Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.3 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹1.4 L+₹15,046.33 (11.8%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹1.5 L+₹19,409.77 (15.2%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹1.5 L+₹21,064.87 (16.5%)Admitted-Finance | L4 | Admitted-Finance |
Tender Value
₹1.5 L
EMD Value
₹3,000
Closing Date
10 Aug 2026, 4:00 pmClosed
XEN REW Kathua
XEN REW Kathua
Constt. Of 03nos of Community Compost pit at 1. At overu wno 5 Machedi 2. Wno 6 Dull Bajohie 3. At wno 9 howal Badnota
2026_RDPR_318544_32
e-NIT No.153/REW/K of 2026-27 Dated 30/07/2026
Open Tender
Civil Works
Percentage
60 days
LOHAI MALHAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹3,000
Yes
31 Aug 2026
30 Jul 2026
11 Aug 2026
30 Jul 2026
10 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed All kind of Soil. | 7.01 | cum | 479.3 | ₹3,359.89 |
| 2 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 infoundation and plinth including curing in Cement mortar 1:6 Mix. | 9.08 | cum | 7,571.55 | ₹68,749.67 |
| 3 | Honey-comb brick work 10/11.4 cm thick with common burnt clay (non-modular) bricks of class designation 75 in superstructure above plinth level upto floor five level in cement mortar 1:4 (1 cement : 4 coarse sand) including curing complete | 4.18 | sqm | 713.1 | ₹2,980.76 |
| 4 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 69.15 | kg | 138.2 | ₹9,556.53 |
| 5 | Providing & laying damp-proof Course 40 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone agg 12.5 mm nominal size) and curing complete | 7.95 | sqm | 346.7 | ₹2,756.27 |
| 6 | 12mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand) | 105.95 | sqm | 266.8 | ₹28,267.46 |
| 7 | Provision for Fiber Sheet( to be Paid as per actual measurement) | 3 | no | 3,000 | ₹9,000 |
| 8 | Carriage of Sand + Agg for 37 KM by MT+ 500 M By AT/ HL | 2.36 | cum | 1,191.5 | ₹2,811.94 |
| 9 | Carrage of Bricks for 97 KM KM by MT + 500 M By AT/HL | 4,480 | no | 4.46 | ₹19,980.8 |
| 10 | Add Cost for CIB | 3 | no | 1,000 | ₹3,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.22 MB
BOQ_1050370.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .