Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAccepted-AOC 107 KRISHNA COLONY MALOUT DISTRICT SRI MUKTSAR SAHIB | MALOUT | SRI MUKTSAR SAHIB | ₹2.0 Cr | L1 | Accepted-AOC accepted |
| 2 | L2₹2.0 CrRejected-Finance N A | NA | NA | 121004 | ₹2.0 Cr | L2 | Rejected-Finance due to higher rate |
| Sl No | Description | Qty | Unit | Dinesh Kumar Garg Contractor L1 | BALRAJ SINGH CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork Undressed involving an avg. horizontal throw upto 2 mtr. and an avg. Vertical Lift upto 0.5 mtr. including Breaking of Clods | 1 | Cum | 718 ₹16.4 L | 718 ₹16.4 L |
| 2.00 | Dressing of New Earthwork | 1 | Sqm | 1,869 ₹10,784.13 | 1,589 ₹9,168.53 |
| 3.00 | Earthwork Undressed with combined Lead upto 15 mtr. including Breaking of clods. | 1 | Cum | 35 ₹2.4 L | 37 ₹2.6 L |
| 4.00 | Re-handling of earthwork recently executed | 1 | Cum | 142 ₹40.7 L | 147 ₹42.1 L |
| 5.00 | Dag belling single kassi stroke minimum 7.5 cm depth. | 1 | Km | 65 ₹8.8 L | 66 ₹8.9 L |
| 6.00 | Dressing of Bed and Preparation of Sub-grade for Lining | 1 | Sqm | 15 ₹2.0 L | 16 ₹2.2 L |
| 7.00 | Dismantling of Brick Work in Cement | 1 | Cum | 17 ₹2.3 L | 18 ₹2.4 L |
| 8.00 | First Class Burnt Brick laid in 1:6 Cement Sand Mortar for Bed & Side walls | 1 | Cum | 1 ₹42,039.43 | 1 ₹42,039.43 |
| 9.00 | 10 mm thick Cement Plaster 1:4 on Side Walls | 1 | Sqm | 5 ₹28,862.80 | 5 ₹28,862.80 |
| 10.00 | 10 mm thick Cement Plaster 1:4 on Floors | 1 | Sqm | 159 ₹3.3 L | 167 ₹3.5 L |
Updated dates
Tender Value
₹2.3 Cr
EMD Value
₹4.5 L
Closing Date
24 Feb 2026, 11:00 amClosed
Executive Engineer
Executive Engineer, Bathinda Canal and Ground Water Division, Bathinda.
Remodeling/Relining of Jangirana Disty RD 0-18934 off taking at RD 28350/L of Raika Feeder by concrete lining M-15 concrete mix,mixed in automatic batching and mixing plant, carried to site of work in transit of, laid manually with specified thicknes
2026_WR_158634_1
51/22A/2025-26
Open Tender
Civil Works - Canal
40 days
Bathinda
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹4.5 L
Bathinda
1 Jun 2026
26 Jan 2026
24 Feb 2026
26 Jan 2026
24 Feb 2026
26 Jan 2026
9 Feb 2026
DEPARTMENT OF WATER RESOURCES
Sr. No. Name of Firm / L&C Society
1 Name of Work Remodeling/Relining of Jangirana Disty RD 0-18934 off taking at RD 28350/L of Raika Feeder by concrete lining M-15 concrete mix, mixed in automatic batching and mixing plant, carried to site of work in transit mixers of laid with manually with specified thickness.
Name and Address of Contractor / L&C Society
Name and Address of Banker
Income Tax Return for any one of the last three years
Approximate value of work in hand
Bank solvency certificate
Certificate of "……." Class/Society registeredwith irrigation Deptt.
DEPARTMENT OF WATER RESOURCES
Name of the Contractor / L&C Society
Name of the Work Remodeling/Relining of Jangirana Disty RD 0-18934 off taking at RD 28350/L of Raika Feeder by concrete lining M-15 concrete mix, mixed in automatic batching and mixing plant, carried to site of work in transit mixers of laid with manually with specified thickness.
Please fill information about the each relevant work completed during the last Three years for works Costing more than Rs._________________
Name of Employer Location of work Value of work Period of executive Whether work completed in schedule/period Whether entered into litigation/ Arbitration Summary of litigation decision thereof Whether any pending
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority : EXECUTIVE ENGINEER, BATHINDA CANAL DIVISION, BATHINDA
Name of Work : Remodeling/Relining of Jangirana Disty RD 0-18934 off taking at RD 28350/L of Raika Feeder by concrete lining M-15 concrete mix, mixed in automatic batching and mixing plant, carried to site of work in transit mixers of, laid with manually with specified thickness.
Contract No : 51/22A/2025-26
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Item Description Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
Earthwork Undressed involving an avg. horizontal throw upto 2 mtr. and an avg. Vertical Lift upto 0.5 mtr. including Breaking of Clods 1 Cum Excess(+) Full Conversion INR
Dressing of New Earthwork 1 Sqm Excess(+) Full Conversion INR
Earthwork Undressed with combined Lead upto 15 mtr. including Breaking of clods. 1 Cum Excess(+) Full Conversion INR
Re-handling of earthwork recently executed 1 Cum Excess(+) Full Conversion INR
Dag belling single kassi stroke minimum 7.5 cm depth. 1 Km Excess(+) Full Conversion INR
Dressing of Bed and Preparation of Sub-grade for Lining 1 Sqm Excess(+) Full Conversion INR
Dismantling of Brick Work in Cement 1 Cum Excess(+) Full Conversion INR
First Class Burnt Brick laid in 1:6 Cement Sand Mortar for Bed & Side walls 1 Cum Excess(+) Full Conversion INR
10 mm thick Cement Plaster 1:4 on Side Walls 1 Sqm Excess(+) Full Conversion INR
10 mm thick Cement Plaster 1:4 on Floors 1 Sqm Excess(+) Full Conversion INR
Providing & Laying Dry Brick Bats 1 Cum Excess(+) Full Conversion INR
Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering) 1 Sqm Excess(+) Full Conversion INR
Cement concrete 1:2:4 With stone ballast or shingle mixing by manual means 1 Cum Excess(+) Full Conversion INR
Cold twisted detormed (Ribbed/ Tor steel) Bars (Fe 500 grade as per IS 1786-2008) , for R.C.C works, where not including in the complete rate of RCC including bending and binding placing in position complete 1 Qtl Excess(+) Full Conversion INR
Fixing of Shutter and Frames for Nakka and Branch Offtakes 1 No's Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.86 MB
TB01.xls
Additional Documents • 0.03 MB
BOQ_321667.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid