Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.5 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹10.6 L+₹2.0 L (23.8%)Admitted-Finance | L2 | Admitted-Finance |
Tender Value
₹10.8 L
EMD Value
₹21,580
Closing Date
13 Jun 2026, 6:55 pmClosed
Executive Engineer REW Division Poonch
Executive Engineer REW Division Poonch
Please refer to Boq
2026_RDPR_311795_2
e-NIT 02 of REW Poonch 2026-27 Date 08-06-2026
Open Tender
Civil Works
Percentage
30 days
Poonch
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer REW Division Poonch
₹21,580
18 Jun 2026
8 Jun 2026
15 Jun 2026
8 Jun 2026
13 Jun 2026
8 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 30.96 | CUM | 9,821.85 | ₹3,04,084.48 |
| 2 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | CUM | 9,395.7 | - |
| 3 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level | 4,715 | KG | 123.2 | ₹5,80,888 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for A-- Columns, pillars, piers, abutments, posts and struts. | 39.84 | SQM | 577.55 | ₹23,009.59 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for B-- Suspended floors, roofs, landings, balconies and access platforms. | 42 | SQM | 718.2 | ₹30,164.4 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for C-- EDGES | 17.45 | SQM | 1,145.1 | ₹19,982 |
| 7 | Carriage of Materials from source to Site Sand + Agg for 10 KM by MT | 56 | CUM | 279.04 | ₹15,626.24 |
| 8 | Add the Cost of CIB | 1 | NO | 1,000 | ₹1,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.18 MB
BOQ_1009422.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .