| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 CrAccepted-AOC | ₹4.7 Cr | L1 | Accepted-AOC technically qualified and quoted lowest amount |
| 2 | L2₹4.9 Cr+₹18.2 L (3.83%)Rejected-Finance 0 0 0 NEAR DAK BUNGLOW NH 1 A NH 1A UDHAMPUR UDHAMPUR JAMMU KASHMIR 182101 | UDHAMPUR | JAMMU AND KASHMIR | 182101 | ₹4.9 Cr+₹18.2 L (3.83%) | L2 | Rejected-Finance quoted higher rate than L1 |
| 3 | L3₹5.4 Cr+₹68.5 L (14.4%)Rejected-Finance | ₹5.4 Cr+₹68.5 L (14.4%) | L3 | Rejected-Finance quoted higher rate than L1 |
| 4 | L4₹5.6 Cr+₹81.0 L (17.1%)Rejected-Finance AVADH PURI COLONY AMANIGANJ AYODHYA | AYODHYA | AYODHYA | UTTAR PRADESH | ₹5.6 Cr+₹81.0 L (17.1%) | L4 | Rejected-Finance quoted higher rate than L1 |
| 5 | L5₹5.6 Cr+₹84.1 L (17.7%)Rejected-Finance GRAM SHEKHAPUR BADGAON DISTRICT GONDA | GONDA | UTTAR PRADESH | 271001 | ₹5.6 Cr+₹84.1 L (17.7%) | L5 | Rejected-Finance quoted higher rate than L1 |
Tender Value
₹5.6 Cr
EMD Value
₹11.3 L
Closing Date
19 Nov 2024, 3:00 pmClosed
SE Sixth Circle IW Lucknow
Office of SE six circle Lucknow
Janpad Hardoi me Sandila Rajwaha ke km 0.000 se km 24.880 tak punarsthapna avam Nahri Bhumi sa Simankan ka karya
2024_UPIDC_963983_2
04/SE-6/2024-25 LOT3
Open Tender
Civil Works
Item Rate
360 days
HARDOI
Please refer tender documents
4 documents required · 4 mandatory
₹2,354
₹11.3 L
Yes
19 Feb 2025
13 Nov 2024
19 Nov 2024
13 Nov 2024
19 Nov 2024
13 Nov 2024
Amount
Earth work in clearance (cutting/filling) of section of canal inclusive of manual compaction but excluding of mechanical compaction also including lead upto 100 Mtr & lift upto 1.50 Mtr and dressing of excavated soil - For Canal section from Km. 0.000 to 24.880
Dry earth work in foundation of masonry work for building works and works on channels of discharge below 10 cumec including lead upto 30m & lift upto 1.5m and its disposal and back filling - For Gauge Site, Outlets, Kilometer Stone, C.C. Lining, Tail Fall, Boundary Piller,Reconstuction of VRB at Km. 0.603, 1.810,4.800 & 5.329,Reconstuction of VRB at Km. 3.620,Reconstuction of VRB at Km. 9.100,Reconstuction of VRB at Km. 13.043 & 14.110,Reconstuction of VRB at Km. 21.075,Reconstuction of VRB at Km. 23.100 & Reconstuction of Syphon at Km. 20.984.
Earth work in making Diversion & approach- for Reconstuction of VRB at Km. 0.603, 1.810,4.800 & 5.329,Reconstuction of VRB at Km. 3.620,Reconstuction of VRB at Km. 9.100,Reconstuction of VRB at Km. 13.043 & 14.110,Reconstuction of VRB at Km. 21.075,Reconstuction of VRB at Km. 23.100 & Reconstuction of Syphon at Km. 20.984.
P.C.C. 1:3:6 with cement, coarse sand and stone ballast 22.4 to 53mm size- For Gauge Site, Outlets, Kilometer Stone, Tail Fall, Boundary Piller,Reconstuction of VRB at Km. 0.603, 1.810,4.800 & 5.329,Reconstuction of VRB at Km. 3.620,Reconstuction of VRB at Km. 9.100,Reconstuction of VRB at Km. 13.043 & 14.110,Reconstuction of VRB at Km. 21.075 & Reconstuction of VRB at Km. 23.100.
1st class Brick work in 1:4 in cement and coarse sand mortar in foundation & plinth including supply of all material, labour and T&P etc. required for proper completion of work - For Outlets, Tail Fall, Reconstuction of VRB at Km. 0.603, 1.810,4.800 & 5.329,Reconstuction of VRB at Km. 3.620,Reconstuction of VRB at Km. 9.100,Reconstuction of VRB at Km. 13.043 & 14.110,Reconstuction of VRB at Km. 21.075, Reconstuction of VRB at Km. 23.100 & Repairing & Painting work of Pakka Structure.
1st class Brick work in 1:3 in cement and coarse sand mortar in foundation & plinth including supply of all material, labour and T&P etc. required for proper completion of work - For Reconstuction of VRB at Km. 0.603, 1.810,4.800 & 5.329, Reconstuction of VRB at Km. 3.620 & Reconstuction of VRB at Km. 9.100.
Centering & shuttering for C.C. Block including cost of shuttering material, labour and T&P etc. - For Gauge Site, Outlets, Kilometer Stone, C.C. Lining, Tail Fall & Boundary Piller.
Centering & shuttering for R.C.C. work for bridge upto 3 m span including rent of shuttering material, labour and T&P etc - For Gauge Site,Reconstuction of VRB at Km. 9.100,Reconstuction of VRB at Km. 21.075 & Reconstuction of VRB at Km. 23.100.
Centering & shuttering for R.C.C. work for bridge above 3 m span including rent of shuttering material, labour and T&P etc - For Reconstuction of VRB at Km. 0.603, 1.810,4.800 & 5.329,Reconstuction of VRB at Km. 3.620 & Reconstuction of VRB at Km. 13.043 & 14.110.
Centering & shuttering for R.C.C. work for T-beam bridges, syphon and aqueduct including rent of shuttering material, labour and T&P etc - For Reconstuction of Syphon at Km. 20.984.
Mild steel/ Tor steel or iron in plain work such as reinforced concrete reinforced brick work (when not included in an over all rates) wrougth to required shape as necessary including bending for proper completion of work including all material, labour, T&P etc of 8 MM DIA TMT- For Gauge Site, Kilometer Stone,Reconstuction of VRB at Km. 0.603, 1.810,4.800 & 5.329, Reconstuction of VRB at Km. 3.620 & Reconstuction of VRB at Km. 9.100.
Mild steel/ Tor steel or iron in plain work such as reinforced concrete reinforced brick work (when not included in an over all rates) wrougth to required shape as necessary including bending for proper completion of work including all material, labour, T&P etc of 10 MM DIA TMT- For Reconstuction of VRB at Km. 0.603, 1.810,4.800 & 5.329,Reconstuction of VRB at Km. 3.620,Reconstuction of VRB at Km. 9.100,Reconstuction of VRB at Km. 13.043 & 14.110,Reconstuction of VRB at Km. 21.075,Reconstuction of VRB at Km. 23.100 & Reconstuction of Syphon at Km. 20.984.
Mild steel/ Tor steel or iron in plain work such as reinforced concrete reinforced brick work (when not included in an over all rates) wrougth to required shape as necessary including bending for proper completion of work including all material, labour, T&P etc of 12 MM DIA TMT- For Gauge Site, Kilometer Stone & Reconstuction of Syphon at Km. 20.984.
Mild steel/ Tor steel or iron in plain work such as reinforced concrete reinforced brick work (when not included in an over all rates) wrougth to required shape as necessary including bending for proper completion of work including all material, labour, T&P etc of 16 MM DIA TMT- For Reconstuction of VRB at Km. 0.603, 1.810,4.800 & 5.329,Reconstuction of VRB at Km. 3.620,Reconstuction of VRB at Km. 9.100,Reconstuction of VRB at Km. 13.043 & 14.110,Reconstuction of VRB at Km. 21.075,Reconstuction of VRB at Km. 23.100 & Reconstuction of Syphon at Km. 20.984.
Mild steel/ Tor steel or iron in plain work such as reinforced concrete reinforced brick work (when not included in an over all rates) wrougth to required shape as necessary including bending for proper completion of work including all material, labour, T&P etc of 20 MM DIA TMT- For Reconstuction of VRB at Km. 0.603, 1.810,4.800 & 5.329,Reconstuction of VRB at Km. 3.620 & Reconstuction of VRB at Km. 13.043 & 14.110.
4MM DIA G.I. Wire Reinforcement including cost binding wire and bending, cutting, binding and placing in position including T&P.- For Boundry Piller.
R.C.C. work with cement, approved coarse sand 2cm (3/4'') gauge approved stone grit I the proportion of 1:1.5:3 in slab, beam, sunshade etc. including supply of all mateiral , labour, T&P etc. but excluding the cost of centering and shuttering work. - For Gauge Site, Kilometer Stone, Boundry Piller, Reconstuction of VRB at Km. 0.603, 1.810,4.800 & 5.329,Reconstuction of VRB at Km. 3.620,Reconstuction of VRB at Km. 9.100,Reconstuction of VRB at Km. 13.043 & 14.110,Reconstuction of VRB at Km. 21.075 & Reconstuction of VRB at Km. 23.100.
C.C. work with cement, approved coarse sand 2cm (3/4'') gauge approved stone grit I the proportion of 1:1.5:3 in slab, beam, sunshade etc. including supply of all mateiral , labour, T&P etc. but excluding the cost of centering and shuttering work.- For Outlets & Tail Fall.
C.C.1:1:2 with cement, coarse snad and stone grit 6.7 to 11.20 mm size - For Reconstuction of VRB at Km. 0.603, 1.810,4.800 & 5.329,Reconstuction of VRB at Km. 3.620,Reconstuction of VRB at Km. 9.100,Reconstuction of VRB at Km. 13.043 & 14.110,Reconstuction of VRB at Km. 21.075 & Reconstuction of VRB at Km. 23.100.
R.C.C. work with cement, approved coarse sand 2cm (3/4'') gauge approved stone grit I the proportion of 1:1:2 in slab, beam, sunshade etc. including supply of all mateiral , labour, T&P etc. but excluding the cost of centering and shuttering work.- For Reconstuction of Syphon at Km. 20.984.
C.C.1:2:4 with cement, coarse sand and stone grit 6.7 to 11.20 mm size - For C.C. Lining & Reconstuction of Syphon at Km. 20.984.
Providing 100 mm thick M-15 (1:2:4) Cement concrete in lining with 4.75 to 20 mm size graded hard stone grit and coarse sand by paver machine and chemical curing on side slope with cost of all material labour centering and shuttering T&P required for proper completion of work. - For C.C. Lining.
Flush cement pointing with 1:2 cement and coarse sand on brick work - For Reconstuction of VRB at Km. 0.603, 1.810,4.800 & 5.329,Reconstuction of VRB at Km. 3.620,Reconstuction of VRB at Km. 9.100,Reconstuction of VRB at Km. 13.043 & 14.110,Reconstuction of VRB at Km. 21.075, Reconstuction of VRB at Km. 23.100 & Repairing & Painting work of Pakka Structure.
10 to 15 mm thick cement plaster in 1:4 cement mortor single coat on rough side of single or half brick wall for interior plastering in single storey building finish even & smooth including all cost of material labour T&P etc for complete work- For Gauge Site, Outlets & Tail Fall.
Laying brick soling layer on prepared subgrade with brick on end edging according to lines, graded and cross section shown on the drawing filling joints with sand and earth spreading 25 mm thick layer of earth over brick soling watering and rolling the same with three wheel road roller 80-100 KN as per MORTH. - For Brick Soling, Reconstuction of VRB at Km. 0.603, 1.810,4.800 & 5.329,Reconstuction of VRB at Km. 3.620,Reconstuction of VRB at Km. 9.100,Reconstuction of VRB at Km. 13.043 & 14.110,Reconstuction of VRB at Km. 21.075,Reconstuction of VRB at Km. 23.100 & Reconstuction of Syphon at Km. 20.984.
Edging with straight over burnt laid by lengthwise including excavation, refilling consolidation with a hand packing and spreading nearly surplus earth with in a lead of 50 mtr.- For Brick Soling.
Levelling & dressing for preparing of subgrade for laying of brick soling - For Brick Soling.
Making sub grade in lining work including watering compaction and preparation of surface.- For C.C. Lining.
Providing and laying in local sand in filter including cost of material labour T&P etc. - For C.C. Lining.
Providing & Fixing of Wheel guard ( 0.20x0.15x0.75 M) - For Reconstuction of VRB at Km. 0.603, 1.810,4.800 & 5.329,Reconstuction of VRB at Km. 3.620,Reconstuction of VRB at Km. 9.100,Reconstuction of VRB at Km. 13.043 & 14.110,Reconstuction of VRB at Km. 21.075,Reconstuction of VRB at Km. 23.100 & Reconstuction of Syphon at Km. 20.984.
Providing & Fixing of PVC Pipe for Drainage pipe/Weep holes - For Reconstuction of VRB at Km. 0.603, 1.810,4.800 & 5.329,Reconstuction of VRB at Km. 3.620,Reconstuction of VRB at Km. 9.100,Reconstuction of VRB at Km. 13.043 & 14.110,Reconstuction of VRB at Km. 21.075 & Reconstuction of VRB at Km. 23.100.
Providing and fixing 110mm PVC pipe Required for proper completion of work as per direction of Engineer-in-charge. - For Outlets & Tail Fall.
Supplying and laying L.D.P. film including cost of all material labour, T&P required for proper completion of work. - For C.C. Lining.
Painting on top of sleeper with sealing compound including cost of all material fuel for heating labour T&P required for proper completion of work.- For C.C. Lining.
Finishing walls with premium Acrylic smooth exterior paint with silicon additives of required shade: 13.47.1 new work (Two or more coats applied @ 1.43 ltr 10 sqm over and including priming coat of exterior primer applied @ 2.20kg./10 sqm) - For Gauge Site, Outlets, Kilometer Stone, Tail Fall, Boundary Piller,Reconstuction of VRB at Km. 0.603, 1.810,4.800 & 5.329,Reconstuction of VRB at Km. 3.620,Reconstuction of VRB at Km. 9.100,Reconstuction of VRB at Km. 13.043 & 14.110,Reconstuction of VRB at Km. 21.075,Reconstuction of VRB at Km. 23.100 & Repairing & Painting work of Pakka Structure.
Painting on Iron works in small areas with one coat of ready mixed priming paint & one coat of approved superior quality ready mixed paint of clear synthetic varnish including supply of all materials, labour and T&P etc. required for proper completion of work - For Repairing & Painting work of Pakka Structure
Painting Letters above 8 cm size complete including supply of all material labour & T&P etc. - For Kilometer Stone.
Writing Letter on Sign Board above 50 mm size but below 80 mm size complete including supply of all material labour & T&P etc. - For Boundry Piller.
Dewatering by 7.5 H.P Deisel pump in per hour.- For Reconstuction of Syphon at Km. 20.984.
SHIVAM ENTERPRISES (BID ID -4729168)
VIRAT CONSTRUCTION (BID ID -4728948)
M/S R K CONSTRUCTION (BID ID -4729707)
M/S CHANDRA MAULI MISHRA CONTRECTOR (BID ID -4729775)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .