Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.7 CrAdmitted-Finance | -5.10% | ₹4.7 Cr | L1 | Admitted-Finance |
Tender Value
₹5 Cr
EMD Value
₹10 L
Closing Date
14 Aug 2026, 6:00 pmClosed
Commissioner
Municipal Council Tijara
Construction work of storm water drain Tijara.
2026_DLB_581509_1
nit_07
Open Tender
Civil Works
Percentage
365 days
tijara
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
Executive officer Municipal Board Tijara
₹10 L
Yes
19 Aug 2026
3 Aug 2026
15 Aug 2026
3 Aug 2026
14 Aug 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Storm Water Drain (1 meter wide ) | |||||
| 2 | Earth work for Sewer line and Manhole in excavation in foundation, trenches manholes, road side chambers etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level including allowances for any additional excavation beyond the drawings (measurement for payment to be as per standard drawings), re-handling of material/earth to complete the task. 17.1.1 In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil,kankar, etc. 17.1.1.1 Depth upto 1.5m | 1,500 | Cum | 299 | ₹4,48,500 |
| 3 | Providing and laying lean cement concrete 1:4:8 in Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in concrete mixer, laid manually, compacted with surface vibrator, finishing and curing complete as per clause 601, 112 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion | 225 | Cum | 2,955 | ₹6,64,875 |
| 4Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets etc. upto two stories, excluding the cost of centring, shuttering andfinishing : | |||||
| 51:1:2 (1 cement : 1 coarse sand : 2 graded stone aggregate 20 mm nominal size) (As per design mix) | |||||
| 5.1 | bottoms | 225 | cum | 6,890 | ₹15,50,250 |
| 5.2 | Wall | 405 | cum | 6,890 | ₹27,90,450 |
| 6Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for : | |||||
| 7 | Foundations, footings, bases of columns, etc. for mass concrete. | 450 | sqm | 236.5 | ₹1,06,425 |
| 8 | Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 4,500 | sqm | 367 | ₹16,51,500 |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.34 MB
BOQ_1033227.xls
BOQ • 0.39 MB
cor.pdf
PDF • 1.05 MB
corrigendum.pdf
PDF • 1.03 MB
corrigendum.pdf
PDF • 0.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .