Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 LAccepted-Finance | ₹4.5 L | L1 | Accepted-Finance accepted |
| 2 | l2₹4.5 L+₹2,750.95 (0.61%)Accepted-Finance PLOT NO 13 II ND CROSS STREET RAMESH NAGAR VALASARAVAKKAM CHENNAI 600 087 | CHENNAI | CHENNAI | TAMIL NADU | 600087 | ₹4.5 L+₹2,750.95 (0.61%) | l2 | Accepted-Finance accepted |
| 3 | l3₹4.8 L+₹28,070.84 (6.25%)Accepted-Finance TAMIL NADU TAMIL NADU | TIRUNELVELI | TAMIL NADU | 627001 | ₹4.8 L+₹28,070.84 (6.25%) | l3 | Accepted-Finance accepted |
Tender Value
₹5.6 L
EMD Value
₹5,700
Closing Date
14 Aug 2026, 3:00 pmClosed
ZONAL OFFICER VIII
NO-36 B,PULLA AVENUE ,SHENOY NAGAR ,CHENNAI-600030
IMPROVEMENT WORKS IN UPHC AT JAGANNATHAPURAM 2ND STREET IN DIVISION 108, UNIT 23, ZONE 8
2026_CoC_690691_1
Z.O.VIII.C.NO.E1/5544/2026
Open Tender
Civil Works
Works
90 days
GREATER CHENNAI COPORATION ZONE-VIII
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹5,700
18 Aug 2026
4 Aug 2026
14 Aug 2026
4 Aug 2026
14 Aug 2026
4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Brick work in following Cement Mortar using best q...Executive Engineer in charge. In Cement Morter 1:3Help | 1.5 | CUM | 8,192.9 | ₹12,289.35 |
| 2 | Plastering the surface of walls with Cement Mortar...d as directed by the departmental officers. (Wall)Help | 8.5 | SQM | 317.59 | ₹2,699.52 |
| 3 | Supplying and fixing in position best quality appr...works] For Fixing the sink without CI bracketHelp | 1 | NOS | 4,220.61 | ₹4,220.61 |
| 4 | Supplying and fixing in position best quality and .... Colour Glazed Wash Hand Basin - without PedestalHelp | 10 | NOS | 4,974.03 | ₹49,740.3 |
| 5 | SS Heavy Duty Long Body Tap 15mmHelp | 12 | EACH | 1,545 | ₹18,540 |
| 6 | Supplying and fixing in position best quality appr... use on works] For fixing the sink with CI bracketHelp | 4 | NOS | 5,254.81 | ₹21,019.24 |
| 7 | Supplying, fabricating and fixing in position of A...e got approved by the Executive Engineer incharge.Help | 38 | SQM | 7,572.29 | ₹2,87,747.02 |
| 8 | Manufacturing, Supplying and Fixing of Stainless S...onveyance, electrical charges, etc. completeHelp | 3 | SQM | 5,536 | ₹16,608 |
| 9 | Supplying and fixing in position best approved of ...rtmental officers 110mm dia PVC Pipe for One FloorHelp | 40 | R/M | 717.49 | ₹28,699.6 |
| 10 | Supplying, laying and jointing UPVC pipes of Class...ve ground level. For laying UPVC pipes of dia 25mmHelp | 100 | R/M | 255.34 | ₹25,534 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.39 MB
TENDERDOCUMENT.pdf
Tender Documents • 0.95 MB
BOQ_830423.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .