| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 CrAdmitted-Finance | -0.15% | ₹2.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.9 Cr+₹29,310.26 (0.10%)Admitted-Finance | -0.05% | ₹2.9 Cr+₹29,310.26 (0.10%) | L2 | Admitted-Finance |
Tender Value
₹2.9 Cr
EMD Value
₹5.9 L
Closing Date
27 Aug 2026, 12:00 pmClosed
SE RED Circle Basti
O/O SE RED Circle Basti
Japnad Basti ke Vikas Khand Parasrampur ke Awasiya Bhawano ka nirman karya
2026_REDUP_1109121_3
879/RED/Tender/File No/Bond Clerk/2025-26 Dt. 20.03.25
Open Tender
Civil Works
Percentage
270 days
works
as per sbd
2 documents required · 2 mandatory
₹2,714
₹5.9 L
Yes
11 Sept 2026
15 Aug 2026
27 Aug 2026
15 Aug 2026
27 Aug 2026
15 Aug 2026
15 Aug 2026 - 27 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. DSR-2.8.1 | 771.42 | CUM | - | - |
| 2 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. (DSR-2.27) | 52.6 | CUM | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) (DSR-4.1.8) | 83.16 | CUM | 1 | ₹83.08 |
| 4 | Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor: With Chlorpyriphos/Lindane E.C. 20% with 1% concentration DSR 2.35.3 | 400.22 | Sqm | - | - |
| 5 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works upto plinth level Concrete of M25 grade with minimum cement content of 330 kg /cum DSR 5.33.1.1 | 1 | CUM | 1 | ₹1 |
| 6 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works above plinth level upto floor V level Concrete of M25 grade with minimum cement content of 330 kg /cum DSR 5.33.2.1 | 362.51 | CUM | - | - |
| 7 | Add for using extra cement in the items of design mix over and above the specified cement content therein. DSR 5.35 | 197.68 | QTL | 1 | ₹197.48 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete . Thermo-Mechanically Treated bars of grade Fe-500D or more.(upto plinth) DSR 5.22.6 | 288.55 | QTL | - | - |
| 9 | Same as item no.-9 but for above plinth DSR 5.22.6 A | 478.25 | QTL | - | - |
| 10 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) DSR 6.1.2 | 70.01 | CUM | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.61 MB
Tendernotice_2.pdf
PDF • 1.05 MB
Tendernotice_3.pdf
PDF • 0.22 MB
Tendernotice_4.pdf
PDF • 0.21 MB
Tendernotice_5.pdf
PDF • 0.22 MB
BOQ_2212392.xls
BOQ • 0.49 MB
corrinew.pdf
Tender Documents • 0.68 MB
corriharriyaandpar.pdf
PDF • 1.00 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .