Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹45,485
Closing Date
4 Aug 2026, 3:00 pm
DIRECTOR
MNNIT Allahabad, Prayagraj-211004
Construction of new Hall of Bank of Baroda Extension at MNNIT Allahabad Academic Campus.
2026_MNNIT_918129_1
08/CWM/2026-27
Open Tender
Civil Works
Item Rate
90 days
Academic Campus MNNIT Allahabad
Please refer Tender documents
2 documents required · 2 mandatory
₹0
₹45,485
Yes
20 Jul 2026
20 Jul 2026
5 Aug 2026
20 Jul 2026
4 Aug 2026
20 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of new Hall of Bank of Baroda Extension at MNNIT Allahabad Academic Campus | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil | 30.42 | cum | - | - |
| 1.02 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 1.73 | cum | - | - |
| 1.03 | Providing centering & shuttering including strutting, propping etc. & removal of form including all materials, labour and T & P etc. required for proper completion of work all complete
Foundation, Footing, base of columns and plinth beam in any shape and size upto plinth level. | 16.08 | sqm | - | - |
| 1.04 | Providing centering & shuttering including strutting, propping etc. & removal of form including all materials, labour and T & P etc. required for proper completion of work all complete
Columns, Pillars, Piers, Abutments, Posts and Struts | 50.4 | sqm | - | - |
| 1.05 | Providing centering & shuttering including strutting, propping etc. & removal of form including all materials, labour and T & P etc. required for proper completion of work all complete
Lintels, beams, plinth beams, girders, bressumers and cantilevers | 71.3 | sqm | - | - |
| 1.06 | Providing centering & shuttering including strutting, propping etc. & removal of form including all materials, labour and T & P etc. required for proper completion of work all complete
Suspended floors, roofs, landings, balconies and access platform | 45 | sqm | - | - |
| 1.07 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works upto plinth level Concrete of M25 grade with minimum cement content of 330 kg /cum
All works up to Plinth level. | 9.88 | cum | - | - |
| 1.08 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works upto plinth level Concrete of M25 grade with minimum cement content of 330 kg /cum
All works Above Plinth level & upto Ground Floor | 29.42 | cum | - | - |
| 1.09 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Thermo-Mechanically Treated bars of grade Fe-500D or more. | 4,297.7 | kg | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
TenderdocumentCN08.pdf
Tender Documents • 1.70 MB
BOQ_964863.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].