Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹82.4 LAdmitted-Finance | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Microflow Devices India Pvt Ltd L1 |
|---|---|---|---|---|
| 1.00LUMP SUM CONTRACT PRICE LIST | ||||
| 2.00 | Cost of Financial Bid for Design, Construction, Testing, Commissioning and Validation of TB Containment Laboratory and associated works with two-year warranty as per RNTCP specification | 1 | Nos | 44,04,549.15 ₹51,97,368 Lowest |
| 3.00 | Cost of additional works as per Scope of work | 1 | Nos | 3,95,000 ₹4,66,100 Lowest |
| 4.00Cost of Comprehensive Maintenance Services after completion of warranty period of 2 years | ||||
| 5.00 | 1st Year | 1 | Nos | 1,27,118.64 ₹1,50,000 Lowest |
| 6.00 | 2nd Year | 1 | Nos | 1,69,491 ₹1,99,999.38 Lowest |
| 7.00 | 3rd Year | 1 | Nos | 2,11,864.41 ₹2,50,000 Lowest |
| 8.00 | Supply and installation of Three Class II A2 BSC with thimble canopy and with three 3 KVA Online UPS with two-year warranty | 1 | Nos | 15,00,000 ₹17,70,000 Lowest |
| 9.00Cost of Comprehensive Maintenance Services after completion of warranty period of 2 years (For BSC & UPS) | ||||
| 10.00 | 1st Year | 1 | Nos | 42,372 ₹49,998.96 Lowest |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
20 Nov 2020, 3:00 pmClosed
Director of Health Services
Directorate of Health Services, Port Blair
ETENDER FOR THE CONSTRUCTION, TESTING, COMMISSIONING AND VALIDATION OF TB CONTAINMENT LABORATORY AND ASSOCIATED WORKS IN INTERMEDIATE REFERENCE LABORATORY (IRL), GB PANT HOSPITAL, PORT BLAIR
2020_DHS_1381_1
1-22/DHS/RNT/TBDST/2018/942
Open Tender
Equipments (Hospital / Lab)
Supply
180 days
GB Pant Hospital
Please refer Tender documents.
14 documents required · 14 mandatory
₹0
₹1.3 L
Yes
2 Dec 2020
30 Oct 2020
20 Nov 2020
30 Oct 2020
20 Nov 2020
8 Nov 2020
LUMP SUM CONTRACT PRICE LIST
Cost of Financial Bid for Design, Construction, Testing, Commissioning and Validation of TB Containment Laboratory and associated works with two-year warranty as per RNTCP specification
Cost of additional works as per Scope of work
Cost of Comprehensive Maintenance Services after completion of warranty period of 2 years
1st Year
2nd Year
3rd Year
Supply and installation of Three Class II A2 BSC with thimble canopy and with three 3 KVA Online UPS with two-year warranty
Cost of Comprehensive Maintenance Services after completion of warranty period of 2 years (For BSC & UPS)
1st Year
2nd Year
3rd Year
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .