Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 CrAdmitted-Finance | ₹6.7 Cr | L1 | Admitted-Finance |
| 2 | Rejected-Technical 64 1 EXSERVICE MAN COLONY BHAVANISAGAR 638451 SATHYAMANGALAM TK ERODE DISTRICT TAMIL NADU | ERODE | TAMIL NADU | 638451 | - | - | Rejected-Technical BQR not satisfied |
| Sl No | Description | Qty | Unit | K.RAJAGOPALAN AND CO L1 |
|---|---|---|---|---|
| 1.00 | Removal of bushes and vegetations with uprooting Down stream side , Up stream side & road side and disposing of the same as directed by the Engineer in charge of the works as per technical specification. | 10,200 | m2 | 8 ₹81,600 Lowest |
| 2.00 | Dismantling the existing Mangalore tiles in the roof including cost of labour, lead, lift, and transporting the debries away from the site and including reduction realization of scap value which to be taken away by the contractor , etc.,complete complying with standard specifications. | 430 | m2 | 35 ₹15,050 Lowest |
| 3.00 | Dismantling the existing Corrugated Iron Sheet in the roof including cost of labour, lead, lift, transporting the debries away from the site and including reduction realization of scap value which to be taken away by the contractor etc., complete complying with standard specifications. | 692 | m2 | 50 ₹34,600 Lowest |
| 4.00 | Dismantling the existing AC sheet roof including cost of labour, lead, lift and transporting the debries away from the site and including reduction realization of scap value which to be taken away by the contractor etc., complete complying with standard specifications. | 747 | m2 | 30 ₹22,410 Lowest |
| 5.00 | Dismantling the existing Doors and Windows , Ventilator including removal of frames, hinges, fastenings including cost of labour, lead, lift, and transporting the debries away from the site including reduction realization of scap value which to be taken away by the contractor etc., complete complying with standard specifications. | 206 | m2 | 215 ₹44,290 Lowest |
| 6.00 | Dismantling the existing framed timbers in roof including cost of labour, lead, lift, and transporting the debries away from the site including reduction realization of scap value which to be taken away by the contractor etc., complete complying with standard specifications. | 10 | m3 | 1,000 ₹10,000 Lowest |
| 7.00 | Dismantling the existing Brick / RR masonry wall including cost of labour, lead, lift, transporting the debris away from the site etc., complete complying with standard specifications. | 242 | m3 | 350 ₹84,700 Lowest |
| 8.00 | Dismantling the existing PCC Concrete including cost of labour, lead, lift, transporting the debris away from the site etc., complete complying with standard specifications. | 60 | m3 | 650 ₹39,000 Lowest |
| 9.00 | Chipping the cement concrete and roughening the surface including cost of labour, lead, lift, transporting the debris away from the site etc., complete. | 65 | m2 | 55 ₹3,575 Lowest |
| 10.00Earth work excavation in hard stiff clay, stiff black cotton, hard red earth, shale, murram gravel, stoney earth & earth mixed with small size boulders and hard gravelly soil and depositing the earth in the places shown by the Engineer with initial lead of 10 M and initial lift of 2 m etc., complete, for upstream side retaining wall, kerb wall and fencing work complying with standard specifications. | ||||
Tender Value
Refer Docs
EMD Value
₹10 L
Closing Date
27 Apr 2026, 2:00 pmClosed
The Chief Engineer/Civil DRIP, TNGECL/HQ
The Chief Engineer/Civil DRIP, TNGECL, III floor Eastern wing, NPKRR Maaligai,144 Anna SAlai, Chennai- 600002
Dam Rehabilitation and Improvement Project works to Kundahpalam Dam ( Civil Mechanical and Electrical Works - Package I) in Kundah Generation Circle, Nilgiris District, Tamil Nadu under World Bank funded DRIP (Phase II )
2026_EBMDB_673848_2
DRIP (Phase II )/ CE/ C/ DRIP/ PD/ SPMU/ NCB No.09 /2025-26
Open Tender
Civil Works - Others
Item Rate
450 days
The Nilgiris
As per Specification
5 documents required · 5 mandatory
₹0
₹10 L
Yes
16 Jul 2026
10 Apr 2026
27 Apr 2026
10 Apr 2026
27 Apr 2026
15 Apr 2026
13 Apr 2026 - 17 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Removal of bushes and vegetations with uprooting Down stream side , Up stream side & road side and disposing of the same as directed by the Engineer in charge of the works as per technical specification. | |||||
| 2Dismantling the existing Mangalore tiles in the roof including cost of labour, lead, lift, and transporting the debries away from the site and including reduction realization of scap value which to be taken away by the contractor , etc.,complete complying with standard specifications. | |||||
| 3Dismantling the existing Corrugated Iron Sheet in the roof including cost of labour, lead, lift, transporting the debries away from the site and including reduction realization of scap value which to be taken away by the contractor etc., complete complying with standard specifications. | |||||
| 4Dismantling the existing AC sheet roof including cost of labour, lead, lift and transporting the debries away from the site and including reduction realization of scap value which to be taken away by the contractor etc., complete complying with standard specifications. | |||||
| 5Dismantling the existing Doors and Windows , Ventilator including removal of frames, hinges, fastenings including cost of labour, lead, lift, and transporting the debries away from the site including reduction realization of scap value which to be taken away by the contractor etc., complete complying with standard specifications. | |||||
| 6Dismantling the existing framed timbers in roof including cost of labour, lead, lift, and transporting the debries away from the site including reduction realization of scap value which to be taken away by the contractor etc., complete complying with standard specifications. | |||||
| 7Dismantling the existing Brick / RR masonry wall including cost of labour, lead, lift, transporting the debris away from the site etc., complete complying with standard specifications. | |||||
| 8Dismantling the existing PCC Concrete including cost of labour, lead, lift, transporting the debris away from the site etc., complete complying with standard specifications. | |||||
| 9Chipping the cement concrete and roughening the surface including cost of labour, lead, lift, transporting the debris away from the site etc., complete. | |||||
| 10Earth work excavation in hard stiff clay, stiff black cotton, hard red earth, shale, murram gravel, stoney earth & earth mixed with small size boulders and hard gravelly soil and depositing the earth in the places shown by the Engineer with initial lead of 10 M and initial lift of 2 m etc., complete, for upstream side retaining wall, kerb wall and fencing work complying with standard specifications. | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
BIDKP1.pdf
Tender Documents • 7.24 MB
BOQ_812034.xls
BOQ • 0.44 MB
Corrigendum.pdf
Additional Documents • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].