| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.8 LAccepted-Finance | ₹43.8 L | L1 | Accepted-Finance Bid In Order |
| 2 | L2₹48.2 L+₹4.5 L (10.2%)Accepted-Finance | ₹48.2 L+₹4.5 L (10.2%) | L2 | Accepted-Finance Bid In Order |
| 3 | L3₹48.3 L+₹4.5 L (10.4%)Accepted-Finance | ₹48.3 L+₹4.5 L (10.4%) | L3 | Accepted-Finance Bid In Order |
| 4 | L4₹48.4 L+₹4.6 L (10.6%)Accepted-Finance | ₹48.4 L+₹4.6 L (10.6%) | L4 | Accepted-Finance Bid In Order |
| 5 | L5₹48.8 L+₹5.0 L (11.5%)Accepted-Finance | ₹48.8 L+₹5.0 L (11.5%) | L5 | Accepted-Finance Bid In Order |
| Sl No | Description | Qty | Unit | M/s MATRI ENTERPRISES L5 | M/s K P Enterprises L6 | CHANDRADEO PRASAD L4 | SK SINGH L8 | M/S VIKASH TRADERS L2 | M/S SANGITA TRADERS L3 | M/S SHANTI UDYOG L1 | MM Dhar Enterprise L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of cement concrete (unreinforced) in ground floors and paving n.exc. 15cm thick (below or above ground level) and removal of rubbish from the site complete all as specified and as directed. | 13 | Cum | 1,200 ₹15,600 | 1,100 ₹14,300 | 1,080 ₹14,040 | 1,100 ₹14,300 | 1,100 ₹14,300 | 1,050 ₹13,650 | 800 ₹10,400 Lowest | 1,050 ₹13,650 |
| 2.00 | Taking down chowkhat or frames not exc 1.5 Sqm each (without taking off shutter from the frame) complete all as specified and as directed. | 3 | Each | 330 ₹990 | 400 ₹1,200 | 350 ₹1,050 | 340 ₹1,020 | 400 ₹1,200 | 290 ₹870 | 250 ₹750 Lowest | 450 ₹1,350 |
| 3.00 | Taking down chowkhat or frames exc 1.5 Sqm but not exc 4 Sqm each (without taking off shutter from the frame) complete all as specified and as directed. | 5 | Each | 550 ₹2,750 | 510 ₹2,550 | 420 ₹2,100 | 480 ₹2,400 | 530 ₹2,650 | 500 ₹2,500 | 250 ₹1,250 Lowest | 550 ₹2,750 |
| 4.00 | Dismantling floor, hearth , wall tiling including cement mortar bedding (but not backing) removing serviceable tiles to store and rubbish off the premises complete all as specified and as directed. | 177 | Sqm | 72 ₹12,744 | 85 ₹15,045 | 70 ₹12,390 | 75 ₹13,275 | 80 ₹14,160 | 65 ₹11,505 | 60 ₹10,620 Lowest | 75 ₹13,275 |
| 5.00 | Excavation in trenches n.exc 1.5m wide and n.exc 1.5m in depth; for foundation etc or for shafts, wells, cesspits, manhole, pier holes, etc n.exc 10 Sqm on plan and n.exc 1.5 m in depth and getting out in soft/loose soil complete all as specified and as directed. | 42 | Cum | 470 ₹19,740 | 445 ₹18,690 | 480 ₹20,160 | 380 ₹15,960 | 500 ₹21,000 | 450 ₹18,900 | 350 ₹14,700 Lowest | 460 ₹19,320 |
| 6.00 | Removing of excavated material not exceeding 50 m and depositing where directed at a level not exceeding 1.5 m above the starting point all complete all as specified and as directed. | 29 | Cum | 190 ₹5,510 Lowest | 240 ₹6,960 | 260 ₹7,540 | 220 ₹6,380 | 270 ₹7,830 | 250 ₹7,250 | 200 ₹5,800 | 260 ₹7,540 |
| 7.00 | Returning filling in trenches including spreading leveling watering and well ramming in layers not exceeding 25 cm thick complete all as specified and as directed. | 13 | Cum | 140 ₹1,820 Lowest | 210 ₹2,730 | 180 ₹2,340 | 190 ₹2,470 | 200 ₹2,600 | 200 ₹2,600 | 150 ₹1,950 | 220 ₹2,860 |
| 8.00 | M&L for PCC (1:4:8) type D-2 (using 40mm graded stone aggregate) as in foundation, filling and mass concrete complete all as specified and as directed. | 2.3 | Cum | 7,400 ₹17,020 | 7,300 ₹16,790 | 8,000 ₹18,400 | 7,800 ₹17,940 | 7,300 ₹16,790 | 7,500 ₹17,250 | 7,200 ₹16,560 | 7,100 ₹16,330 Lowest |
| 9.00 | M&L for mild steel TMT bars 10mm dia and over cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips complete all as specified and as directed. | 600 | Kg | 180 ₹1,08,000 | 150 ₹90,000 | 145 ₹87,000 | 150 ₹90,000 | 140 ₹84,000 | 140 ₹84,000 | 130 ₹78,000 Lowest | 160 ₹96,000 |
| 10.00 | M&L for mild steel TMT bars 5mm dia and over and including 10mm dia in stirrups spacers and binders,cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips complete all as specified and as directed. | 250 | Kg | 180 ₹45,000 | 160 ₹40,000 | 145 ₹36,250 | 150 ₹37,500 | 140 ₹35,000 | 140 ₹35,000 | 135 ₹33,750 Lowest | 170 ₹42,500 |
Tender Value
₹43 L
EMD Value
₹86,000
Closing Date
15 Aug 2026, 6:00 pmClosed
GE 868 EWS
GE 868 EWS PIN- 913 868 C/o 99 APO
ADDN ALTN TO BLDG NO T 57 FRESH SHED IN C ZONE AT 50 COY ASC SUP IN RMS
2026_MES_777060_1
9023/C/E8
Open Tender
Civil Works
Item Rate
180 days
RANGAPAHAR
Class D, Category a(i)
2 documents required · 2 mandatory
₹500
GE 868 EWS
₹86,000
18 Aug 2026
7 Jul 2026
17 Aug 2026
7 Jul 2026
15 Aug 2026
8 Aug 2026
7 Jul 2026 - 15 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of cement concrete (unreinforced) in ground floors and paving n.exc. 15cm thick (below or above ground level) and removal of rubbish from the site complete all as specified and as directed. | 13 | Cum | - | - |
| 2 | Taking down chowkhat or frames not exc 1.5 Sqm each (without taking off shutter from the frame) complete all as specified and as directed. | 3 | Each | - | - |
| 3 | Taking down chowkhat or frames exc 1.5 Sqm but not exc 4 Sqm each (without taking off shutter from the frame) complete all as specified and as directed. | 5 | Each | - | - |
| 4 | Dismantling floor, hearth , wall tiling including cement mortar bedding (but not backing) removing serviceable tiles to store and rubbish off the premises complete all as specified and as directed. | 177 | Sqm | - | - |
| 5 | Excavation in trenches n.exc 1.5m wide and n.exc 1.5m in depth; for foundation etc or for shafts, wells, cesspits, manhole, pier holes, etc n.exc 10 Sqm on plan and n.exc 1.5 m in depth and getting out in soft/loose soil complete all as specified and as directed. | 42 | Cum | - | - |
| 6 | Removing of excavated material not exceeding 50 m and depositing where directed at a level not exceeding 1.5 m above the starting point all complete all as specified and as directed. | 29 | Cum | - | - |
| 7 | Returning filling in trenches including spreading leveling watering and well ramming in layers not exceeding 25 cm thick complete all as specified and as directed. | 13 | Cum | - | - |
| 8 | M&L for PCC (1:4:8) type D-2 (using 40mm graded stone aggregate) as in foundation, filling and mass concrete complete all as specified and as directed. | 2.3 | Cum | - | - |
| 9 | M&L for mild steel TMT bars 10mm dia and over cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips complete all as specified and as directed. | 600 | Kg | - | - |
| 10 | M&L for mild steel TMT bars 5mm dia and over and including 10mm dia in stirrups spacers and binders,cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips complete all as specified and as directed. | 250 | Kg | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
Tender9023.pdf
Tender Documents • 1.64 MB
BOQ_870239.xls
BOQ • 0.31 MB
Amn9023.pdf
PDF • 0.18 MB
Date9023.pdf
PDF • 0.18 MB
Date.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .