Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹3.2 L+₹7,784.90 (2.46%)Admitted-Finance SUBASHGRAM DIGLIPUR | L2 | Admitted-Finance | |
| 3 | L3₹3.2 L+₹8,267 (2.61%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | P L PALANIVELU L2 | RANJIT BAROI L3 | YUG CIVIL CONSTRUCTION AND ELECTRICAL COOPERATIVE SOCIETY LIMITED L1 |
|---|---|---|---|---|---|---|
| 1.00Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | ||||||
| 1.01 | All kinds of soil. | 17.09 | cum | 300 ₹5,127 Lowest | 350 ₹5,981.5 | 300 ₹5,127 Lowest |
| 2.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 12.98 | cum | 280 ₹3,634.4 | 250 ₹3,245 Lowest | 280 ₹3,634.4 |
| 3.00Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | ||||||
| 3.01 | 1:3:6 (1 Cement : 3 Pulverised sand (zone-III) derived from natura sources : 6 graded stone aggregate 40 mm nominal size derived from natura sources) | 3.73 | cum | 11,200 ₹41,776 | 9,000 ₹33,570 Lowest | 11,200 ₹41,776 |
| 3.02 | 1:4:8 (1 Cement : 4 Pulverised sand (zone-III) derived from natura sources : 8 graded stone aggregate 40 mm nominal size derived from natura sources) | 1.84 | cum | 10,000 ₹18,400 | 8,000 ₹14,720 Lowest | 10,000 ₹18,400 |
| 4.00Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing : | ||||||
| 4.01 | 1:3:6 (1 Cement : 3 Pulverised sand (zone-III) derived from natura sources : 6 graded stone aggregate 20 mm nominal size derived from natura sources) | 4.05 | cum | 11,900 ₹48,195 | 11,000 ₹44,550 Lowest | 11,900 ₹48,195 |
| 5.00Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : | ||||||
| 5.01 | 1:1.5:3 (1 cement : 1.5 Pulverised sand (zone-III) derived from natura sources: 3 graded stone aggregate 20 mm nominal size derived from natura sources). | 1.82 | cum | 12,500 ₹22,750 Lowest | 13,800 ₹25,116 | 12,500 ₹22,750 Lowest |
Tender Value
₹5.0 L
EMD Value
₹10,023
Closing Date
27 Nov 2025, 3:00 pmClosed
Executive Engineer PRI NMA Mayabunder
Office of Executive Engineer PRI NMA Mayabunder
Construction of Box culvert between Indubhusan Nandi and Hiralal Chakraborty house at Ward No. 06 under Gram Panchayat, Ramangar.
2025_RDPRI_20668_1
138/EE/PRI/NMA/MB/25-2026
Open Tender
Civil Works - Others
Works
90 days
Ramnagar
Refer Tender Document
5 documents required · 5 mandatory
₹500
Executive Engineer PRI NMA Mayabunder
₹10,023
3 Dec 2025
21 Nov 2025
27 Nov 2025
21 Nov 2025
27 Nov 2025
21 Nov 2025
stage.html
html • 0.03 MB
technical_21888.pdf
techsummary_21888.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
NIT138GPRamnagar.pdf
Tender Documents • 3.18 MB
BOQ_21888.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .