| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 LAccepted-AOC | L1 | Accepted-AOC Lowest Rate | |
| 2 | L2₹5.2 L+₹6,462.72 (1.26%)Rejected-Finance | L2 | Rejected-Finance Highest |
| Sl No | Description | Qty | Unit | DHANESHWAR L2 | SIBIN L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavating all classes of soils including all labour charges and all other charges etc complete as per SS 20 B for Drainage foundation | 15 | m3 | 249.52 ₹3,742.8 | 246.12 ₹3,691.8 Lowest |
| 2.00 | Plain Cement Concrete 1:4:8 mix (One part of Cement, Four part of Fine Aggregate and Eight part of Coarse Aggregate) Using 40mm ISS HBG metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28). | 0.8 | m3 | 5,382.73 ₹4,306.18 | 5,379.33 ₹4,303.46 Lowest |
| 3.00 | supply and erection of steel centering ,shuttering for soffits including necessary supports and strutting for all RCC works using MS sheets of suitable size of BG 10 stiffened with MS angle of size 25x25x3 mm for boarding laid over silver oak joists of size 10cmx6.5cm spaced at 90 cm c/c and supported by casurina props 10 cm - 13 cm spaced at 75 cm c/c etc complete and as directed by the departmental officers (Retrieved materials shall be taken back by the contractor after concrete is laid) | 103 | m2 | 871.44 ₹89,758.32 | 868.04 ₹89,408.12 Lowest |
| 4.00 | Brick work in CM1:5 mix using Country bricks size 8'3/4"x4'3/8"x2'3/4" including cost and conveyance and all labour charges therefore etc completed | 5 | cum | 7,210.53 ₹36,052.65 | 7,207.13 ₹36,035.65 Lowest |
| 5.00 | Supply and fabrication of steel including cost and conveyance of all materials including and all labour charges etc completed | 1,600 | kg | 92.88 ₹1,48,608 | 89.48 ₹1,43,168 Lowest |
| 6.00 | RCC 1:11/2:3 mix using ISS HBG 20mm metal including cost and conveyance of all materials to site and all other incidential charges etc completed | 11 | cum | 8,371.19 ₹92,083.09 | 8,367.79 ₹92,045.69 Lowest |
| 7.00 | Plastering in Cement Mortor 1:4 Mix (one cement, four sand) 12mm thick including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications. | 60 | m2 | 273.22 ₹16,393.2 | 269.82 ₹16,189.2 Lowest |
| 8.00 | Flooring with Ceramic tiles size 0.30x0.30m including cost and conveyance and all labour charges etc completed | 32 | m2 | 1,064.79 ₹34,073.28 | 1,061.39 ₹33,964.48 Lowest |
| 9.00 | Supply and fixing SS pipe 304 grade arrangements including cost and conveyance and all labour charges etc completed | 14 | m2 | 5,539 ₹77,546 | 5,535.6 ₹77,498.4 Lowest |
| 10.00 | Painting two coats with exterior Emulsion paint including cost and conveyance and all labour charges etc completed | 60 | m2 | 252 ₹15,120 | 248.6 ₹14,916 Lowest |
Tender Value
₹7.8 L
EMD Value
₹7,800
Closing Date
26 Jun 2025, 3:00 pmClosed
Executive Officer Town Panchayat Keelapavoor
7 Surandai Road Keelapavoor
Construction of Stage at Keelapavoor Townpanchayat office back side Community hall southside in Keelapavoor Town Panchayat.
2025_DTP_569242_1
101/2025/A1
Open Tender
Civil Works
Works
90 days
Keelapavoor Town Panchayat
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹7,800
22 Aug 2025
16 Jun 2025
26 Jun 2025
16 Jun 2025
26 Jun 2025
16 Jun 2025
Amount
Earth work excavating all classes of soils including all labour charges and all other charges etc complete as per SS 20 B for Drainage foundation
Plain Cement Concrete 1:4:8 mix (One part of Cement, Four part of Fine Aggregate and Eight part of Coarse Aggregate) Using 40mm ISS HBG metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28).
supply and erection of steel centering ,shuttering for soffits including necessary supports and strutting for all RCC works using MS sheets of suitable size of BG 10 stiffened with MS angle of size 25x25x3 mm for boarding laid over silver oak joists of size 10cmx6.5cm spaced at 90 cm c/c and supported by casurina props 10 cm - 13 cm spaced at 75 cm c/c etc complete and as directed by the departmental officers (Retrieved materials shall be taken back by the contractor after concrete is laid)
Brick work in CM1:5 mix using Country bricks size 8'3/4"x4'3/8"x2'3/4" including cost and conveyance and all labour charges therefore etc completed
Supply and fabrication of steel including cost and conveyance of all materials including and all labour charges etc completed
RCC 1:11/2:3 mix using ISS HBG 20mm metal including cost and conveyance of all materials to site and all other incidential charges etc completed
Plastering in Cement Mortor 1:4 Mix (one cement, four sand) 12mm thick including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications.
Flooring with Ceramic tiles size 0.30x0.30m including cost and conveyance and all labour charges etc completed
Supply and fixing SS pipe 304 grade arrangements including cost and conveyance and all labour charges etc completed
Painting two coats with exterior Emulsion paint including cost and conveyance and all labour charges etc completed
DHANESHWAR (BID ID -1382287)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .