Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.9 LAccepted-AOC KARUR | L1 | Accepted-AOC Addmited | |
| 2 | L2₹22.0 L+₹5,242.72 (0.24%)Rejected-AOC | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | K Sundaramoorthy L2 | SPE Construction L1 |
|---|---|---|---|---|---|
| 1.001.Construction of Compound Wall at Ampalli Village H/O Guttur Estimate Amount : 22.20 Lakhs | |||||
| 2.00 | Earth work excavation for foundation in all class of soils except hard rock requiring blasting including cost and conveyance of all etc.,complete | 148.35 | Cum | 264.18 ₹39,191.1 | 263.55 ₹39,097.64 Lowest |
| 3.00 | Cement concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers | 16.35 | Cum | 5,450.58 ₹89,116.98 | 5,437.58 ₹88,904.43 Lowest |
| 4.00 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid) | 149.47 | Cum | 548.32 ₹81,957.39 | 547.01 ₹81,761.58 Lowest |
| 5.00 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid) | 119.23 | Cum | 988.88 ₹1,17,904.16 | 986.52 ₹1,17,622.78 Lowest |
| 6.00 | Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS | 3.62 | Cum | 91,996.29 ₹3,33,026.57 | 91,776.75 ₹3,32,231.84 Lowest |
| 7.00 | Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs | 51.41 | Cum | 9,340.06 ₹4,80,172.48 | 9,317.77 ₹4,79,026.56 Lowest |
| 8.00 | Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction. . | 44.79 | Cum | 6,112.59 ₹2,73,782.91 | 6,098 ₹2,73,129.42 Lowest |
| 9.00 | Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. | 802.44 | Sqm | 285.29 ₹2,28,928.11 | 284.61 ₹2,28,382.45 Lowest |
| 10.00 | Distembering two coats including priming coat with best approved distember and primer including costand conveyance of all materials to site and all labour charges etc | 737.64 | Sqm | 262.87 ₹1,93,903.43 | 262.25 ₹1,93,446.09 Lowest |
Tender Value
₹22.2 L
EMD Value
₹23,000
Closing Date
10 Oct 2025, 3:00 pmClosed
The Block Development Officer
The Block Development Officer
krishnagiri Dt Bargur Block MLACDS_2025_26 Construction of Compound wall at Ampalli village at Guttur Panchayat BRG_23
2025_RDTN_612574_1
2086_2025_R7_Dt_02_08_2025
Open Tender
Civil Works - Others
Item Rate
180 days
The Block Development Officer
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹23,000
24 Sept 2026
9 Oct 2025
10 Oct 2025
9 Oct 2025
10 Oct 2025
9 Oct 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .