Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical UKHRA BARDHAMAN BARDHAMAN 713363 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713363 | Accepted-Technical Accepted |
| 2 | Accepted-Technical FANDANESWAR BALDER PARA PASCHIM BARDHAMAN PASCHIM WEST BARDWAN BARDHAMAN 713346 WEST BENGAL INDIA | PASCHIM BARDHAMAN | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | Accepted-Technical Accepted |
| 3 | Accepted-Technical C O SIKDER P O JHANJRA JHANJRA JHANJRA 713385 WEST BENGAL INDIA | JHANJRA | PASCHIM BARDHAMAN | WEST BENGAL | 713385 | Accepted-Technical Accepted |
Tender Value
₹6.4 L
EMD Value
₹8,100
Closing Date
8 Jul 2026, 6:00 pmClosed
AREA SAFETY OFFICER, JHANJRA AREA
OFFICE OF THE GENERAL MANAGER, JHANJRA AREA, PO-LAUDOHA, BO, DIST. - PASCHIM BARDHAMAN, PIN-713385
Construction of 03 Nos ventilation Door of R VI seam at MIC Unit under JPC
2026_ECL_361256_1
ECL/GM/JNR/MIN.A/26-27/04 Dt. 20.06.2026
Open Tender
Civil Works - Others
Percentage
30 days
Jhanjra Project Colliery
PLEASE REFER TO TENDER DOCUMENTS
4 documents required · 4 mandatory
₹8,100
4 Aug 2026
22 Jun 2026
10 Jul 2026
22 Jun 2026
8 Jul 2026
23 Jun 2026
22 Jun 2026 - 29 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Discription of work: Construction of 03 Nos ventilation Door at -3L/7D & 8D (02 nos.) and -5L/4D & 5D (01 no.) of R-VI seam at MIC Unit under JPC | |||||
| 1.01 | Recess cutting by hand in soft stone | 1.37 | CUM | 5,519.27 | ₹7,561.4 |
| 1.02 | Recess cutting by hand in coal | 1.24 | CUM | 1,969.67 | ₹2,442.39 |
| 1.03 | Stone fall cleaning & stacking in regular stack | 3.39 | CUM | 746.81 | ₹2,531.69 |
| 1.04 | Brick work in cement mortar ( cement & sand) with fly ash bricks | 6.14 | CUM | 7,781.7 | ₹47,779.64 |
| 1.05 | Cement plaster (1:6) both sides, less for door | 30.72 | SQM | 481.5 | ₹14,791.68 |
| 1.06 | Cleaning for site preparation | 386.1 | CUM | 746.81 | ₹2,88,343.34 |
| 1.07 | Structural steel work in single section, fixed with or without connectiong plate, including cutting, hoisting, fixing in position and applying a printing coat of approved steel primer all complete( only labour part material will be supplied by the department) | 762.3 | KG | 72.7 | ₹55,419.21 |
| 1.08 | Structural steel work in single section, fixed with or without connectiong plate, including cutting, hoisting, fixing in position and applying a printing coat of approved steel primer all complete | 887.92 | KG | 138.75 | ₹1,23,198.9 |
| 1.09 | Loading material (bricks) into MUV and unloading at UG | 2.41 | Per 1000 | 900 | ₹2,166.3 |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.21 MB
Tendernotice_2.pdf
PDF • 0.78 MB
BOQ_374135.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .