Loading…
Loading…
Tender Value
₹16.8 L
EMD Value
₹16,900
Closing Date
3 Oct 2026, 5:00 pm6d left
Divisional Officer
SE Balangir R and B Division,Balangir
FDR estimate such as pothole repair, shoulder wash out repair, rain cut repair, tree removal,CD vent clearance etc for the Burda-Arjunpur road ch0/00 to 05/882 km
2026_EICCL_141705_1
SEBGRRB/14/2026-27
National Competitive Bid
Civil Works - Roads
Percentage
60 days
Balangir
2 documents required · 2 mandatory
₹6,000
₹16,900
Yes
25 Sept 2026
25 Sept 2026
5 Oct 2026
25 Sept 2026
3 Oct 2026
25 Sept 2026
25 Sept 2026 - 3 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting trees rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned upto a lead of 1000metres including removal and disposal of top organic soil not exceeding 150mm in thickness as per Clause 201 of MoRT&H Specifications for Road & Bridge works (5th Revision)and as per direction of Engineer-in-Charge.. | 1,04,940 | sqm | 8.63 | ₹9,05,632.2 |
| 2 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. | 86.5 | sqm | 19.36 | ₹1,674.64 |
| 3 | Providing and laying Semidence Bituminous Concrete Gr-II with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with Bitumen 60/70 grade @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects | 2.17 | cum | 14,383.57 | ₹31,212.35 |
| 4 | Providing and laying bituminous macadam with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface | 4.33 | cum | 10,611.96 | ₹45,949.79 |
| 5 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with pave | 4.33 | cum | 2,495.47 | ₹10,805.39 |
| 6 | Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means | 86.5 | sqm | 55.5 | ₹4,800.75 |
| 7 | White Washing two coat with shell lime | 328.13 | sqm | 17.2 | ₹5,643.84 |
| 8 | Scrapping of old paints with scrapers, sand papering and washing with soap water or soda including scaffolding charges up to 5.0 Mtr. height. | 615.2 | sqm | 5.12 | ₹3,149.82 |
| 9 | Painting two coat synthetic enamel paint on new concrete surface (By synthetic enamel paint) DATA BOOK P-220/803 | 739.13 | sqm | 163.2 | ₹1,20,626.02 |
| 10 | Providing compacted granular materials in shoulder by using moorum having required P.I. value spreading in uniform layers not exceeding 100mm in depth and compacting with smoth wheeled roller to achieve the desired density, as per approved Drawing & Technical Specifications and as per Clause - 407 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance, royality & other taxes of materials, cost of labour, machinery, T&P etc
complete. | 450 | cum | 1,072.7 | ₹4,82,715 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 1.42 MB
Tendernotice_1.pdf
PDF • 1.29 MB
BOQ_610872.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .