| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.3 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹17.0 L+₹1.7 L (10.8%)Admitted-Finance 1008 A PREMIER ENGINEERING COMPANY PURVI RITHANI MEERUT DELHI ROAD MEERUT UTTAR PRADESH 250103 INDIA | MEERUT | UTTAR PRADESH | 250103 | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Raj Engineering Co. L1 | Premier Engineering Company L2 |
|---|---|---|---|---|---|
| 1.00 | Supply of horizontal split casing pump set with impeller & neck ring (CF8), casing (CI), shaft & sleeve (SS-410) in fitted condition with suitable bearing having following duty point:-
Head : 45 mtr.
Discharge: 1708 m³/hr.
RPM : 986
Efficiency: 84%
Pump make: M&P/Jyoti/Lubi/Kirloskar/any
DJB approved make. | 1 | No. | 12,29,000 ₹14,50,220 Lowest | 13,60,000 ₹16,04,800 |
| 2.00 | Making and Supply of suitable size both side flange MS reducer to modify delivery & suction line as per site requirement. | 2 | Nos. | 15,000 ₹17,700 Lowest | 28,000 ₹33,040 |
| 3.00 | Supply of neoprene rubber insertion sheet (75% Neoprene) Make: Jyoti/ Deep Jyoti/DJB approved make. | 15 | Kg | 1,650 ₹1,947 Lowest | 5,100 ₹6,018 |
| 4.00 | Supply of Nut bolts and washer etc. as per site requirements | 30 | Kg | 3,300 ₹3,894 Lowest | 3,900 ₹4,602 |
| 5.00 | P/Fixing the M.S. base frame on the RCC foundation the job includes proper leveling and alignment. | 1 | Job | 33,000 ₹38,940 | 12,500 ₹14,750 Lowest |
| 6.00 | Dismantling of old pump with help of labour and material like welding machine, cutter set, welding rod etc. with adequate safety provision. Installation, Testing and Commissioning of new pump as per original position with proper alignment and also making of all electrical connections, fitting all valves, reducer, bends, other accessories with necessary required all sundry items for completion of work etc. in original position and testing / commissioning on full load as per the satisfaction of Engineer In-charge. Installation work includes labour like fitter, welder, cutter, helper, beldar, chowkidar, supervisor, and electrician and material like welding machine, cutter set, welding rod, nut bolt with washer, packing sheet etc. The work includes cartage, loading, unloading of material, adequate safety provision, pumping out water caused during the dismantling and installation work. Firm has to complete the work in all respect against this no extra payment given to the firm. | 1 | Job | 17,500 ₹20,650 Lowest | 30,000 ₹35,400 |
Tender Value
Refer Docs
EMD Value
₹38,400
Closing Date
9 Sept 2026, 3:00 pmClosed
EXECUTIVE ENGINEER (EM) M-11
GREATER KAILASH, PART-I, NEW DELHI
Replacement of 9.1 MGD pump of set No-5 at Sarai Kale Khan BPS under Jangpura Constituency AC-41.
2026_DJB_297748_2
NIT No. 20/EE(EM)M-11/(26-27)
Open Tender
Electrical Work/ Equipment
Works
60 days
EXECUTIVE ENGINEER (E/M) M-11
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Delhi Jal Board
₹38,400
Yes
24 Sept 2026
31 Aug 2026
9 Sept 2026
31 Aug 2026
9 Sept 2026
31 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 1 | Supply of horizontal split casing pump set with impeller & neck ring (CF8), casing (CI), shaft & sleeve (SS-410) in fitted condition with suitable bearing having following duty point:-
Head : 45 mtr.
Discharge: 1708 m³/hr.
RPM : 986
Efficiency: 84%
Pump make: M&P/Jyoti/Lubi/Kirloskar/any
DJB approved make. | 1 | No. | 80 | ₹80 | 18% |
| 2 | Making and Supply of suitable size both side flange MS reducer to modify delivery & suction line as per site requirement. | 2 | Nos. | 80 | ₹160 | 18% |
| 3 | Supply of neoprene rubber insertion sheet (75% Neoprene) Make: Jyoti/ Deep Jyoti/DJB approved make. | 15 | Kg | 80 | ₹1,200 | 18% |
| 4 | Supply of Nut bolts and washer etc. as per site requirements | 30 | Kg | 80 | ₹2,400 | 18% |
| 5 | P/Fixing the M.S. base frame on the RCC foundation the job includes proper leveling and alignment. | 1 | Job | 80 | ₹80 | 18% |
| 6 | Dismantling of old pump with help of labour and material like welding machine, cutter set, welding rod etc. with adequate safety provision. Installation, Testing and Commissioning of new pump as per original position with proper alignment and also making of all electrical connections, fitting all valves, reducer, bends, other accessories with necessary required all sundry items for completion of work etc. in original position and testing / commissioning on full load as per the satisfaction of Engineer In-charge. Installation work includes labour like fitter, welder, cutter, helper, beldar, chowkidar, supervisor, and electrician and material like welding machine, cutter set, welding rod, nut bolt with washer, packing sheet etc. The work includes cartage, loading, unloading of material, adequate safety provision, pumping out water caused during the dismantling and installation work. Firm has to complete the work in all respect against this no extra payment given to the firm. | 1 | Job | 80 | ₹80 | 18% |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.36 MB
BOQ_396763.xls
BOQ • 0.29 MB
corrigendum1.pdf
PDF • 0.36 MB
corrigendum1.pdf
PDF • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .