| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.5 LAccepted-AOC | L1 | Accepted-AOC Lowest bidder | |
| 2 | L2₹28.4 L+₹25,489 (0.90%)Rejected-Finance | L2 | Rejected-Finance Other than lowest bidder | |
| 3 | L3₹28.6 L+₹39,286 (1.39%)Rejected-Finance 96 SECTOR 16 A CHANDIGARH 160015 | CHANDIGARH | CHANDIGARH | 160015 | L3 | Rejected-Finance Other than lowest bidder | |
| 4 | L4₹28.6 L+₹42,630 (1.51%)Rejected-Finance | L4 | Rejected-Finance Other than lowest bidder | |
| 5 | L5₹28.6 L+₹46,636 (1.66%)Rejected-Finance | L5 | Rejected-Finance Other than lowest bidder |
Tender Value
₹27.8 L
EMD Value
₹55,600
Closing Date
26 Dec 2022, 6:00 pmClosed
CWE (AF) Bagdogra
Commander Works Engineers (AF) Bagdogra Bagdogra Airport (WB) Pin- 734 421 Tele 0353 - 2898308
REPAIR / MAIN OF CENTRAL / PACKAGE TYPE AC PLANT AT VARIOUS LOCATIONS AT AF STN HASIMARA.
2022_MES_567348_1
8496/HAS/2022-23/E8
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
Hasimara
MES Contractor enlisted as Class D category c(i) having deposited Standing Security of Rs 1,00,000.00 with dept. Contractors not enlisted in MES should meet the MES enlistment criteria corresponding to appropriate class and category.
10 documents required · 10 mandatory
₹500
GE AF Hasimara
₹55,600
Yes
17 Feb 2023
5 Dec 2022
2 Jan 2023
5 Dec 2022
26 Dec 2022
19 Dec 2022
Amount
Note 1:- (Applicable for all parts/items) : The biidders/contractors are advised to read tender documents & all corrigendum/amendments and general condition of contracts before entry/quoting the rates. Note 2:- Attention to bidder is hereby invited to upload revised BOQ if published during their bid submission. Uploading of incorrect/ pre-revised BOQ shall be treated as non bonafide and rejected. Fixed credit has been given in technical documents which shall be taken into account during acceptance of bid/tender.
M&L for Dismantling complete Compressor set , 30 TR capacity of make Accel, Model SMC-8-65 and overhauling the compressor by repair and checking of wornout holes of studs and providing over size studs with nuts & washers and gaskets. Rematlling and balancing of piston, replacement of piston ring,scrapper ring, split pin, castle nut, bushing for piston pin, and set of sealing ring of compressor including necessary machine work and replacement of other defective spares, reassemblying the compressor set after the repair and tested for smooth functioning complete all as specified and directed. Note:- (i) Spare parts shall be measured and paid separately as supply only under respective item. (ii) Cost of Tansportation from site to workshop (If any) and back shall be deemed to be included in quoted rate.
Supply only suction valve ring plate for compressor set, 30 TR capacity of Make: Accel , Model: SMC-8-65 complete all as specified and directed.
Supply only Discharge valve ring plate complete ditto all as per item no. 1.01
Supply only Safty valve assembly complete ditto all as per item no. 1.01
Supply only connecting rod bolt complete ditto all as per item no. 1.01
Supply only Lock nut crankshaft complete ditto all as per item no. 1.01
Supply only Split pin complete ditto all as per item no. 1.01
Supply only Half section of BRG 0.75mm under size complete ditto all as per item no. 1.01
Supply only Bushing with detachable collar complete ditto all as per item no. 1.01
Supply only Piston with pin and rings complete ditto all as per item no. 1.01
Supply only Bushing for piston pin complete ditto all as per item no. 1.01
Supply only Valve spring complete ditto all as per item no. 1.01
Supply only Spring for unloading pin complete ditto all as per item no. 1.01
Supply only Set of Gasket SMC 8-65 complete ditto all as per item no. 1.01
Supply only Set of sealing ring complete ditto all as per item no. 1.01
Supply only Set of Neoprene 'O' ring complete ditto all as per item no. 1.01
Supply only Cylinder linder with suction valve complete ditto all as per item no. 1.01
Supply only Seeger ring complete ditto all as per item no. 1.01
Supply only Suction Stariner for SMC 8-65 complete ditto all as per item no. 1.01
Supply only Oil Stainer complete ditto all as per item no. 1.01
Supply only Hand shut off valve complete ditto all as per item no. 1.01
Supply only Set of dowry ring complete ditto all as per item no. 1.01
Supply only Set of Aluminum packing complete ditto all as per item no. 1.01
Supply only Oil pump repair kit complete ditto all as per item no. 1.01
Supply only Oil pump complete ditto all as per item no. 1.01
Supply only Unloader cylinder assembly complete ditto all as per item no. 1.01
Supply only Single frame for unloading complete ditto all as per item no. 1.01
Supply only Oil pressure valve complete ditto all as per item no. 1.01
Supply only angle valve assembly as per existed all as per item no. 1.01
S&F in repair Loader / Unloader valve of existing size of model SMC8-65 compressor complete all as specified and directed. Make:- Rotex/ASCO parkar or equivalent
S&F in repair pilot control solenoid valve for SMC8-65 compressor complete all as specified and directed.
S&F in repairs thermostat expansion valve suitable for 60 TR complete all as specified and directed. Make:- Sporlan / Danfoss or equivalent
S&F in repairs of liquid line stainer filter for SMC-8-65 complete all as specified and directed.
S&F in repair suction service valve of compressor of ACCEL make Model SMC-8-65 complete all as specified and directed.
S&F in repair discharge service valve of compressor of ACCEL make Model SMC-8-65 complete all as specified and directed.
S&F in repair shaft seal assembly of compressor of ACCEL make Model SMC - 8-65 complete all as specified and directed.
M&L for Dismantling complete Compressor set , 35 TR capacity of make Voltas, Model 5H-60 and overhauling the compressor by repair and checking of wornout holes of studs and providing over size studs with nuts & washers and gaskets. Rematlling and balancing of piston, replacement of piston ring,scrapper ring, split pin, castle nut, bushing for piston pin, and set of sealing ring of compressor including necessary machine work and replacement of other defective spares, reassemblying the compressor set after the repair and tested for smooth functioning complete all as specified and directed. Note:- (i) Spare parts shall be measured and paid separately as supply only under respective item. (ii) Cost of Tansportation from site to workshop (If any) and back shall be deemed to be included in quoted rate. (iii) Refrigerant gas required for the job is supplied by the firm and paid saperately under relevant items of the schedule .
Supply only set of Gasket 5H-60 complete all as specified and directed.
Supply only suction reed complete ditto all as per item no. 9.01
Supply only Discharge reed complete ditto all as per item no. 9.01
Supply only piston with piston ring and pin complete ditto all as per item no. 9.01
Supply only connecting bearing complete ditto all as per item no. 9.01
Supply only Main bearing sealed side complete ditto all as per item no. 9.01
Supply only main bearing oil pump side complete ditto all as per item no. 9.01
Supply only suction spring complete ditto all as per item no. 9.01
Supply only discharge spring complete ditto all as per item no. 9.01
Supply only cylinder liner complete ditto all as per item no. 9.01
Supply only Oil strainer complete ditto all as per item no. 9.01
Supply only Shaft thrust bearing oil pump side complete ditto all as per item no. 9.01
Supply only Shaft thrust bearing sealed side complete ditto all as per item no. 9.01
Supply only valve plate complete ditto all as per item no. 9.01
Supply only Oil sealed set with plate complete ditto all as per item no. 9.01
Supply only Oil pump set complete ditto all as per item no. 9.01
Supply only liquid line valve size 11/8 complete ditto all as per item no. 9.01
Supply only Oil line valve size 7/8 complete ditto all as per item no. 9.01
Supply only Discharge valve assembly complete ditto all as per item no. 9.01
S&F in repairs thermostat expansion valve suitable for 70 TR complete all as specified and directed. Make:- Sporlan / Danfoss or equivalent.
S&F in repair suction service valve of compressor of Voltas make Model 5H - 60 complete all as specified and directed.
S&F in repair discharge service valve of compressor of Voltas make Model 5H - 60 complete all as specified and directed.
S&F in repair shaft seal assembly of compressor of Voltas make Model 5H - 60 complete all as specified and directed.
S&F in repair Suction stainer SMC 4-65 complete as per existing complete all as specified and directed.
S&F in repair Oil Stainer for SMC 4-65 complete as per existing specification complete all as specified and directed.
S&F Oil pump repair kit complete all as specified and directed.
S&F loading solenoid valve as per existing specification complete all as specified and directed.
S&F liquid line valver as per existing complete all as specified and directed.
S&F in repair Loader / Unloader valve of existing size of model SMC4-65 compressor complete all as specified and directed. Make:- Rotex/ASCO parkar or equivalent as approved.
S&F in repair suction service valve of compressor of ACCEL make Model SMC-4-65 complete all as specified and directed.
S&F in repair discharge service valve of compressor of ACCEL make Model SMC-4-65 complete all as specified and directed.
S&F in repair shaft seal assembly of compressor of ACCEL make Model SMC -4-65 complete all as specified and directed.
S&F Oil line valve complete for smc 4-65 complete all as specified and directed.
S&F in repair pilot control solenoid valve for SMC4-65 compressor complete all as specified and directed.
S&F in repairs thermostat expansion valve suitable for 15 TR complete all as specified and directed. Make:- Sporlan / Danfoss or equivalent
S&F in repairs of liquid line stainer filter for SMC-4-65 complete all as specified and directed.
S&F in repair V Belt for compressor of ACCEL make Model SMC 4-65 as per existing size complete all as specified and directed.
S&F in repairs crankcase heater of scroll compressor for 12.5 TR capacity complete all as specified and directed.
S&F in repair Dryer size 5/8 , length 165 mm for condensor complete as per existing one and complete all as specified and directed.
M&L for taking out / purging of refrigerant gas from the system of AC plant 3 x 15 TR capacity for carrying out vacuum test by vacuuming the whole A/c plant with the help of vacuum pump and checking the complete system for leakages. Carrying out the pressure test by charging the nitrogen gas in the system and checking of any leakage point , repair / rectification of the same and removing the nitrogen gas from the system and charging of refrigerant gas including charging of additional gas as required and complete all as specified and directed. Note:- (i)The arrangement of T&P Nitrogen gas shall be contractors responsibility. (ii) Refrigerant gas shall be measured and paid separately.
M&L for taking out / purging of refrigerant gas from the system of A/c plant 3 x 30 TR capacity for carrying out vacuum test by vacuuming the whole AC plant with the help of vacuum pump and checking the complete system for leakages. Carrying out the pressure test by charging the nitrogen gas in the system and checking of any leakage point , repair / rectification of the same and removing the nitrogen gas from the system and charging of refrigerant gas including charging of additional gas as required and complete all as specified and directed. Note:- (i)The arrangement of T&P Nitrogen gas shall be contractors responsibility. (ii) Refrigerant gas shall be measured and paid separately.
M&L for taking out / purging of refrigerant gas from the system of AC plant 3 x 35 TR capacity for carrying out vacuum test by vacuuming the whole AC plant with the help of vacuum pump and checking the complete system for leakages. Carrying out the pressure test by charging the nitrogen gas in the system and checking of any leakage point , repair / rectification of the same and removing the nitrogen gas from the system and charging of refrigerant gas including charging of additional gas as required complete all as specified and directed. Note:- (i)The arrangement of T&P Nitrogen gas shall be contractors responsibility. (ii) Refrigerant gas shall be measured and paid separately.
M&L in repairs to Pakage type air conditioner in situ position of capacity mentioned below of any make and any type by replacing unserviceable compressor and other parts from the machine including charging of refrigerant gas after vaccuming and leak testing including brazing the suction / discharge tubes where required and cleaning of condensing unit to achieve proper cooling effect, checking of electronic circuit of machine and repair where necessary by replacing electronic parts and changing of wirings with of PVC insulated wires as per existing type and testing commissioning complete all as specified and directed. Note:- (i) Compressor and other parts needed for repair shall be measured and paid separately under relevent item given in schedule 'A' here in after as supply only. (ii) Existing refrigerant gas shall be preserved in a empty cylinder for re-use in new compressor and additional requirement of refrigerant charging shall be measured and paid separately under relevant item of this schedule.
Supply only new compressor 2.5 TR capacity 3 phase 440 V complete all as specified and directed. Make:- Emerson/Carreir or equivalent.
S&F multi capacitor complete as per existing one and complete all as specified and directed.
Dismantling the existing unservceable sensing unit of ductable Spit AC 7.5/8.5 TR, S&F new sensing unit of ductable split AC unit 7.5/8.5 TR complete all as specified and directed.
M&L for dismantling and refixing new outdoor fan motor single phase 240 volt AC as per existing size for ductable split AC 7.5/8.5 TR capacity complete all as specified and directed.
S&F in repair Condenser unit assembly for 7.5 TR capacity complete as per existing one complete all as specified and directed.
S&F in repair new indoor blower motor single phase 240 volt AC as per existing size for ductable split AC 7.5/8.5 TR capacity complete all as specified and directed.
Supply and fill Refrigerant Gas R- 22 in the central AC plant where ever required to fill complete all as specified and as directed. Make:- Mafron or equivalent.
Supply and fill Refrigerant Gas R- 134a in the central AC plant where ever required to fill complete all as specified and as directed. Make:- Mafron or equivalent.
Supply and fill Refrigerant Gas R- 407C in the central AC plant where ever required to fill complete all as specified and as directed. Make:- Mafron or equivalent.
Supply and filling compressor oil suitable for R-22 gas wherever required to fill complete all as specified and directed. Make:- Freeze Oil or equivalent.
Supply and filling compressor oil suitable for R-134a gas wherever required to fill complete all as specified and directed. Make:- Freeze Oil or equivalent..
M&L for taking out compressor Motor (Motor cap-40 HP) of AC plant and Dismantling the motor with disconnecting the same from the compressor and remove rubber coupling and its connected accessories and transporting to reputed work shop for rewinding . Opening the motor, cutting & removing old and burnt winding wire, rewinding the motor with new super enameled copper winding of size & discription to match with existing including insulating materials, varnishing, drying, replacement of both driven end non driven end bearings and base plate, reassembling, refixing in same position & connecting including testing and commissioning complete all as specified and directed.
M&L for taking out compressor Motor (Motor cap-60 HP) of AC plant and Dis mantling the motor with disconnecting the same from the compressor and remove rubber coupling and its connected accessories and transporting to reputed work shop for rewinding . Opening the motor, cutting & removing old and burnt winding wire, rewinding the motor with new super enameled copper winding of size & discription to match with existing including insulating materials, varnishing, drying, replacement of both driven end non driven end bearings and base plate, reassembling, refixing in same position & connecting including testing and commissioning complete all as specified and directed.
M&L for Repair and comprehensive maintenance of Variable Refrigerant Flow (Samsung make) system (11 x 2)TR equipped with invertor, compressors, acryl precoated heat exchanger, low noise Condenser fan, auto check function for connection error, auto address setting with any capacity Modules and any location Including replacement of all thermocol foams insulating materials and any type of packing material, PVC drain pipe connections and any item required for replacement like as copper tubing, through authorised service agent of manufacturer for the complete plant by servicing to outdoor condensor unit complete all as directed by Engineer-in- Charge. Note:- Copper cable required for any size (upto 6 sqmm ) for interlocking connection shall be deemed in quoted rate.
M&L for dismantling cooling tower by removing CT Fans sprinklers, PVC Fills , cleaning complete cooling tower body, removing scale, dust, dirt and refilling old PVC fills (serviceable qty shall be reused to the extent available) after cleaning with diluted HCL solution, assembling ,connecting , cleaning existing external surfaces and applying two coats of approved synthetic enamel paint including and testing etc. for the cooling tower of 24/30 TR capacity complete all as specified and directed. Note:- Extra PVC fills/sprinkler assembly/fan assembly required to complete the job shall only be measured and paid separately as supply only to the extent required and ordered.
Supply only sprinkler assembly complete with header nozzles made out of galvanised iron suitable to fix in cooling towers of 24/30 TR capacity AC plants complete all as specified and directed.
Supply only cooling tower fan assembly with low speed fan with noise level not exc 75 DBA made out of propeller type light weight solid/ hollow FRP rust resistant with statically and dynamically balanced blades suitable for 24 TR capacity AC plant complete all as specified and directed. Note:- (i) Outlet velocity of air shall not be less than 610 mtrs/ min (ii) Fan shall be protected by a fan guard and bird screen of galvanised steel construction. (iii) G SS/ SS 304 fan guard shall be provided over the fan motor for protection against rain water.
M&L for dismantling of existing Air Handling Unit of 24 TR capacity , cleaning, servicing, overhauling all component of AHU, with and including cleaning of heating & cooling coil with caustic soda solution, including welding / brazing, wherever required to arrest leakages, cleaning of Pre-Micro Filters, replacing of vertical GI sheet supports, replacement of U/S foam insulation of best quality using adhesive substance to avoid cold air leakages, fabrication of bottom GI tray of existing size with drain pan made out of 16 guage thick GI Sheets duly painted over interior surface of tray, re-assembling all the dismantled components to its original position using new nut, bolt, washer and other packing material etc, with and including testing, commissioning of Air handling Unit at optimum efficiency, complete all as specified and directed.
M&L for dismantling of existing Air Handling Unit of 60 TR capacity , cleaning, servicing, overhauling all component of AHU, with and including cleaning of heating & cooling coil with caustic soda solution, including welding / brazing, wherever required to arrest leakages, cleaning of Pre-Micro Filters, replacing of vertical GI sheet supports, replacement of unsevicable foam insulation of best quality using adhesive substance to avoid cold air leakages, fabrication of bottom GI tray of existing size with drain pan made out of 16 guage thick GI Sheets duly painted over interior surface of tray, re-assembling all the dismantled components to its original position using new nut, bolt, washer and other packing material etc, with and including testing, commissioning of Air handling Unit at optimum efficiency, complete all as specified and directed.
M&L for dismantling of blower shaft of AHU of 24TR capacity, by removing the belt and pulley, blower drum, and remetaling the shaft and filling of metal at decayed portions including all welding, turning, polishing and other machine works required to make the shaft of required shape and size, as original, balancing the shaft and refitting in AHU including re-assembling the blower, pulley etc with and including replacement of new bearing of existing size, testing the AHU for satisfactory operation, complete all as specified and directed.
M&L for dismantling of blower shaft of AHU of 60 TR capacity, by removing the belt and pulley, blower drum, and remetaling the shaft and filling of metal at decayed portions including all welding, turning, polishing and other machine works required to make the shaft of required shape and size, as original, balancing the shaft and refitting in AHU including re-assembling the blower, pulley etc with and including replacement of new bearing of existing size, testing the AHU for satisfactory operation, complete all as specified and directed.
M&L for repairs to leakages /damaged cooling coil for AHU 24 TR capacity by blocking/ by passing the corroded/ leakaged tube of DX coil, involving following activities:- (i) Removing the cooling coil from Air Handling unit and transport to the contractor /approved workshops. (ii) Leakage testing of the DX coil using nitrogen gas and finding the leakage tubes. (iii) Blocking/ By passing the leakaged copper tube and connect the copper tube with suitable new 'U' bends etc., by brazing. (iv) Straighten the fins of cooling coil using suitable brushes. (v) Painting of cooling coil with applying two coats of aluminium paint including preparation of surface. (vi) Reasembling the cooling coil to the Air handling unit and again testing with nitrogen to the complete system for 08 hours for 24 TR capacity of the Air handling Units complete all as specified and directed.
Dismantling the SMC 8-65 Accel compressor by disconnecting the suction, discharge and liquid lines by cutting/brazing and taking down from the existing position, Compressor motor of 60 HP capacity by disconnecting the electrical connection and nuts and bolts from the base by dismantling the base of compressor and compressor motor, dismantling the suction and discharge valves of compressors by disconnecting the nuts and bolts and rubber gaskets, dismantling the bolts from compressor body and base of the foundation, taking out the channels of MC 150 from the PCC foundation by dismentling the PCC foundation with the PCC frame etc complete all as specified and directed.
Dismantling two Nos 7.5 Hp capacity condenser pump motor from their flange including the rubber gasket and dismantling the channels frame of MC - 100 from the PCC foundation by taking out the unserviceable PCC foundation with the PCC frame etc complete all as specified and directed.
Refixing the SMC 8-65 Accel, compressor by connecting the suction, discharge and liquid lines with the help of of nuts/bolts/welding/brezing, refixing the compressor motor of 60 HP capacity on the base with the help of nuts and bolts in the base frame, taking alignment of the compressor and compressor motor, refixing the suction and discharge valves of compressor, fixing the bolts on compressor and compressor body in base frame, fixing the channels of MC 150 on the PCC foundation with the help of bolts etc complete all as specified and directed.
Re-fixing two in Nos 15 Hp capacity condenser pump motor flange with the help of rubber gasket, fixing nuts and bolts in the channels frame of MC - 100 on the pcc foundation, connecting all the electric connection and conforming the pumps are running satisfactorily without the vibration etc complete all as specified and directed.
M&L for providing PCC (1:4:8) type D2 using 40 mm grade aggregate for foundations of PVC water tank, chiller tank, cooling tower, chilled water line, base of pump, panel boards etc complete including necessary form work complete all as specified and directed.
M&L for rendering 20 mm thick in cement mortar (1:4) on brick / concrete surfaces finished even and smooth without using extra cement complete all as specified and directed.
M&L for changing of base frame of compressor and compressor motor made out of medium grade iron channels of size MC - 150 grouting in the pcc foundation for the fixing of nuts and bolts of compressor and compressor motors etc complete all as specified and directed.
M&L for changing of base frame of condenser pump motor made out of medium grade iron channels of size MC-100 grouting in the pcc foundation for the fixing of nuts and bolts of the motor pumps etc complete all as specified and directed.
BEEPEE AND COMPANY
ANIL KUMAR GUPTA
SARKAR ENGINEERING CO.
Shree Ram Construction
M/S BIJAY KUMAR SHIVA
KD SAHA and CO.INDIA
M/S ANNI ENTERPRISE
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .