| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 CrAccepted-AOC A 7 62 SECTOR 15 ROHINI DELHI 110089 | NORTH WEST | DELHI | 110089 | ₹3.6 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹4.0 Cr+₹37.4 L (10.3%)Rejected-AOC | ₹4.0 Cr+₹37.4 L (10.3%) | L2 | Rejected-AOC L2 |
| 3 | L3₹5.2 Cr+₹1.5 Cr (42.5%)Rejected-AOC 78 NEAR CHOPAL VILLAGE NIZAMPUR DISTT PANIPAT | PANIPAT | HARYANA | ₹5.2 Cr+₹1.5 Cr (42.5%) | L3 | Rejected-AOC L3 |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Bidder has not uploaded the NIT in pdf. |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Bidder has not provided EMD in favour of EE, CBMD M-233,PWD, Delhi. |
Tender Value
₹4.4 Cr
EMD Value
₹8.7 L
Closing Date
16 Apr 2026, 3:00 pmClosed
Executive Engineer
SRD Project DIV.-II (CBMD M-233), (GNCTD), Western Bank Lok Nayak Setu, I.P. Estate, New Delhi-110002.
A/R and M/O various road under Sub division-2,SRD Project Division-2 during 2026-27. (SH Providing and laying CC paver block and Precast Central Verge at New Rohtak road (From Near Zakhira Zero Point to Near Gali No. 4) under jurisdiction of Sub Divi
2026_PWD_289825_1
01/EE/S.R.D. Project Divn-II/PWD/2026-27
Open Tender
Civil Works
Works
60 days
Executive Engineer, SRD Project DIV.-II, PWD
Please refer Tender documents.
12 documents required · 12 mandatory
₹0
₹8.7 L
Yes
27 Apr 2026
11 Apr 2026
16 Apr 2026
11 Apr 2026
16 Apr 2026
11 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Providing and laying in position ready mixed or site batched design mix cement concrete for plain cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana/Ordinary Portland/Portland Slag cement, admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering and finishing as per direction of the Engineer-in-charge; for the following grades of concrete. Note : Extra cement upto 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the minimum specified cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. | |||||
| 1.1 | All works up to plinth level: | - | - | - | - |
| 1.2 | Concrete of M25 grade with minimum cement content of 300 kg /cum | 1,860 | cum | 9,439.05 | ₹1,75,56,633 |
| 2Centering and shuttering including strutting, propping etc. and removal of form for all heights: | |||||
| 2.1 | For Raft (Both side) | 435 | sqm | 392.15 | ₹1,70,585.25 |
| 3Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. | |||||
| 3.1 | Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 125 | cum | 2,434.25 | ₹3,04,281.25 |
| 4 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.
Note: Payment will be made as per weight slip issued by authorised MCD dumping ground after dumping of malba. Processing fees at prescribed rate of authorised MCD dumping ground will be submitted by the agency & shall be reimbursed by the department on production of receipt in original. | 670 | cum | 263.95 | ₹1,76,846.5 |
| 5 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | 8,100 | sqm | 131.75 | ₹10,67,175 |
| 6 | Deduct Correction Factor on DSR Item @ 0.973 | 0.03 | currection factor | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.21 MB
BOQ_384839.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .