Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.5 LAccepted-AOC 6273 BLOCK G AEROCITY DISTT MOHALI | AEROCITY | MOHALI | ₹17.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹20.0 L+₹2.5 L (14.5%)Rejected-Finance VPO MOTEMAJRA DISTT TEHSIL SAS NAGAR MOHALI PB | ₹20.0 L+₹2.5 L (14.5%) | L2 | Rejected-Finance Higher Rates |
| 3 | L3₹20.5 L+₹3.0 L (16.9%)Rejected-Finance | ₹20.5 L+₹3.0 L (16.9%) | L3 | Rejected-Finance Higher Rates |
Tender Value
₹21.1 L
EMD Value
₹42,216
Closing Date
8 Jul 2026, 11:00 amClosed
Er Sanjay Sahni
EEPH8 Chd
Renovation of toilets in DRR and Writ Branch in the premises of Honble Punjab and Haryana High Court Sector-1, Chandigarh
2026_CHD_93721_1
PH8/2026/63
Open Tender
Public Health Products
Percentage
120 days
Chandigarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹42,216
26 Aug 2026
2 Jul 2026
8 Jul 2026
2 Jul 2026
8 Jul 2026
2 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. . .2.8 | |||||
| 1.01 | All kinds of Soil. .2.8.1 | 5 | Cum | 253.27 | ₹1,266.35 |
| 2Excavating trenches by mechinical / manual means of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, for all depth, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : .2.1 | |||||
| 2.01 | All kinds of soil .2.10.1 | - | - | - | - |
| 2.02 | Pipes, cables etc, not exceeding 80 mm dia. .2.10.1.1 | 38 | Meter | 209.78 | ₹7,971.64 |
| 2.03 | Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia .2.10.1.2 | 39 | Meter | 342.64 | ₹13,362.96 |
| 3Providing and laying in position cement concrete of specified grade excludingthe cost of centering and shuttering - All work up to plinth level : .4.1 | |||||
| 3.01 | 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) .4.1.3 | 6 | Cum | 7,665.78 | ₹45,994.68 |
| 3.2 | 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) .4.1.10 | 10 | Cum | 6,342.6 | ₹63,426 |
| 4 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). .5.3 | 0.62 | Cum | 11,194.85 | ₹6,940.81 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.25 MB
BOQ_114815.xls
BOQ • 0.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .