Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.5 LAccepted-AOC SOMNATH PURAM BAGHRAJI WARD SAGAR DISTT SAGAR M P 470002 | SAGAR | SAGAR | MADHYA PRADESH | 470002 | ₹9.5 L | L1 | Accepted-AOC CONTRACT IS AWARDED |
| 2 | L2₹9.7 L+₹23,309.26 (2.46%)Rejected-Finance | ₹9.7 L+₹23,309.26 (2.46%) | L2 | Rejected-Finance HIGHEST BID |
| 3 | L3₹10.6 L+₹1.2 L (12.4%)Rejected-Finance | ₹10.6 L+₹1.2 L (12.4%) | L3 | Rejected-Finance HIGHEST BID |
| 4 | L4₹11.5 L+₹2.1 L (21.8%)Rejected-Finance | ₹11.5 L+₹2.1 L (21.8%) | L4 | Rejected-Finance HIGHEST BID |
| 5 | L5₹12.9 L+₹3.5 L (36.7%)Rejected-Finance | ₹12.9 L+₹3.5 L (36.7%) | L5 | Rejected-Finance CE , EE and DA |
Tender Value
₹14.4 L
EMD Value
₹14,388
Closing Date
2 Jan 2026, 5:30 pmClosed
Executive Engineer PWD E/M Division Sagar
Executive Engineer PWD E/M Division Sagar
Pole and Line Shifting Work at Sunar and Kopra river Under PWD E/M Sub Division Sagar . (PAC Rs.14,38,843 /-)
2025_PWDRB_469613_1
NIT No 10 PWD Date 18.12.2025
Open Tender
Electrical and Maintenance Works
Percentage
90 days
sagar
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,000
₹14,388
Yes
11 Mar 2026
19 Dec 2025
5 Jan 2026
19 Dec 2025
2 Jan 2026
19 Dec 2025
eProcurement System Government of Madhya Pradesh Created By: RAM DAS PRAJAPATI Created Date/Time: 07-Jan-2026 03:37 PM Tender Title: Pole and Line Shifting Work at Sunar and Kopra river Under PWD E/M Sub Division Sagar (PAC Rs.14,38,843 /-) Tender ID: 2025_PWDRB_469613_1
Tender Inviting Authority: Executive Engineer PWD DIVISION E/M SAGAR
Name of Work: Pole and Line Shifting Work at Sunar and Kopra river Under PWD E/M Sub Division Sagar . (PAC Rs.14,38,843 /-) 1- Pole and Line Shifting Work at Luhagar Nareta Bridge Construction on Sonar River (Rs.12,49,011/-) 2- Pole and Line Shifting Work at Chhulla Berkheri Bridge Construction on Kopra River (Rs.1,89,832/-)
Contact No: 7987140222
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words (Iteration 0)
1.00 SUJEET SINGH THAKUR (GSTN-23ADSPT0515E1ZO) BID ID -1403770 1438843.00 -32.65 969060.76 Nine Lakh Sixty Nine Thousand Sixty
2.00 RAM KUMAR SAHU (GSTN-23BHPPS1979B1Z3) BID ID -1406241 1438843.00 -34.27 945751.50 Nine Lakh Fourty Five Thousand Seven Hundred and Fifty One
3.00 dubeychowksey electrical construction and supplier (GSTN-23AANFD6487B1ZF) BID ID -1406833 1438843.00 -10.15 1292800.44 Tweleve Lakh Ninty Two Thousand Eight Hundred
4.00 SHIVA ELECTRICALS (GSTN-NA) BID ID -1402969 1438843.00 -26.11 1063161.09 Ten Lakh Sixty Three Thousand One Hundred and Sixty One
5.00 R C ENTERPRISES (GSTN-NA) BID ID -1406735 1438843.00 -19.91 1152369.36 Eleven Lakh Fifty Two Thousand Three Hundred and Sixty Nine
Lowest Amount Quoted BY: RAM KUMAR SAHU(945751.50)
BOQ Summary Details Tender Title: Pole and Line Shifting Work at Sunar and Kopra river Under PWD E/M Sub Division Sagar (PAC Rs.14,38,843 /-) Tender ID: 2025_PWDRB_469613_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 RAM KUMAR SAHU (BID ID -1406241) 945751.50 L1
2 SUJEET SINGH THAKUR (BID ID -1403770) 969060.76 L2
3 SHIVA ELECTRICALS (BID ID -1402969) 1063161.09 L3
4 R C ENTERPRISES (BID ID -1406735) 1152369.36 L4
5 dubeychowksey electrical construction and supplier (BID ID -1406833) 1292800.44 L5
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.99 MB
469613.pdf
Tender Documents • 10.55 MB
BOQ_552105.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .