Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.2 LAccepted-AOC 2 1 MIN NAGAR KOTTUR ROAD SULEESWARANPATTI POLLACHI 624006 | 624006 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹11.3 L+₹16,642.07 (1.49%)Rejected-Finance 44 82 LIG COLONY 1 MAHALINGAPURAM POLLACHI | COIMBATORE | TAMIL NADU | 638459 | L2 | Rejected-Finance Rejected |
Tender Value
₹12 L
EMD Value
₹12,000
Closing Date
28 Dec 2023, 3:00 pmClosed
Project Director, DRDA
DRDA Coimbatore
TN 02-101 Construction of 100000 litre capacity Sump at No. 9 Kumaran Avenue H/O Pannimadai Panchayat in P.N.Palayam Panchyat Union, COIMBATORE UNDER 15th CFC/2023-24 Scheme
2023_RDTN_399079_1
DIPR/896/Tender/2023 Dated 12.12.2023
Open Tender
Civil Works - Others
Item Rate
180 days
DRDA Coimbatore
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹12,000
DRDA Coimbatore
22 Apr 2024
13 Dec 2023
28 Dec 2023
14 Dec 2023
28 Dec 2023
14 Dec 2023
14 Dec 2023
Amount
1.Construction of 100000 litre capacity Sump at No. 9 Kumaran Avenue H/O Pannimadai Panchayat
100000 litre capacity Sump
Earthwork excavation in hard stiff clay,black cotton, hard red earth, shales,murrams, ordinary gravel stoney earth mixed with 50% fair sized boulders etc.,with an initial lead of 10m and lift of 2m. and as directed by departmental Officers.
For Hard soil 0 to 1m
For Hard soil 1m to 2m
HR reguireing blasting
Levelling coarse in cement concrete 1:4:8 (one cement,four sand and eight aggregate) using 40mm hard broken stone for foundation and leveling coarse including cost of all materials,mixing,placing, ramming, curing,complete and as directed by officers
Supplying and erecting centering for sides and soffits including supports for all reinforced cement concrete works like lintels, beams, etc., including strutting 3M high using Mild steel sheets of size 90cm × 60cm and B.G. 10, stiffened with Mild steel Angles of size 25mm × 25mm × 3mm laid over Silver oak (cw) joists of size 10cm × 6.5cm (Spaced about 91cm c/c) and supported by casurina props of 10cm to 13cm dia (Spaced at 75cm c/c) as noted below including removing the same after specified period without damaging RCC works in all floors etc., complete as directed by the departmental officers complying with relevant standard specifications
For 0.00 to 3.30m (Plane Surface)
For 3.30m to 4.30m (Plane Surface)
For 0.00 to 3.30m (Curved Surface)
For 0.00 to 3.30m (Circular Column)
Fabricating and placing the RTS rod for reinforcement for all reinforced cement concrete works such as plinth beam, lintels, beams, sunshade, roof and floor slabs etc., including cost of steel and fabricating the reinforcement grills in position etc., complete in all floors (The rate to include the cost of binding wire steel also)
Reinforced Cement concrete 1:1½:3 (One of cement, one and a half of sand and three of hard broken granite stones ) using 20mm gauge hard broken granite stones for all reinforced cement concrete works excluding the cost and fabrication of reinforcement grills in position, shuttering, centering but including laying, vibrating, curing, finishing and providing Mild steel fan hooks in the RCC slab wherever necessary as directed by the departmental officers etc., complete in all respects
Beyond 1.50m & upto 4.50m below GL
Upto 1.50m below GL
Upto 4.50m above GL from GL
Providing manhole cover of size 0.60×0.60m in RCC 1:1½:3 with suitable reinforcement 50mm×50mm×6mm MS angles fixed along edges and as directed by the departmental officers.
Painting two coats with best Plastic Emulsion paint
Filling the foundation with conveyed gravel (other than sand) in layers of not more than 15cm tk, watering, well ramming, consolidating, complying with standard specification ana as directed by officers
Provision for GI pipe B class 50mm
Laying and Jointing for GI Pipe B class 50mm
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
S PARTHIBARAJAN
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .