Loading…
Loading…
Tender Value
₹1.6 Cr
EMD Value
₹2.3 L
Closing Date
6 Feb 2026, 12:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
ELE/GEN
29 conditions · 15 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less, ; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet. Annexure -VIB Reference -Para 10.2 & 17.15.2 of Tender Form (Second Sheet) of Annexure I of ITT Each Bidder or each member of a JV must fill in this form separately: NAME OF BIDDER/JV PARTNER: Annual Contractual Turnover Data for the Previous 3/4 Years (Contractual Payment only) YearAmount CurrencyExchange RateIndian National Rupees Equivalent Average Annual Contractual Turnover for last 3 years 1.The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. 2.The information supplied shall be substantiated by data in the audited balance sheets and profit and loss accounts for the relevant years in respect of the bidder or all members constituting the bidder. 3.Contents of this form should be certified by a Chartered Accountant duly supported by Audited Balance Sheet duly certified by the Chartered Accountant. SEAL AND SIGNATURE OF THE BIDDER Certified that all figures and facts submitted in this form have been furnished after full consideration of all observations/notes in Auditor's reports._____________________ (Signature of Chartered Accountant) Name of CA:______________ Registration No: ______________ (Seal)
Current and valid Electrical & Supervisory License: Bidder/Tenderer should submit valid and current electrical license and Electrical Supervisory license issued from State/Central Govt licensing board for the required voltage level to work at proposed location in tender, Otherwise offer will not be considered for further action and your offer will be summarily rejected. Tenderer has electrical contractor's license for the voltage that is highest in the complete work . (CEGE/ECR/HJP's letter no. ECR/ELE/G/Tender policy/1670 dt 17.02.2022).
PF Code issued from EPFO & UAN No. of workers: Contractor should have to be registered with Employee Provident Fund Organization (EPFO). It is mandatory for contractor to submit PF code provided by EPFO with their tender offer. Also each contractor have to submit "UAN" of their worker with their offer and have to mention in tender document. It is mandatory. Otherwise offer will not be considered for further action and your offer will be summarily rejected.
Multiple L-1: In case of more than one L-1 bidders, tender may be awarded to tenderer having higher Bid capacity. In case Bid capacity is also same, tenderer having done more value of similar nature work in last three previous years and the current financial yeat up to the date of opening of the tender, may be selected for the award. (Rly Bd's letter no. 2017/Trans/01/Policy dated 08.02.2018).
GCC: The contract shall be governed by Standard General condition of contract: APRIL- 2022 for works contract issued by Railway and amendment/corigendum from time to time from the date of opening and Model SOP for work matter. Bidders/Tenderers are responsible for knowledge of GCC and its amendment. Labour laws to be followed by the contractor including any compensation to the labour for any damage or loss Railway will not be responsible.
Tenderer Credentials: For tenderer credentials tenderer have to full fill the Para 10 of the Tender Form (Second Sheet) of GCC: April 2022.
Documents to be Submitted Along with Tender: Tenderer should have to follow Para 14 & Para 18 of the Tender Form (Second Sheet) GCC: April 2022.
Care in Submission of Tenders: The tenderers shall submit a copy of certificate stating that all their statements/documents submitted alongwith bid are true and factual. On IREPS Module, a facility has already been created for online submission of Annexure-V. Therefore, the provision of downloading of Annexure-V of GCC & uploading of physically signed Annexure-V by the tenderer has been discontinued on IREPS. Non submission of above certificate by the bidder shall result in summarily rejection of his/their bid. It shall be mandatorily incumbent upon the tenderer to identify, state and submit the supporting documents duly self attested/digitally signed by which they/he is qualifying the Qualifying Criteria mentioned in the Tender Document.
Care in Submission of Tenders: (a) (i)Before submitting a tender, the tenderer will be deemed to have satisfied himself by actual inspection of the site and locality of the works, that all conditions liable to be encountered during the execution of the works are taken into account and that the rates he enters in the tender forms are adequate and all inclusive to accord with the provisions in Clause-37 of the Standard General Conditions of Contract for the completion of works to the entire satisfaction of the Engineer. (a)(ii)Tenderers will examine the various provisions of The Central Goods and Services Tax Act, 2017(CGST)/ Integrated Goods and Services Tax Act, 2017(IGST)/ Union Territory Goods and Services Tax Act, 2017(UTGST)/ respective state's State Goods and Services Tax Act (SGST) also, as notified by Central/State Govt.& as amended from time to time and applicable taxes before bidding. Tenderers will ensure that full benefit of Input Tax Credit (ITC) likely to be availed by them is duly considered while quoting rates. (a) (iii)The successful tenderer who is liable to be registered under CGST/IGST/UTGST/SGST Act shall submit GSTIN along with other details required under CGST/IGST/UTGST/SGST Act to railway immediately after the award of contract, without which no payment shall be released to the Contractor. The Contractor shall be responsible for deposition of applicable GST to the concerned authority.
Tenderer Credentials: (i)A copy of certificate stating that they are not liable to be disqualified and all their statements/documents submitted along with bid are true and factual. Non submission of a copy of certificate by the bidder shall result in summarily rejection of his/their bid. It shall be mandatorily incumbent upon the tenderer to identify, state and submit the supporting documents duly self attested / digitally signed by which they/he are/is qualifying the Qualifying Criteria mentioned in the Tender Document. (ii)The Railway reserves the right to verify all statements, information and documents submitted by the bidder in his tender offer, and the bidder shall, when so required by the Railway, make available all such information, evidence and documents as may be necessary for such verification. Any such verification or lack of such verification, by the Railway shall not relieve the bidder of its obligations or liabilities hereunder nor will it affect any rights of the Railway there under. (iii)(a) In case of any information submitted by tenderer is found to be false, forged or incorrect at any time during process for evaluation of tenders, it shall lead to forfeiture of the tender Bid Security besides banning of business for a period of upto five years. (b) In case of any information submitted by tenderer is found to be false, forged or incorrect after the award of contract, the contract shall be terminated. Bid Security, Performance Guarantee and Security Deposit available with the railway shall be forfeited. In addition, other dues of the contractor, if any, under this contract shall be forfeited and agency shall be banned for doing business for a period of upto five years.
Documents to be Submitted Along with Tender (i)The tenderer shall clearly specify whether the tender is submitted on his own (Proprietary Firm) or on behalf of a Partnership Firm / Company / Joint Venture (JV) / Registered Society / Registered Trust / Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc. The tenderer(s) shall enclose the attested copies of the constitution of their concern, and copy of PAN Card along with their tender. Tender Documents in such cases are to be signed by such persons as may be legally competent to sign them on behalf of the firm, company, association, trust or society, as the case may be. (ii)Following documents shall be submitted by the tenderer: (a)Sole Proprietorship Firm: (i)All documents in terms of Para 10 of the Tender Form (Second Sheet) above. (b)HUF: (i)A copy of notarized affidavit on Stamp Paper declaring that he who is submitting the tender on behalf of HUF is in the position of 'Karta' of Hindu Undivided Family (HUF) and he has the authority, power and consent given by other members to act on behalf of HUF. (ii)All other documents in terms of Para 10 of the Tender Form (Second Sheet) above. (c)Partnership Firm: (i)All documents as mentioned in para18 of the Tender Form (Second Sheet). (d)Joint Venture (JV): All documents as mentioned in para 17 of the Tender Form (Second Sheet). (e)Company registered under Companies Act2013: (i)The copies of MOA (Memorandum of Association) / AOA (Articles of Association) of the company (ii)A copy of Certificate of Incorporation (iii)A copy of Authorization/Power of Attorney issued by the Company (backed by the resolution of Board of Directors) in favour of the individual to sign the tender on behalf of the company and create liability against the company. (iv)All other documents in terms Para 10 of the Tender Form (Second Sheet) above.
(f)LLP (Limited Liability Partnership): (i)A copy of LLP Agreement (ii)A copy of Certificate of Incorporation (iii)A copy of Power of Attorney/Authorization issued by the LLP in favour of the individual to sign the tender on behalf of the LLP and create liability against the LLP. (iv)An undertaking by all partners of the LLP that they are not blacklisted or debarred by Railways or any other Ministry / Department of the Govt. of India from participation in tenders / contracts as on the date of submission of bids, either in their individual capacity or in any firm/LLP or JV in which they were / are partners/members. Concealment / wrong information in regard to above shall make the contract liable for determination under Clause 62 of the Standard General Conditions of Contract. (v)All other documents in terms of Para 10 of the Tender Form (Second Sheet).
(g)Registered Society & Registered Trust: (i)A copy of Certificate of Registration (ii)A copy of Memorandum of Association of Society/Trust Deed (iii)A copy of Power of Attorney in favour of the individual to sign the tender documents and create liability against the Society/Trust. (iv)A copy of Rules & Regulations of the Society (v)All other documents in terms of Para 10 of the Tender Form (Second Sheet) above. (iii)If it is NOT mentioned in the submitted tender that tender is being submitted on behalf of a Sole Proprietorship firm / Partnership firm / Joint Venture / Registered Company etc., then the tender shall be treated as having been submitted by the individual who has signed the tender. (iv)After opening of the tender, any document pertaining to the constitution of 11.1.1 Sole Proprietorship Firm / Partnership Firm / Registered Company/ Registered Trust / Registered Society / HUF/LLP etc. shall be neither asked nor considered, if submitted. Further, no suo moto cognizance of any document available in public domain (i.e., on internet etc.) or in Railway's record/office files etc. will be taken for consideration of the tender, if no such mention is available in tender offer submitted. (v) A tender from JV shall be considered only where permissible as per the tender conditions. (vi)The Railway will not be bound by any change of power of attorney or in the composition of the firm made subsequent to the submission of tender. Railway may, however, recognize such power of attorney and changes after obtaining proper legal advice, the cost of which will be chargeable to the Contractor.
Penalty for cutting/damaging the Railway cable by firm/contractor/agency (As per HQ JPO policy NO. e-file, ECR-HQoSnT (GENL)/41/2020(5954) Dated- 21/05/2024 and vide issued Chief Telecom Engineer letter No. ECR/S&T/e-file 5954 dated 03.07.2024): (i)Penalty should be levied on the contractor when they work without permission or resort to careless working without making proper arrangements for protecting cables and other utilities. Level of Penalty to be imposed for damages to cable/utilities shall be as under: Cable DamagedPenalty per location (Rs.) Only Quad cable or Signaling cable 1.0 Lakh Only OFC 1.25 Lakh Both OFC & Quad 1.5 Lakh Electrical Cable 1.0 Lakh Telecom PIJF Cable 0.5 Lakh (ii)Necessary debit in this regard will be raised by the cable/utility owing department on the executing agency undertaking the work, who shall levy and recover the penalty from the defaulting contractor. The executing agency may make necessary provision in the contract to enforce the penalty. (iii)For penalty to be imposed for each cable cut, a joint report should be prepared on the same day at the level of supervisors of executing unit and affected unit. Responsibility of unit to be fixed based on the joint sketch. If supervisor of executing unit refrain from signing of the joint note the DAR action may be initiated by concerned department against the associated supervisor. (iv)The defaulting contractor/agency/unit (on basis of penalty imposed based on joint report) may appeal against the penalty. For this, they may apply to ADRM of the division through proper channel within one month of receiving the penalty notice along with complete documents and detailed justification. ADRM may enquire over the matter and decide on the appeal after consulting all concerned department/documents. In case where defaulting contractor has extended help in restoration, the penalty can be reduced to an extent as deemed fit by ADRM. Decisions taken by ADRM shall be final and also be binding on all parties. (v)In case of cable cut/damage due to miscreant activity or anyone working without permission then an information to be given by divisional Control of affected department of Security Control in division for instant preventive action followed by formal complaint by concerned SSE/JE of affected unit to concerned RPF Post for registration of criminal case. Thereafter, joint report should be prepared on the same day at the level of supervisors of RPF and affected unit (owner unit of asset). Case registered by RPF, being a legal procedure at disposal of the Court, would not be withdrawn.
It is mandatory for contractor to submit PF code provided by EPFO and ESIC certificate with their tender offer. Otherwise offer will not be considered for further action and your offer will be summarily rejected.
29 conditions · 4 needing a document upload
PAYMENT (Terms and conditions):- 1. The executed work will be jointly checked by the Electrical supervisor and representative of the contractor. 2. After completion of the work, firm is to under take guarantees for one year from the date of completion and guarantee certificate should accompany the bill 3. 2% Income Tax will be deducted from the bill. 4. 1% labour cess will be deducted. 5. GST will be applicable as per extent rule on the total value of the work or deduction will be made from the bills in accordance with the GST rules as applicable. 6. Security deposited should be kept for a period of 12 months and will be released after satisfactory performance during the guarantee period. 7. Released materials should be returned to the concerning supervisor and a copy of the receipt should accompany the bill. 8. Indemnity bond should be submitted during on account payment and in case of repair of electrical assets /DG sets. 9. Test certificate of manufacturer/dealers in case of machinery and plants should submit along with the bill. 10. The contractor shall arrange at his own cost all tools, plants facilities necessary for reconditioning and testing of the equipments. 11. The materials mentioned in the tender work schedule should be inspected by the authorized representative of Sr. DEE/G/DNR prior to execution of the work in the premises of manufacturer/authorized dealer and the copy of the inspection report duly signed by contractor/ authorized signatory representative should accompany the bill.
Payment of running bills: (I) For maintenance and manning work -Payment will be made four/six times in a year. 100% payment will be made for each completed period/Schedule subject to deduction of security deposit, penalty and damage if any. S.D. will be released with the final bill where material supply is not involved or retained for one year after completion of work (for cost of materials supplied) as security deposit if material supply is involved or as per condition given in the scope of work. (II) In case of supply, installation, testing and commissioning or repairing work following payment procedure will be adopted:- (i). 85% payments will be made against supply of materials. (ii). 100% on account payment shall be made to the contractor on against supply of the materials in which the erection part is not included or there is separate rate schedule for erection. (Material supplied will be in good condition as per specification and make with production of material inspection certificate and delivery challan. (III) 100% payment will be made for against full execution of any rate schedule item either supply and erection or erection on submission of certificate by site engineer that installation has been completed. (If 85% payment was made earlier against supply, balance 15% will be paid after erection in case of supply and erection. (IV) 1.) In case of major items such as Lift or escalator 90% on account payment will be made only after successful supply, installation, testing and commissioning of above equipment. 2). 50% payment will be done against supply of material only. Balance 40% payment will be released after erection, testing and commissioning of the Lift or escalator. 3.) Balance 10% will be released with final bill only. (V) Firm has to submit the monthly payment statement to the labour/skilled/un-skilled manpower engaged to execute the work indicating their UAN number, ESIC no, PF contribution before raising any bill as uploaded on EPFO website. Without these details the bill will not be passed. 13. Material Challan from manufacturer/dealer should be submitted along with the bill. 14. Tenderers should quote their own labour and materials against schedule of items of works which should provide for supply of all materials tools and plants and other equipments whatsoever including all handling, freight lead to the site of work and tax thereon. 15. The quantities are approximately for the purpose of tender only payment will be made for actual quantity of work done. 16. Any damages caused to buildings or any other assets belonging to Railway administration during the period of works shall be made good the contractor to the extant determined by the Administration failing which the administration will be entitle to realize such cost from the contractor in any manner decided by. 17. No claim will be entertained for any fluctuation of market rate in respects of labour and materials. 18. No passes will be issued against this contract and tenderer is supposed to work in the whole jurisdiction of the Sr. Divisional Electrical Engineer(G) at their own cost. 19. The contractor must pay fair wages to their labour in keeping with the minimum wages issued by Chief Labour Commissioner from time to time. 20. The contract will be governed by the General Condition of contract and standard specification 1969 edition as amended. NOTE: Rate mentioned in the para no. 3,4,5 are liable to change. These will be changed as per guideline.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Inclusion of 'Letter of Credit' as Mode of Payment in Works Tenders or Service Tenders as per Railway Board's letter no. 2018/CE-I/CT/9 dated 04.06.2016 remarks from Tenderer required.
No manual tender/offer sent by post/fax/courier/in person shall be accepted. No post tender correspondence shall be entertained after closing the tender even suo moto post tender letters of the tenders shall be treated as null/void.
The tender are required to observe the website to find out if any correction slip issued subsequent to uploading of the tender. Railway reserve the right to make any additions /alteration to the tender uploaded and issue corrigendum to the same effect. In case the tenderer fails to make notice of the above corrigendum, additions and alterations enterd/effected in the corrigendum shall be biding upon the tender and no claim what so ever will be entertained by railway.
The Railway reserves the right to very all the statement, information and documents submitted by the bidder in his tender offer, and the bidder shall, when so required by the Railway, make available all such information evidence and documents as may be necessary for such verification. Any such verification all lack of such verification, by the railway shall not relieve the bidder of its obligations or liabilities here under not will it affect any rights of the Railways thereunder.
In case of any wrong information submitted by the tenderer, the contract shall be terminated, earnest money deposit (EMD). performance guarantee (PG) and Security deposit (SD) of the contract forfeited and agency barred for doing business on entire Indian Railways for five years.
Please submit your bank details i.e Name of Bank along with Bank Branch Code, Accounts number as appearing in the cheque book, IFSC code and PAN number, duly certified by the authorized official of the bank, to facilitate payment through ECS/NEFT/RTGS. In lieu of the Bank certificate photocopy/scanned copy of a cancelled cheque and Pan card may be attached for verification of the above particulars. Otherwise, the tender will be summarily rejected.
The tenderer has to upload the supportive documents against the 'Type of Firms' as mentioned below: 'Sole Proprietorship Firm: Notarized affidavit claiming the firm to be a sole proprietor firm 'Company: MOA, AOA, Power of attorney' Partnership Firm: Deed of Partnership, Power of attorney and an Undertaking for not being Blacklisted/Debarred as per Annexure-A: otherwise the offer of the tenderer will be summarily rejected.
Eligibility criteria for works tender in respect of partnership firms:-
in case the tenderer is a partnership firm s , the experience, solvency and turn over shall be in the name and style of the firm only.
If the tenderer is a partnership firm, all the partners shall be jointly and severally liable for successful completion of the work and no request for change on the certification of the firm shall be entertained.
During the currency of the contract, no partner of the firm shall be permitted to withdraw from partnership business and in such and event it shall be treated as breach of trust and abandonment of the contract.
JOINT VENTURE will not be permitted for the tenders.
Any Conditional offer will be summarily rejected.
For those conditions for which standard formats have been given in the uploaded document titled-Formats for uploading of various format. The information should only be submitted in these standard formats.
Rates are inclusive of all taxes/GST, license fee, royalty charges etc. legally leviable by State, Central Govt. and/or any other local authority.
Earnest Money and Tender Document Cost: -All the tenderers / Contractors have to deposit full earnest money and tender document cost as stipulated in the tender document through online modes as permitted in IREPS application.
Railway Administration reserves the right to change/Alter/Cancel the tender without any notice.
Provision of electrical wiring, lighting and other electrical assets required for shifting of railway structures for construction of Danapur-Bihta elevated corridor.
EL-50-DNR-OPEN-43-2025-26~ECR
EL-50-DNR-OPEN-43-2025-26
Open
Works - General
180 Days
Patna, Bihar
₹0
₹2.3 L
6 Feb 2026
13 Jan 2026
23 Jan 2026
65 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 1,58,03,433 | ||
| — | 2000.00 | — | — | ||
| Erection of HT/LT underground cable including earthing through machine (HDD) including grounding 4/3 core 50-185 sqmm aluminium conductor XLPE insulated cable suitable for power supply system. | — | — | — | 15,48,000 | |
| — | 2000.00 | — | — | ||
| Supply, fixing, testing and commissioning of 25 mm dia PVC rigid plain conduit of insulating materials of heavy duty conforming to IS: 9537/Part-3 (Latest version) including all accessories like bend, elbow, juction box, etc in recess/surface under the platform shed/truss as per IS/IE rules and site requirement. | — | — | — | 48,000 | |
| — | 2000.00 | — | — | ||
| Supply, laying and fixing, testing and commissioning of 1.0 sqmm FRLS, PVC insulated multi stranded copper conductor single core cable 1100 Volts conforming to IS:694 (latest version) make- Finolex, Havells, Polycab, KEI or equivalent in other make in the existing PVC conduit for wiring of point wiring/circuit wiring/earth wiring as per requirement as per IS & IE rules. | — | — | — | 16,000 | |
| — | 4000.00 | — | — | ||
| Supply, laying and fixing, testing and commissioning of 1.5 sqmm FRLS, PVC insulated multi stranded copper conductor single core cable 1100 Volts conforming to IS:694 (latest version) make- Finolex, Havells, Polycab, KEI or equivalent in other make in the existing PVC conduit for wiring of point wiring/circuit wiring/earth wiring as per requirement as per IS & IE rules. | — | — | — | 44,000 | |
| — | 324.00 | — | — | ||
| Supply, fixing, testing and commissioning of 3-pin ceiling rose 5 Amp capacity on existing MS/PVC coduit junction boxes/casing caping make- Anchor, Cona, Kinjal, SSK or equivalent as per IS, IE rules and site requirement. | — | — | — | 3,888 | |
| — | 1250.00 | — | — | ||
| Wiring of Light point, call bell , Exaust fan and 5 A plug point in a concealed with a heavy gauge PVC conduit pipe conforming to IS 9537 (pt.3)/1983 or latest, ISI mark with single core 1.5 Sqmm copper FRLS wire (make - Anchor, Finolex, Havells, KEI, Polycab) complete with controlling modular switches and suitable board of Legrand, Siemens, L&T, Anchor, ABB, Havells, Crabtree make and 16 SWG tinned copper wire as ECC | — | — | — | 5,18,750 | |
| — | 450.00 | — | — | ||
| Wiring of fan point with regulator in a concealed with a heavy gauge PVC conduit pipe conforming to IS 9537 (pt.3)/1983 or latest, ISI mark with single core 1.5 Sqmm copper FRLS wire (make - Anchor, Finolex, Havells, KEI, Polycab) complete with controlling modular switches and suitable board of Legrand, Siemens, L&T, Anchor, ABB, Havells, Crabtree make and 16 SWG tinned copper wire as ECC. | — | — | — | 1,89,000 | |
| — | 652.00 | — | — | ||
| Supply and erection of 5 A 5 pin modular switch-socket on light and fan control switch board including stranded PVC insulated copper wire conforming to IS:694, FRLS and its Connection, testing & commissioning. All materials required for the job shall be supplied by contractor. Material shall be of ISI approved make. Make: Legrand, Siemens, L&T, Anchor, ABB, Havells, Crabtree. | — | — | — | 22,168 | |
| — | 117.00 | — | — | ||
| 15 A 6 pin modular socket point on separate circuit and modular board: Supply of modular switch socket & fuse point and fixing, testing and commissioning on separate circuit and suitable board and wiring in concealed PVC conduit by using 4 sqmm multistrand copper wire for phase and neutral & 1 x 1.5 sqmm PVC insulated multi-stranded copperwire for earth from MDB/SDB/Board to this separate board. All material required for the job shall be supplied by contractor, Proper colour coding as per IE rules should be followed for wiring. Make: Legrand, Siemens, L&T, Anchor, ABB, Havells, Crabtree | — | — | — | 29,484 | |
| — | 9800.00 | — | — | ||
| Wiring of sub-main concealed in PVC heavy gauge conduit pipe of size (O.D.) 20mm make-Malhotra or similar ISI make complete with PVC insulated 2x4.00 sqmm FR/HRFR/FRLS single core multistrand flexible copper conductor/wire unsheathed 1100 volt confirming to IS: 694(latest version) make-Anchor, Havells,Finolex,KEI or polycab with ECC 16 SWG/01 sqmm multi strand single core flexible copper earth wire. In case of celling/beam/column where cutting is not allowed/ possible wiring to be done in open conduit/casing capping by use of drill & roll plug. | — | — | — | 10,87,800 | |
| — | 2500.00 | — | — | ||
| Wiring of sub-main concealed in PVC heavy gauge conduit pipe of size (O.D.) 20mm make-Malhotra or similar ISI make complete with PVC insulated 2x6.00 sqmm Heat Resistant flame retardant (HRFR) single core multistrand flexible copper conductor/wire unsheathed 1100 volt confirming to IS: 694/1990 make-Anchor, Havells,Finolex,KEI or polycab with ECC 16 SWG/01 sqmm multi strand single core flexible copper earth wire. In case of celling/beam/column where cutting is not allowed/ possible wiring to be done in open conduit/casing capping by use of drill & roll plug. | — | — | — | 4,70,000 | |
| — | 220.00 | — | — | ||
| Supply,fixing,testing and commissioning of modular AC box with MCB with matching galvanized iron frame and polycarbonate cover plate accomodating 3 module (1x1x3M) suitable for 230V, 50 Hz supply Make- Legrand, Havells, Crabtree, Wipro, Cona, Anchor, L&T or equivalent as per IS & IE rules. | — | — | — | 1,00,980 | |
| — | 140.00 | — | — | ||
| Supply of Multi compressor (Rotary/Scroll) outdoor units with condenser unit, fan unit, piping, wiring, connections, control relay units, capacitors, insulated copper piping for condensed gas and liquid suction and delivery copper pipe lines (indoor to outdoor), infrigerant gas pipe joints and multiooting joints, XLPE insulated copper power cables of suitable sizes for coneection with the power panel etc suitable for reversible cycle operations (Heating & Cooling) and filtered fresh air handling/supply system including ducting etc as required for different air conditiones areas. Make: LG, Daikin, Bluestar, Hitachi. Here qty. Unit Job stands for TR. | — | — | — | 58,72,020 | |
| — | 70.00 | — | — | ||
| Supply of 2 Tr Hi-wall Indoor units suitable for reversible cycle operation. Make: LG, Daikin, Bluestar, Hitachi. | — | — | — | 22,17,180 | |
| — | 140.00 | — | — | ||
| Installation, testing and Commissioning of Multi compressor (Rotary/Scroll) outdoor units with condenser unit, fan unit, piping, wiring, connections, control relay units, capacitors, insulated copper piping for condensed gas and liquid suction and delivery copper pipe lines (indoor to outdoor), infrigerant gas pipe joints and multiooting joints, XLPE insulated copper power cables of suitable sizes for coneection with the power panel etc suitable for reversible cycle operations (Heating & Cooling) and filtered fresh air handling/supply system including ducting etc as required for different air conditiones areas. Make: LG, Daikin, Bluestar, Hitachi. Here qty. Unit Job stands for TR. | — | — | — | 5,42,920 | |
| — | 70.00 | — | — | ||
| Installation, testing and commissioning of Hi-wall indoor units suitable for reversible cycle operation. Make: LG, Daikin, Bluestar, Hitachi. | — | — | — | 1,35,730 | |
| — | 180.00 | — | — | ||
| Supply and fixing of PVC drain pipe of 25MM dia with 6mm thick nitrile Rubber Insulation tube. | — | — | — | 30,060 | |
| — | 300.00 | — | — | ||
| Supply and fabrication of MS angle of suitable size for outdoor unit stand with red- oxide paint ( 2 layers) and enamel paints ( 2 layers). | — | — | — | 29,100 | |
| — | 240.00 | — | — | ||
| Supply, installation, testing and commissioning of power cable for electric supply to panel for indoor units & outdoor units (Plant AC). | — | — | — | 88,320 | |
| — | 240.00 | — | — | ||
| Supply and installation of communication cable. | — | — | — | 39,600 | |
| — | 160.00 | — | — | ||
| Supply of LED based station name board on ALP sheet of 3mm gauge thickness with projected alphabets made of imported acrylic sheet in size of 30 inch height and 24 inch width lighting of alphabet with LED chip modular light make: Samsung, LG, ROHS or equivalent make of suitable color. | — | — | — | 2,31,360 | |
| — | 451.00 | — | — | ||
| Supply and fabrication of MS chanel, angle of suitable sizes complete with required sizes nuts & bolts and all fixing materials like cement, sand etc for fixing the above LED based station name board at site. | — | — | — | 55,022 | |
| — | 77.00 | — | — | ||
| Entry gate & exit gate, Lane marking, Gantry, Parking entry, parking Exit, Freight Entry, freight Exit, Way Finding Sign External (6 panels x 6 directories) panels, way Finding sign external, Building titles, on staircase, gate sign, double sided sign shall be of size : 30' x 5', 60' x 2.5', 20' x 5', 72" x 10", 18' x 2', 16' x 1.5' etc. dimension may vary as per site requirement confirming to following specification:- Supply, installation, testing & commissioning etc. as per site requirement conforming to following specifications:- made of Laser cut Aluminium panel of 1mm thick Aluminium sheet with painted face having 3mm letter fascia to be laser cut out from Opel perplex sheet of 4mm thickness with LT% value of 70, certified as such by an accredited lab fixed in the soace cut out for graphics to be internally lit with SMD LED modules, 990milli candela lum rating 6500K certified by accredited lab, beam characteristics 155C colour consistency(Mac Ad au 5) integrated current source to stabilize luminous flux.Ambient temp. 25C to 50C max surface Temp. 65C protection rating IP 68, Luminous flux per module 70 lm, CRI>80, Lum efficacy- 97 lm/w voltage =072w/60 mA per module. En 62031, LED to be NICHEA/Samsung, DC current with LUM maintenance of 89.7% over hours with supporting certificate to use as per sign size- 20W, 40W, 60W, 100W, 150W, constant current mode power supply, Universal AC input/Full range, Fully encapsulated with IP 67 range, withstand 300V A surge input for 5 seconds, 100% full load burn-in test, 5 year guarantee by primary manufacturer, Class C as per EN61000-3-2, suitable for central battery system, auto shut and start in case of overload, Auto power modulation & restart outside range bound temperature, Hiccup mode and auto recovery in case of short circuit on secondary side(LED) make- TALEX/MEANWELL, ST MICRO electronics Philips, Aluminium face to be painted in required colour with PU paint ( Berger, MRF, Asian, Nerolac ) water based only. (A) Sign support gantry Structure : Made up of 50mm x 50mm x 2mm pipes sections for fixing sign board both front and back ( to use existing) (B) Support pillers : To use the existing pillars available from earlier boards. (C) anchor Plates : To use plates from existing gantry structure RCC base (M40/50 concrete) of size 900X1800X1800 each pole. (Size and colour of the board will be as per latest guidelines). | — | — | — | 2,54,254 | |
| — | 44.00 | — | — | ||
| Supply and fixing of 8-way double door MCB DB with one no DP MCB 40 Amp and 32 Amp 08 Nos MCB SP with sheet metal enclosed type steel cover with all accessories Make- Legrand, ABB, Siemens. | — | — | — | 1,75,868 | |
| — | 24.00 | — | — | ||
| Supply and fixing of 4-way TPN double door MCB DB with 4 pole isolator 80 Amp one no. and 32 Amp 12 Nos MCB SP with sheet metal enclosed type steel cover with all accessories Make- Legrand, ABB, Siemens. | — | — | — | 1,58,208 | |
| — | 14.00 | — | — | ||
| Fabrication supply testing connection and installation of L.T. TPN distribution panel board cubical type wall mounting dust and vermin proof made of 16 SWG MS sheet angle iron from with all inter connection including 2 coats of best quality red oxide paint and two coats of synthetic enamelled paint with front operated type suitable system of 3 phase - 4 wire 415 V 50 C/S AC supply complete with 200 Amp. TPN copper bus bar entire length & panel inter connection nuts and bolts providing all necessary materials and accessories with following MCB/MCCB panel mounting there is required suitable for indoor/outdoor mounting. In coming. (A) MCCB DTH 200 Amp. range - 140-200A Make LEGRAND/ABB/SIEMENS/L&T - 01 no. (B) Voltmeter with selector switch 0-500V- 1 no. (C) Ammeter with selector switch 200/5A CT operated - 1 no. (D) Indicator lamp RYB - 3 nos. Outgoing. (A) MCB 4 pole 63 A make LEGRAND/ ABB/ SIEMENS/L&T -06 nos. | — | — | — | 7,15,820 | |
| — | 20.00 | — | — | ||
| Supply & fixing of octagoinal Dip Galvenised in single dip average 70 micron DFT, BOP-6030 type pole of 5-6 m long with double arm, top dia 70mm , bottom dia 130 mm sheet thickness 3 mm, in single section with Base plate (220x220x12)mm (LxBxT) with 4x20mm dia 600 mm long with 100mm projection foundation bolt complete with juncition box with Bakellite sheet with 6A MCB & stud ternminals (for mounting inside base compartement of pole ) and internal writing for terminal to filling with 2x2.5 sq mm Cu cable of reputed make. (Make of pole Bajaj,Bansal,Surya,Philips, Transrail LIghting Ltd.(GAMMON GROUP). | — | — | — | 3,59,620 | |
| — | 20.00 | — | — | ||
| Supply of Dip Galvenised Double arm bracket 1000 mm long suitable for 3 to 10 mtr pole. | — | — | — | 46,160 | |
| — | 20.00 | — | — | ||
| Erection and casting of foundation for octagonal/tubular pole with earth excavation with cement concrete (1:3:6) and muffing of base foundation as per manufacturer drawing and dimension as required under supervision of site incharge. | — | — | — | 45,820 | |
| — | 84.00 | — | — | ||
| Supply, fixing, connnection, testing and commissioning of LED street light, pressure die cast aluminium housing with IP 65 or better protection having system wattage 90W complete with all suitable fixing hardware materials. Make: Philips, Bajaj, Havells, Syska. | — | — | — | 5,57,256 | |
| — | 15.00 | — | — | ||
| Supply, installation, testing & commissioning of copper bus bar of 600 amp. Cap. The busbar shall be fabricated with 50x8mm (400 Sq. mm cross section copper strip 4 Nos. in parallel (Taking 4 strips in parallel as one unit). Mounted on pedestal insulator. The busbar shall be incorporated in LT cubical panel board complete | — | — | — | 89,565 | |
| — | 42.00 | — | — | ||
| Supply and erection of earthing station with GI pipe "B" class TATA/JINDAL/ Bansal of size 3 mts. long 50 mm minimum dia and provided with alternate layer of charcoal and salt in the earth pipe around the GI pipe and suitable clampinng arrangement including supply and conection with 6 SWG GI wire from earth pipe to panel board as per site requirement. Bore dia of size 300mmx3000mm, digging will be done by auger. Minimum qty. of each enhancement material to be supply is 50 Kg per pit. | — | — | — | 81,480 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
MSOP2018.pdf
ATTACHMENT
EL-43-2025-26.pdf
ATTACHMENT
ACS-4.pdf
ATTACHMENT
2018_CE-I_CT_9Date04_06_2018.pdf
ATTACHMENT
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27_04_22.pdf
ATTACHMENT
FORMVIB.pdf
ATTACHMENT
ANNEXURE-VA.pdf
ATTACHMENT
BidSecurityAnnexure-VIA.pdf
ATTACHMENT
BidCapacityAnnexure-VI.pdf
ATTACHMENT
ContractoreMB.pdf
ATTACHMENT
AdvanceCorrectionSlipNo_6ACS-6_1.pdf
ATTACHMENT
AnnexureB.pdf
ATTACHMENT
AdvancecorrectionslipNo.1ofGCC.pdf
ATTACHMENT
CorrectionslipNo.-3ofGCC-2022.pdf
ATTACHMENT
AdvanceCorrectionSlipNo-5ACS-5.pdf
ATTACHMENT
CorrectionslipNo-2ofGCC-2022.pdf
ATTACHMENT
CorrigenduminGCCforGST.pdf
ATTACHMENT
GuidelineforSteelReinforcement.pdf
ATTACHMENT
CorrigendumofBankGuaranteeFormat.pdf
ATTACHMENT
ACS-7.pdf
ATTACHMENT
ACS-8.pdf
ATTACHMENT
ACS-9.pdf
ATTACHMENT
ACS-10.pdf
ATTACHMENT
ClarificationregardingsubmissionofAnnexue-V.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .