| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹6.9 L+₹1,959.14 (0.29%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | K SEKAR L2 | A.Vinayagam L1 |
|---|---|---|---|---|---|
| 1.00PROVIDING CC PAVEMENT AT ODDANARI VILLAGE H/O THAGARAKUPPAM PANCHAYAT IN SHOLINGHUR BLOCK RANIPET DISTRICT | |||||
| 2.00 | Earthwork excavation for foundation in all soilsand sub soils to full depth etc.,ordinary soil complete. | 21.6 | Sqm | 131.89 ₹2,848.82 Lowest | 131.89 ₹2,848.82 Lowest |
| 3.00 | Cement concrete 1:4:8 (one cement ,fourM.sand and eight hard broken stone jelly) using 40mm gauge hard broken granite stone jellyfor foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick,well rammed,consolidated and curing etc.complete complying with standard spceification | 48.6 | Sqm | 5,580.86 ₹2,71,229.8 | 5,550.8 ₹2,69,768.88 Lowest |
| 4.00 | Supplying and centreing for sides and soffits including necessary supports and struttering up to 3.29 M height for plane services as detailed below in all floors with all cross bracing using mild steel sheets of 90x60 cm and 10 BG stiffened with welded mild steel angle of size 25mmx25mmx3mm for boarding laid over silver oak joists of size 10 x6.50cm cm spaced at abote 90 cm centre to centre and supported by casurina props of 10 cm to 30 cm Dia faced at not more than 75 cm centre to centre etc.complete complying with the standard specification (payment for centering shall be given after concrete is laid) | 128.4 | Sqm | 178.5 ₹22,919.4 | 178 ₹22,855.2 Lowest |
| 5.00 | cement concrete 1: 3:6 using 20 mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etccomplete for 10 cum | 8.28 | Cum | 6,353.92 ₹52,610.46 | 6,353.9 ₹52,610.29 Lowest |
| 6.00 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete 10 cum | 33.75 | Cum | 6,913.94 ₹2,33,345.48 | 6,909.94 ₹2,33,210.48 Lowest |
| 7.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 1,04,931.71 ₹1,04,931.71 | 1,04,632.86 ₹1,04,632.86 Lowest |
Tender Value
₹7.0 L
EMD Value
₹7,050
Closing Date
26 Feb 2026, 3:00 pmClosed
BDO VP
Panchayat Union Sholinghur
PROVIDING CC PAVEMENT AT ODDANARI VILLAGE H/O THAGARAKUPPAM PANCHAYAT IN SHOLINGHUR BLOCK RANIPET DISTRICT
2026_RDTN_664002_1
B3/3134/2023
Open Tender
Civil Works
Item Rate
180 days
Sholinghur
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹7,050
Yes
23 Sept 2026
21 Feb 2026
26 Feb 2026
21 Feb 2026
26 Feb 2026
21 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PROVIDING CC PAVEMENT AT ODDANARI VILLAGE H/O THAGARAKUPPAM PANCHAYAT IN SHOLINGHUR BLOCK RANIPET DISTRICT | - | - | - | - |
| 2 | Earthwork excavation for foundation in all soilsand sub soils to full depth etc.,ordinary soil complete. | 21.6 | Sqm | 131.89 | ₹2,848.82 |
| 3 | Cement concrete 1:4:8 (one cement ,fourM.sand and eight hard broken stone jelly) using 40mm gauge hard broken granite stone jellyfor foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick,well rammed,consolidated and curing etc.complete complying with standard spceification | 48.6 | Sqm | 5,592.86 | ₹2,71,813 |
| 4 | Supplying and centreing for sides and soffits including necessary supports and struttering up to 3.29 M height for plane services as detailed below in all floors with all cross bracing using mild steel sheets of 90x60 cm and 10 BG stiffened with welded mild steel angle of size 25mmx25mmx3mm for boarding laid over silver oak joists of size 10 x6.50cm cm spaced at abote 90 cm centre to centre and supported by casurina props of 10 cm to 30 cm Dia faced at not more than 75 cm centre to centre etc.complete complying with the standard specification (payment for centering shall be given after concrete is laid) | 128.4 | Sqm | 182.5 | ₹23,433 |
| 5 | cement concrete 1: 3:6 using 20 mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etccomplete for 10 cum | 8.28 | Cum | 6,353.92 | ₹52,610.46 |
| 6 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete 10 cum | 33.75 | Cum | 6,913.94 | ₹2,33,345.47 |
| 7 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
BOQ_797229.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .