| Sl No | Description | Qty | Unit | VINAYAGAMOORTHY L2 | DHANVI CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation in all soils and sub-soils with in the initial lead and lift except hard rock required blastering including cost of side shuttering strutting showering of water if necessary and refill the earth in sides of foundation etc complete as per std specifications (Drain works) Data 2025-26 | 118 | m3 | 225 ₹26,550 | 220 ₹25,960 Lowest |
| 2.00 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification Data 2025-26 | 18 | m3 | 5,320 ₹95,760 | 5,310 ₹95,580 Lowest |
| 3.00 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (Spaced at about 90cm c/c) and supported by casurina props of 10cm to 13cm dia (spaced at 75 cm c/c ) complying with standard specification and as directed (For Drain works) Data 2025-26 | 308 | m2 | 470 ₹1,44,759.06 | 464 ₹1,42,911.07 Lowest |
| 4.00 | Plain Cement Concrete 1:2:4 mix (One Cement ,two sand and four aggregate) using 20mm ISS gauge HBBG metal from the approved quarry including mixing, laying, consolidating, curing cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification Data 2025-26 | 46 | m3 | 6,610 ₹3,04,060 | 6,600 ₹3,03,600 Lowest |
| 5.00 | Plastering with cement mortar 1:4 (One Part of Cement and Four part of Plastering Sand (P- Sand) 20mm thick in all floors including cost and conveyance of all materials to site and labour charges etc, complete complying with standard specifications (S.I.309) Data 2025-26 | 75 | m2 | 580 ₹43,500 | 576 ₹43,200 Lowest |
| 6.00 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. Data 2025-26 | 150 | Kg | 93 ₹13,950 | 91.5 ₹13,725 Lowest |
| 7.00 | Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of sand, but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - The Coarse and Fine aggregates to be used should comply with the requiremnents of IS staandards. (No separate payment will be made by the Department for the excess usage of materials) Data 2025-26 | 2 | m3 | 8,316 ₹16,665.26 Lowest | 8,316 ₹16,665.26 Lowest |
| 8.00 | Removal of excess earth with lead in to 2 KM including labour, Transport and loading and unloading etc complete as per standard specification Data 2025-26 | 79 | m3 | 70 ₹5,530 | 67 ₹5,293 Lowest |
| 9.00 | GST 18% | 1 | No | 1,17,139 ₹1,17,139 | 1,16,448 ₹1,16,448 Lowest |
Tender Value
₹7.8 L
EMD Value
₹15,601
Closing Date
18 Mar 2026, 3:00 pmClosed
Commissioner
Infantry Road, Vellore Corporation, Vellore-632001.
Providing CC Drain and Culverts at Kazhani Kattu 3rd Street, Ward No.17 Zone - IV in Vellore Corporation
2026_MAWS_674995_1
137/2026/E3/GF-2025-26/SC/P1
Open Tender
Civil Works
Works
180 days
Vellore
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹15,601
20 Jul 2026
16 Mar 2026
18 Mar 2026
16 Mar 2026
18 Mar 2026
16 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork excavation in all soils and sub-soils with in the initial lead and lift except hard rock required blastering including cost of side shuttering strutting showering of water if necessary and refill the earth in sides of foundation etc complete as per std specifications (Drain works) Data 2025-26 | 118 | m3 | - | - |
| 2 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification Data 2025-26 | 18 | m3 | - | - |
| 3 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (Spaced at about 90cm c/c) and supported by casurina props of 10cm to 13cm dia (spaced at 75 cm c/c ) complying with standard specification and as directed (For Drain works) Data 2025-26 | 308 | m2 | - | - |
| 4 | Plain Cement Concrete 1:2:4 mix (One Cement ,two sand and four aggregate) using 20mm ISS gauge HBBG metal from the approved quarry including mixing, laying, consolidating, curing cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification Data 2025-26 | 46 | m3 | - | - |
| 5 | Plastering with cement mortar 1:4 (One Part of Cement and Four part of Plastering Sand (P- Sand) 20mm thick in all floors including cost and conveyance of all materials to site and labour charges etc, complete complying with standard specifications (S.I.309) Data 2025-26 | 75 | m2 | - | - |
| 6 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. Data 2025-26 | 150 | Kg | - | - |
| 7 | Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of sand, but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - The Coarse and Fine aggregates to be used should comply with the requiremnents of IS staandards. (No separate payment will be made by the Department for the excess usage of materials) Data 2025-26 | 2 | m3 | - | - |
| 8 | Removal of excess earth with lead in to 2 KM including labour, Transport and loading and unloading etc complete as per standard specification Data 2025-26 | 79 | m3 | - | - |
| 9 | GST 18% | 1 | No | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_811277.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.03 MB
BOQ_811277.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .