| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.5 LAccepted-AOC COIMBATORE | ₹49.5 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹50.6 L+₹1.1 L (2.25%)Rejected-AOC 9 K K NAGAR 10TH STREET POLICE QUARTERS ROAD GANAPATHY COIMBATORE 641 006 | COIMBATORE | TAMIL NADU | 641006 | ₹50.6 L+₹1.1 L (2.25%) | L2 | Rejected-AOC rejected |
| Sl No | Description | Qty | Unit | SRI BANU CONSTRUCTIONS L1 | Murali and Co L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavations in all soils and sub-soils and the full depth as may be directed by the Deptl.officers with initial leads and lifts and cleaning and leveling the site etc, complete complying with standard specification | 600 | m3 | 115 ₹69,000 Lowest | 115 ₹69,000 Lowest |
| 2.00 | Conveying the excavated earth and for milling materials to the work site to designated dumping yard from the site to the distance of 0 to 15kms out side of the city limit including all initial lead, lift, loading and unloading with transportation charges | 360 | m3 | 67 ₹24,120 Lowest | 67 ₹24,120 Lowest |
| 3.00 | Providing and laying ,spreading and compacting graded stone aggregate to wet mix macadam (WMM ) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base /base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. | 600 | m3 | 2,500 ₹15,00,000 Lowest | 2,500 ₹15,00,000 Lowest |
| 4.00 | Providing and laying Prime Coat 7Kg/10 M2 With Bitumen Emulsion (Slow Setting) Including Cost of Bitumen emulsion At The Site Including Labour Charges For Preparing The Surface And Applying Required Quantity of Bitumen Emulsion As Prime Coat Using Bitumen Sprayer Etc. Complete Over Wet Mix Macadam As Per Clause 502 of Mort & H Specifications. | 6,000 | m2 | 92 ₹5,52,000 Lowest | 92 ₹5,52,000 Lowest |
| 5.00 | Providing and laying Tack Coat 2.5 kg/10 m2 with Bitumen Emulsion (Rapid Setting 1) including cost of bitumen emulsion at the site, including labour charges for preparing the surface and applying required quantity of bitumen emulsion as Tack Coat using bitumen sprayer etc., complete over the primed surface as per clause 503 of MoRT& H Specifications Rev.5 | 6,000 | m2 | 21 ₹1,26,000 Lowest | 21 ₹1,26,000 Lowest |
| 6.00 | Providing and laying Bituminous Concrete30mm thick using 19 – 9.50 mm metal, 9.5-2.36 mm Metal, 2.36 mm and below Metal of specified grading aggregates and Quarry Dust with 37.73 kg of VG30 (60/70grade) bitumen ( Procured from State/ Central Public sector undertakings only) for premixing per 10sq.m including cost and conveyance of all materials to work site and stacking them on road side to standard departmental metric gauge for pre-measurement, heating the bitumen in bitumen boiler heating the aggregates and mixing them with bitumen in mini hot mix plant, spreading the mix in the required temperature for uniform thick of 30mm over a previously prepared surface to specified grade and cross section and compaction by power roller, including labour charges, spreading etc., including Hire charges for machineries etc., complete as per clause 509 of MoRT & H Specifications to achieve the desired compaction. | 240 | m3 | 11,610 ₹27,86,400 Lowest | 11,610 ₹27,86,400 Lowest |
Tender Value
₹59 L
EMD Value
₹59,000
Closing Date
23 Jan 2026, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
RESTORATION OF BT SURFACE AT JEEVA NAGAR 2ND CROSS 162022R17543 ,JEEVA NAGAR 3RD CROSS 162022R17544 ,JEEVA NAGAR 4TH CROSS 162022R17545 , JEEVA NAGAR 5TH CROSS 162022R17546 , IN WARD NO . 22 Of EAST ZONE,COIMBATORE CORPORATION
2026_MAWS_642162_62
E12/2026 (TURIP)
Open Tender
Civil Works
Works
90 days
Coimbatore
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹59,000
Chief Engineer Chamber, Coimbatore Corporation, Ma
3 Apr 2026
13 Jan 2026
23 Jan 2026
13 Jan 2026
23 Jan 2026
13 Jan 2026
14 Jan 2026
Earth work excavations in all soils and sub-soils and the full depth as may be directed by the Deptl.officers with initial leads and lifts and cleaning and leveling the site etc, complete complying with standard specification
Conveying the excavated earth and for milling materials to the work site to designated dumping yard from the site to the distance of 0 to 15kms out side of the city limit including all initial lead, lift, loading and unloading with transportation charges
Providing and laying ,spreading and compacting graded stone aggregate to wet mix macadam (WMM ) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base /base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications.
Providing and laying Prime Coat 7Kg/10 M2 With Bitumen Emulsion (Slow Setting) Including Cost of Bitumen emulsion At The Site Including Labour Charges For Preparing The Surface And Applying Required Quantity of Bitumen Emulsion As Prime Coat Using Bitumen Sprayer Etc. Complete Over Wet Mix Macadam As Per Clause 502 of Mort & H Specifications.
Providing and laying Tack Coat 2.5 kg/10 m2 with Bitumen Emulsion (Rapid Setting 1) including cost of bitumen emulsion at the site, including labour charges for preparing the surface and applying required quantity of bitumen emulsion as Tack Coat using bitumen sprayer etc., complete over the primed surface as per clause 503 of MoRT& H Specifications Rev.5
Providing and laying Bituminous Concrete30mm thick using 19 – 9.50 mm metal, 9.5-2.36 mm Metal, 2.36 mm and below Metal of specified grading aggregates and Quarry Dust with 37.73 kg of VG30 (60/70grade) bitumen ( Procured from State/ Central Public sector undertakings only) for premixing per 10sq.m including cost and conveyance of all materials to work site and stacking them on road side to standard departmental metric gauge for pre-measurement, heating the bitumen in bitumen boiler heating the aggregates and mixing them with bitumen in mini hot mix plant, spreading the mix in the required temperature for uniform thick of 30mm over a previously prepared surface to specified grade and cross section and compaction by power roller, including labour charges, spreading etc., including Hire charges for machineries etc., complete as per clause 509 of MoRT & H Specifications to achieve the desired compaction.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
Docccc62.pdf
Tender Documents • 0.81 MB
BOQ_769556.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .