Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.4 LAdmitted-Fee/PreQual/Technical/Finance | +2.00% | ₹12.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹12.7 L+₹24,364 (1.96%)Admitted-Fee/PreQual/Technical/Finance | +4.00% | ₹12.7 L+₹24,364 (1.96%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹12.2 L
EMD Value
₹12,200
Closing Date
10 Aug 2026, 3:00 pmClosed
The Zonal officier
No 1 Lake Area 4th cross street Nungambakkam Chennai 600034
Formation of Footpath at Nimmo Street in Div-125, Unit-25, Zone-9
2026_CoC_690890_1
Z.O.IX.C.No.E2/3739/2026
Limited
Civil Works
Works
90 days
Zone-09
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹12,200
14 Aug 2026
4 Aug 2026
10 Aug 2026
4 Aug 2026
10 Aug 2026
4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.- Upto 2.40m Footing Depth. (including Refilling charges) | 19 | CUM | 368.55 | ₹7,002.45 |
| 2 | Crushed Gravel Sand (Concrete Sand) | 7 | CUM | 2,800 | ₹19,600 |
| 3 | Cement Concrete 1:3:6 (One Cement, Three crushed stone sand and Six broken stone jelly) using 40mm size hard broken stone jelly excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete and as directed by the departmental officers. - Mixing by mechanical means | 7 | CUM | 6,709.81 | ₹46,968.67 |
| 4 | Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 250 mm thick specification including premixing the materials with water at OMC in mechnanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 | 44 | CUM | 2,709.1 | ₹1,19,200.4 |
| 5 | Supplying and laying of Interlocking Paver Block Stone 83mm thick Over a base layer of crushed stone sandfilling incl. Cost of materials laying and Labour charges etc complete complying with the standard specification and as directed by the departmental officers. | 437 | SQM | 1,636.17 | ₹7,15,006.29 |
| 6 | Supplying And Fixing of Rubber Moulded Grey Premium Concrete Kerb of Size 450X125X300mm Using M30 Concrete. The Concrete Shall Be Moulded By Table Mount Vibrated With Polypropylene Fibers At 5% And Curing Compound. The Rate Shall Include Cost of Materials Transportation Loading Unloading Charges And All Taxes Including Necessary Earth Work Pointing With cm. 1:3 To Full Depth Curing Thread Lining Etc Complete . | 208 | MTR | 893.29 | ₹1,85,804.32 |
| 7 | Painting the wall two coats with approved weather proof Exterior Emulsion paint over one primer coat on cement plastered wall surface ect., complete complying with standard specification and as directed by the departmental officers. | 84 | SQM | 260.88 | ₹21,913.92 |
| 8 | Supplying and Planting of Wodyetia bifurcata (Foxtail palms) palm variety of height 180-210 cm in polythene bag of dia 30cm including supporting stack of 5 cm dia casurina pole of 10 feet height, including loading and unloading charges, transportation, stacking of saplings at site, earth work excavation of required size, planting of sapling, refilling of excavated earth etc as directed by the site in-charge. | 40 | EACH | 1,537.5 | ₹61,500 |
| 9 | Supply and stacking of red earth at site to the departmental guage for pre- measurements which is of light textured, crystalline, porous and friable and not of generally acidic or neutral but not of alkaline and should be fertile, including seignior age charges, cost of transportation, loading, unloading, stacking and inclusive of all taxes etc., complete. | 10 | CUM | 2,111.4 | ₹21,114 |
| 10 | Mixing charges of Red soil, sand and manure uniformly (1:1:1) for Preparation of soil mixture (excluding material cost) | 10 | CUM | 100 | ₹1,000 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
3739TBook.pdf
Tender Documents • 1.69 MB
BOQ_830679.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .