ ENTERPRISES L2 | M/S OM BALA JEE CONSTRUCTION L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth Work in embankment with all lead and lift including excavation, loading, unloading, manual compaction, dressing and all lifts complete excluding royalty will be applicable from time to time on Govt. orders. | 698.1 | M3 | 174.96 ₹1,22,139.58 | 35 ₹24,433.5 Lowest | 40 ₹27,924 |
| 2.00 | Dismantling of damaged boulder pitching from u/s slope of dam incuding stacking complete. | 40.96 | M3 | 67.23 ₹2,753.74 | 33 ₹1,351.68 Lowest | 1,700 ₹69,632 |
| 3.00 | Providing / Laying R.B.M. in filter under boulder pitching with carriage charges up to site with loading unloading and stacking complete in all respect. | 102.39 | M3 | 1,774.71 ₹1,81,712.56 | 1,230 ₹1,25,939.7 Lowest | 1,700 ₹1,74,063 |
| 4.00 | Relaying Dry Boulder Pitching Hand packed with all labour T&P etc complete. | 40.96 | M3 | 127.98 ₹5,242.06 | 58 ₹2,375.68 Lowest | 400 ₹16,384 |
| 5.00 | Providing/Dumping/Laying Dry boulder pitching with 20-40 kg new boulder hand packed including cost of boulder its carriage upto site stacking charges etc. | 331.34 | M3 | 1,995.84 ₹6,61,301.63 | 2,130 ₹7,05,754.2 | 1,700 ₹5,63,278 Lowest |
Tender Value
₹12 L
EMD Value
₹24,000
Closing Date
9 Jun 2025, 3:00 pmClosed
Executive Engineer, I.D, Bareilly
Executive Engineer, I.D, 117 Canal Colony Bareilly U P.
Baigul Bandh Spaillway ki Left wing wal ke Country Side me Varsh ke karan katan se Chhatigrast Pitching ka Karya.
2025_UPIDC_1044960_1
01/EE/IDB/2025-26
Open Tender
Civil Works
Item Rate
30 days
Baigul Dam udham singh Nagar Uk
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹24,000
1 Nov 2025
3 Jun 2025
9 Jun 2025
3 Jun 2025
9 Jun 2025
3 Jun 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .