Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.7 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹9.0 L+₹26,415.22 (3.03%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹9.7 L+₹96,430.26 (11.1%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹9.7 L+₹1.0 L (11.6%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹9.9 L+₹1.2 L (13.9%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹9.8 L
EMD Value
₹19,620
Closing Date
11 Aug 2026, 4:00 pmClosed
XEN REW Kathua
XEN REW Kathua
Constt of Maltha Bridge and other allied works at pyt Dinga Amb B Block Dinga Amb
2026_RDPR_319578_1
e-NIT No.171/REW/K of 2026-27 Dated 05/08/2026 2nd call
Open Tender
Civil Works
Percentage
90 days
DINGA AMB
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹19,620
21 Aug 2026
5 Aug 2026
12 Aug 2026
5 Aug 2026
11 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering,
shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm
nominal size) | 14.73 | cum | 7,788.4 | ₹1,14,723.13 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 5.1 | cum | 5,733.6 | ₹29,241.36 |
| 3 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 839.42 | kg | 123.2 | ₹1,03,416.54 |
| 4 | Centering and shuttering incl. Propping and removal of same in Foundations, footings, bases of columns etc. for mass concrete. | 46.19 | sqm | 286.35 | ₹13,226.51 |
| 5 | Engaging Labour for Clearing Jungle including cutting of bushes, trees etc wherever required and making dowels into existing rock /foundation | 21 | days | 553 | ₹11,613 |
| 6 | Launching/Relaunching the Steel Footbridge including fabrication, transportaion, scaffolding, priming, painting, dewatering, placing and
testing & commissioning (ready to use)- cpmplete job as per existing design , & directions of engineer incharge: | 21.5 | m | 32,000 | ₹6,88,000 |
| 7 | Carriage of material (sand & aggregates) with in avg. Lead from source to site of work 15 km by MT & 100m by AT/HL | 26.76 | cum | 588.85 | ₹15,757.63 |
| 8 | Add Cost of Sign board in the shape of Inaguration plate cum pedestal as per direction of engineer incharge | 1 | No. | 6,000 | ₹6,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.97 MB
BOQ_1058979.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .