Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 CrAccepted-AOC AMBALA CANTT | ₹4.2 Cr Quoted ₹3.9 Cr | L1 | Accepted-AOC Allotted |
| 2 | L2₹4.3 Cr+₹37.5 L (9.51%)Rejected-AOC SEWA NAGAR COLONY NEAR JOGIO KI DHARAMSHALA BHIWANI 127021 | BHIWANI | BHIWANI | HARYANA | 127021 | ₹4.3 Cr+₹37.5 L (9.51%) | L2 | Rejected-AOC EMD Release |
| 3 | L3₹4.4 Cr+₹41.8 L (10.6%)Rejected-Finance N A | ₹4.4 Cr+₹41.8 L (10.6%) | L3 | Rejected-Finance For EMD Release |
| 4 | L4₹4.4 Cr+₹50.7 L (12.9%)Rejected-Finance 1506 SECTOR 16 17 HISAR SECTOR 16 17 HISAR 125001 | HISAR | HISAR | HARYANA | 125001 | ₹4.4 Cr+₹50.7 L (12.9%) | L4 | Rejected-Finance For EMD Release |
Tender Value
₹4.4 Cr
EMD Value
₹8.8 L
Closing Date
7 Oct 2021, 5:00 pmClosed
SE Hisar and EE PD-1 PWD B and R Hisar
Rajgarh Road Opposite Congress Bhawan Hisar
Widening and Strengthening of Road from Dhand to Sadalpur (RD 0.00 to 6.930) in Hisar Distt. (Road ID 10777) (Under Nabard RIDF - XXVII Scheme)
2021_HRY_189561_1
Widening Strengthening of Road from Dhand to Sad
Open Tender
Civil Works
Item Wise
180 days
Hisar
Please refer Tender documents.
2 documents required · 2 mandatory
₹15,000
₹8.8 L
Yes
SE Hisar Circle PWD B and R Hisar
17 Jan 2022
24 Sept 2021
8 Oct 2021
24 Sept 2021
7 Oct 2021
24 Sept 2021
27 Sept 2021
Amount
Milling on Bituminous Surface Dismantling of existing damaged Bitumen surface by cold Milling Machine up to any depth and hauling the milled material up to any lead and stacking at nearest recycling Plant site (HSR 17.43.2)
Demolishing dry brick on end edging pitching in floors, drains etc. including stacking of serviceable material and disposal of unserviceable material within any lead. (HSR 17.75)
Excavation for roadwork in soil by manual/ mechanical means including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including breaking of clods and disposal with ROW as per technical clause 301 of MORT&H specifications (HSR 17.74)
Preparation of berms including filling of Earth work, excavation and cutting of earth in all kind of soils including dressing the bank, side slope to given levels and templates after breaking of clouds, including the cost of rolling and watering all allowances for labour hardness wetness irrespective of all lead and lift, but including Compensation for earth taken from private land, fields etc. and compacted to meet requirement of table 300-2 of MoRT&H specification clause No. 305 and to the entire satisfaction of the Engineer of the work conforming to PWD specification No. 6.2 and 6.3 and 3.2 and the other specification 1990 Ist edition. As per X-section attached at DNIT at Section -9. This item also includes E/W if required in sub grade for Widening and Shoulder. Earth used for sub grade, shoulder and berms should have minimum CBR of 8%. Note:- No earth work will be allowed to be taken from PWD B&R/ ROW except for surplus earth after approval from Engineer
Compaction of preparation of sub grade including loosening, levelling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 3000-2 as per techncial clause 305 of MORT&H Specifications (HSR 17.5.3)
Providing & laying 150 mm Granular Sub-Base with Coarse Graded Material - Grading-I (Table:- 400-2) Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.of MORT&H specifications. Grading I material (Based on HSR 17.15.1) Note: - 1.Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by the engineer.
Providing, laying 225mm WBM (G-II) 53 mm to 22.4 mm (75 mm each layer) , spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications (Based on HSR 17.23.2) Note: - 1.Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by the engineer.
Prime Coat @ 0.60kg per sqm Providing and applying primer coat with bitumen emulsion SSI on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means as per technical clause 503 of MORT&H specifications (Based on HSR 17.25)
Providing and applying tack coat with penetration grade bitumen VG - 10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom as per technical clause 503 of MORT&H specifications (HSR 17.26.2)
Providing & laying 50 mm BM using the reclaimed material to the extent of 30% per cent of the required quantity after carrying out necessary check and evaluation, adding fresh mateerial including rejuvenation as required, grade, level and thickness, all as specified in clause No.519. (5th revision) 2013 using bitumen VG-30 (minimum Bitumen content 3.4% i/c bitumen of retrieved material as per job mix formula) using Drum type hot mix plant with appropriate arrangement for use of R.A.P, appropriate roller and with hydraulic paver finisher with sensor control to the required grade. The milled material to be used in BM shall be minimum 80% of the theoretical quantity. Note:- If bitumen required is more than 3.4% as per job mix formula, no extra payment will be paid. Extra bitumen required will be considered as incidental to work. II - Before carrying out bituminous work, coating & stripping of bitumen aggregate mix is to be performed in accordance with IS – 6241. If coating and stripping of bitumen aggregate mix is less than 95%, anti-stripping agent will be used by contractor. The anti – stripping agent should conform to the requirement as stipulated in IS 14982:2017. The cost so incurred will be considered as incidental to work and nothing extra shall be payable. The type and brand of anti-stripping agent along with procedure shall be approved by SE-in-charge in writing before start of work. A proper record of results be maintained and same shall be submitted along with bills by the contractor.
Providing and laying bituminous macadam 50 mm thick with Drum type hot mix plant using crushed aggregates of specified grading premixed with bituminous binder VG - 30 @3.4% transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction complete as per technical clause 504 of MORT&H specifications Note:- If bitumen required is more than 3.4% as per job mix formula, no extra payment will be paid. Extra bitumen required will be considered as incidental to work. II - Before carrying out bituminous work, coating & stripping of bitumen aggregate mix is to be performed in accordance with IS – 6241. If coating and stripping of bitumen aggregate mix is less than 95%, anti-stripping agent will be used by contractor. The anti – stripping agent should conform to the requirement as stipulated in IS 14982:2017. The cost so incurred will be considered as incidental to work and nothing extra shall be payable. The type and brand of anti-stripping agent along with procedure shall be approved by SE-in-charge in writing before start of work. A proper record of results be maintained and same shall be submitted along with bills by the contractor.
Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of crushed stone aggregates of specified grading premixed in a continuous type of hot mix plant of appropriate capacity not less not less than 75 tonne per hour, with bituminous binder VG - 10 @ 1.46 kg per sqm, laid with Paver Finisher Mechanical and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades complete as per technical clause 510 of MORT&H specifications. (Based on HSR 17.33.1) II - Before carrying out bituminous work, coating & stripping of bitumen aggregate mix is to be performed in accordance with IS – 6241. If coating and stripping of bitumen aggregate mix is less than 95%, anti-stripping agent will be used by contractor. The anti – stripping agent should conform to the requirement as stipulated in IS 14982:2017. The cost so incurred will be considered as incidental to work and nothing extra shall be payable. The type and brand of anti-stripping agent along with procedure shall be approved by SE-in-charge in writing before start of work. A proper record of results be maintained and same shall be submitted along with bills by the contractor.
Providing and laying of premix sand seal coat premixed in continuous type HMP of appropriate capacity not less than 75 tonnes/ hours using specified fine aggregates and penetration grade bitumen @0.68 kg/sqm laid to specified levels, grade and cross fall complete as per technical clause 511 of MORT&H specifications. (Based on HSR 17.36.3)
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including Reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. (HSR 34.26)
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. (HSR 4.14)
Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. (HSR 10.100.2)
Brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinth in Cement Mortar 1:4 (1 cement : 4 coarse sand). (HSR 7.20.1)
Providing and Laying 600mm dia Reinforced cement concrete pipe NP3 prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets 1000 mm dia, as per clause 2900 of MORT&H specifications (HSR 17.61.1)
12 mm cement plaster of mix 1:4 (1 cement: 4 fine sand) (HSR 11.5.3)
Reinforced cement concrete M25 grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc complete as per technical clause 804 of MORTH Specifications (5th kilometre stone (precast) (HSR 34.27.1)
Reinforced cement concrete M25 grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc complete as per technical clause 804 of MORTH Specifications Kilometre Stone for Village Roads (HSR 34.27.3)
Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25-1967, fixed in position including finishing and lettering but excluding painting (HSR 34.28)
Overhead sign board 6000x1500mm cantilever type single sided as per IRC 67-2012 with retro reflective Sheeting as per ASTM D 4956 – 09 and as per IRC 67 – 2012 fixed over 4mm thick Aluminium Composite Material (ACM) sheeting having aluminium skin thickness of 0.4 to 0.5 mm on both sided and fixing the same with suitable size aluminium alloy rivets @ 200 mm c/c to back support frame of 40x40x6mm angle iron supported on designed single support system of MS pipe and plates in the form of a cantilever type truss made with 350NB pipe @50kg per metre as vertical support, 50NB pipe @ 4.50kg per metre and 40NB pipe @ 3.61kg per metre for truss including base plates, gusset plates, designed RCC foundation for fixing in ground complete as per clause 802 of MORT&H specifications. Supplier shall provide a warranty as per clause 6.9 of IRC 67-2012 for retro reflective sheeting & a certified copy of test reports from an independent test laboratory including three year outdoor weathering test report for sheeting tested in India condition conforming to clause 6.7 of IRC 67-2012 . (HSR 34.20)
Advance Direction sign/Public Information board 900x900 square as per IRC 67- 2012 with retro reflective Sheeting as per ASTM D 4956 09 and as per IRC 67 2012 fixed over 4 mm thick aluminium Composite material (ACM) sheeting having aluminium skin thickness of 0.4 to 0.5 mm on both sided and fixing the same with suitable size aluminium alloy rivets @ 200 mm c/c to back support frame of 25x25x3mm angle iron supported on a square hollow steel section post 60x60x3.2mm conforming to IS 4923 without cost of definition plate firmly fixed to ground in foundation concrete M-25 of size 0.45x0.45x0.75m for vertical post complete as per clause 801 of MORT&H specifications. Supplier shall provide a warranty as per clause 6.9 of IRC 67-2012 for retro reflective sheeting & a certified copy of test reports from an independent test laboratory including three year outdoor weathering test report for sheeting tested in India condition conforming to clause 6.7 of IRC 67-2012 Using retro reflective Sheeting Class C as per IRC 67 2012(HSR 34.12 .1)
Recovery items: The rates quoted against recovery items will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. i) Material obtained on Brick work have been calculated taking assumption that 80% of theoretical material will be retrieved. The scarified material will be issued for use in any of the item for the work after modification (bringing it to required specifications) as per approval of employer. In case it is not possible to use this material on the work, the agency can take away this material after approval from employer. This material will be issued at the price quoted by the agency or reserve price whichever is high. The reserve price is as under:- (i) Good Bricks @ Rs. 5.00/- per Each
Brick Bats @ Rs. 500/- per Cum. Note: All quantities of the above materials have been worked out on the basis of theoretical quantities laid on this road. However, agency may visit site before quoting rates and assess the extent of retrieved material. There shall be no measurement after actual scarifying and if material after scarifying is found on lesser side, no claim of agency on this score will be entertained and full recovery on the basis of quoted rate and quantity exhibited in the BOQ shall be made. The reserve rates are minimum rates to be used as base for quoting purchase rate by the agency. No rates below the reserve price will be entertained and reserve price will be considered for all purposes in case the agency quotes lesser than reserve price. 1. In case of any differnece in the unit & nomenclature of any of the DSR item of Civil, P.H. work depicted in this DNIT and that given in DSR, the unit and nomenclature given in DSR shall be applicable. 2. Only reputed make material will be used (make-brand exhibited in DSR and exhibited in approved standard document) as approved by Engineer-in-charge, while executing various items/works at site. 1.In case of any discrepancy in nomenclature/ unit of items of BOQ depicted in the DNIT, the nomenclature/ unit of MoRTH/ HSR & NS items shall be applicable as per norms. 2. Unit rates and prices shall be quoted by the bidder in Indian rupees [ITB Clause 14.1]. 3. For routine maintenance, the unit rate indicated by the authority shall apply. The bidder is required to accept these rates. Further, the payment shall be performance based. 4. It may kindly be noted that the contractor would be obligated to carry out 05 years paid maintenance of Rs. 28.76 lacs as per the fixed rates mentioned as Annexure-‘A’ in the DNIT. However, the item of 05 years maintenance shall not be part of BOQ to avoid any confusion.
Vijay Kumar Contractor
HARYANA BUILDERS
MAHENDER SINGH CONTRACTOR
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .